Hole Coordinates East North Elevation Azimuth (N°)

The document contains details of drilling coordinates, azimuths, dips, depths, and status of 27 drill holes labeled CG-17-001 through CG-17-024. It also includes schedules showing the planned progression of drilling for holes CG-17 and CT-17 over the months of July, August, September and October indicating expected meterage to be drilled daily. A table provides depth, repair, and logging information for each completed CG-17 hole.

Uploaded by

Christian CR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views13 pages

Hole Coordinates East North Elevation Azimuth (N°)

The document contains details of drilling coordinates, azimuths, dips, depths, and status of 27 drill holes labeled CG-17-001 through CG-17-024. It also includes schedules showing the planned progression of drilling for holes CG-17 and CT-17 over the months of July, August, September and October indicating expected meterage to be drilled daily. A table provides depth, repair, and logging information for each completed CG-17 hole.

Uploaded by

Christian CR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Coordinates Azimuth

Hole
East North Elevation (N°)
CG-17-007 201278.72 8399019.44 4226.07 202
CG-17-008 201659.30 8398949.00 4259.37 343
CG-17-012 202283.79 8399473.60 4339.41 274
CG-17-013 202160.20 8399756.00 4364.37 250
CG-17-014 201451.09 8400140.00 4360.87 23
CG-17-016 200911.60 8399561.91 4233.72 260
CG-17-014B 201380.00 8400000.00 4367.94 135°
CG-17-018 201360.00 8399290.00 4260.00 45°
CG-17-019 202100.00 8399960.00 4410.00 225°
CG-17-023 201320.00 8400110.00 4350.00 135°
CG-17-024 202115.00 8399840.00 4380.00 225°
CG-17-009 201854.20 8399038.94 4253.22 146
CG-17-010 202035.10 8399113.00 4274.86 125
CG-17-021 201880.00 8399130.00 4295.00 270°
CG-17-022 201240.00 8399390.00 4275.00 45°
SUB-TOTAL
CG-17-011 202096.77 8399322.62 4321.06 102
CG-17-015 200828.20 8400044.19 4271.53 315
CG-17-017 201460.00 8399180.00 4260.00 45°
CG-17-020 202050.00 8399300.00 4320.00 270°
SUB-TOTAL
Dip Final Depth
Planned Depth (m) Status
(°) (m)
-75 170.00 170.00 Finished
-71 200.00 182.50 Finished
-58 200.00 200.00 Finished
-75 200.00 200.00 Finished
-70 230.00 230.00 Finished
-70 200.00 200.20 Finished
-65° 200.00 200.00 Finished
-65° 100.00 200.00 Finished
-65° 100.00 109.90 Finished
-65° 100.00 100.20 Finished
-65° 100.00 100.20 Finished
-65 200.00 200.00 Process
-70 200.00 170.00 Process
-65° 100.00 100.00 Process
-65° 100.00 100.00 Process
200.00 2,463.00
-75 200.00 Planned
-80 200.00 Planned
-65° 100.00 Planned
-65° 100.00 Planned
600.00
Coordinates Azimuth
Hole
East North Elevation (N°)
CT-17-025 201808.00 8399942.00 4370.00 45
SUB-TOTAL
CT-17-070 202075.00 8399620.00 4352.00 245
CT-17-065 201605.00 8399829.00 4368.00 150
CT-17-129 201440.00 8399514.00 4172.00 335
CT-17-117 201588.00 8399566.00 4172.00 114
CT-17-278 201488.00 8399400.00 4170.00 1
CT-17-133 201645.00 8399487.00 4155.00 0
CT-17-172 201755.00 8399457.00 4155.00 7
CT-17-062 201794.00 8399327.00 4155.00 358
CT-17-100 201304.00 8399653.00 4292.00 83
CT-17-185 201353.00 8399785.00 4334.00 97
CT-17-216 201200.00 8399930.00 4337.00 325
CT-17-270 201252.00 8399876.00 4333.00 142
CT-17-232 201400.00 8399233.00 4255.00 44
TOTAL
Dip
Planned Depth (m) Zone Status
(°)
-80 160.00 Operation - PH02 Finished
160.00
-62 260.00 Operation - PH02
-50 340.00 Operation - PH02
-81 325.00 Operation - PH01
-77 255.00 Operation - PH01
-86 475.00 Operation - PH01
-89 260.00 Operation - PH01
-68 100.00 Operation - PH01
-62 110.00 Operation - PH01
-52 630.00 Out Operation
-73 470.00 Out Operation
-70 329.00 Out Operation
-81 490.00 Out Operation
-70 580.00 Out Operation
4,624.00
Código de Perforación July
Profundidad Proyectada (m)
30 31 1 2 3 4 5 6 7 8 9
CG-17-021 100.00 1 2
CG-17-022 100.00 1
CG-17-011 200.00
CG-17-015 200.00
CG-17-017 100.00
CG-17-020 100.00

Código de Perforación August


Profundidad Proyectada (m)
3 4 5 6 7 8 9 10 11 12 13
CT-17-025 160.00 1 2 3 4 5
CT-17-070 300.00
CT-17-065 350.00
CT-17-129 330.00
CT-17-117 260.00
CT-17-278 405.00
CT-17-133 300.00
CT-17-172 160.00
CT-17-062 160.00
CT-17-100 490.00
CT-17-185 470.00
CT-17-216 330.00
CT-17-270 495.00
CT-17-232 450.00

1st Machine 1
2nd Machine 1
3rd Machine 1
GEOTECHNICAL (25 m / day)
August
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
3 4
2 3 4
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1 2 3 4

GEOMET (30 m / day)


August
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9

1 2 3
September
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 2 3 4

MET (30 m / day)


September
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10

4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 2 3 4
October
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 2 3 4 5 6
1 2 3 4 5 6

13 14 15 16
1 2 3 4 5 6 7 8 9 10 11

5 6 7 8 9 10 11 12 13 14 15
Depth Rep Lab Log
CG-17-001 x x
CG-17-002 x x
CG-17-003 x x
CG-17-004 x x
CG-17-005 x x
CG-17-006 x x
CG-17-007 170.00 x x
CG-17-008 182.50 x x
CG-17-012 200.00 x
CG-17-013 200.00 x
CG-17-014 230.00 x
CG-17-016 200.20 X x
CG-17-014B 200.00 x
CG-17-018 200.00
CG-17-019 109.90 x x
CG-17-023 100.20 x x
CG-17-024 100.20 x x
CG-17-009 200.00
CG-17-010 170.00
CG-17-021 100.00
CG-17-022 100.00