3.14 Drainage Work (Class P) PDF

1. The document provides rates for various drainage works including excavation, construction of surface and subsurface drains, culverts, sumps, and manholes. 2. Excavation rates range from RM5.10 to RM16.39 per cubic meter depending on trench depth and material. Construction of drains made of concrete or reinforced concrete range from RM417.33 to RM1,220 per meter. 3. Precast concrete culverts installation costs range from RM250 to RM727 per meter depending on diameter. Box culverts range from RM860 to RM1,373.39 per meter. 4. Sump and manhole construction costs range from RM800 to RM3,
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
694 views5 pages

3.14 Drainage Work (Class P) PDF

1. The document provides rates for various drainage works including excavation, construction of surface and subsurface drains, culverts, sumps, and manholes. 2. Excavation rates range from RM5.10 to RM16.39 per cubic meter depending on trench depth and material. Construction of drains made of concrete or reinforced concrete range from RM417.33 to RM1,220 per meter. 3. Precast concrete culverts installation costs range from RM250 to RM727 per meter depending on diameter. Box culverts range from RM860 to RM1,373.39 per meter. 4. Sump and manhole construction costs range from RM800 to RM3,
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

BAHAGIAN 3.

14 : DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2013 (RM)


BIL KETERANGAN KERJA UNIT KAWASAN KAWASAN KAWASAN
KESELURUHAN
UTARA TENGAH TIMUR

DRAIN EXCAVATION

1 Trench excavation for construction of m3 10.00 10.00


new pipe culvert size 900 mm not
exceeding 1.50m depth, get out and
remove to a tip to be provided by the
contractor away from the work site
including backfilling of excavated
material.

2 Excavation for concrete drain m3 5.10 5.10


commensing from existing ground
surface to a depth and grade and
dispose at contractor dumpsite.

3 Trench excavation for construction of m3 16.39 16.39


new box culvert size1800 mm bottom
width with 1800 mm depthnot
exceeding 2.50m depth, get out and
remove to a tip to be provided by the
contractor away from the work site
including backfilling of excavated
material.

4 Excavate trenches in all material other m3 6.30 6.30


than rock for precast box culvert,
backfill and to remove all existing drain
to Contractor's dumping ground within
5 km radius.

38
BAHAGIAN 3.14 : DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2013 (RM)


BIL KETERANGAN KERJA UNIT KAWASAN KAWASAN KAWASAN
KESELURUHAN
UTARA TENGAH TIMUR
SURFACE DRAINS

5 Construction and completion 50mm x m 21.00 21.00


50mm gutter drain at both sides road
on exposed surfaces, bedded, jointed
and pointed in cement mortar (1:3) as
directed by the S.O.

Supply transport, lay and joint precast


concrete U drain including weepholes
with filter materials and cement
mortar grouting at joints.

6 3000mm x 2100mm. m 1,220.00 1,220.00

7 1800mm x 1500mm. m 633.00 633.00

8 Supply, delivery and install RC 'U' m 417.33 417.33


drains without dry weather flow
section sizes 500 mm bottom width
with 1000 mm depth.

9 Outlet drains; 450 mm diameter m 191.53 191.53


concrete pipe including fittings. Rate to
include bends, filter fabric and
concrete surround.

10 Supply, delivery and install RC 'U' m 1,157.08 1,157.08


drains without dry weather flow
section of the following sizes 1800 mm
bottom width with 1800 mm depth.

SUBSURFACE DRAINS

11 Supply and install 100 mm diameter of m 13.00 13.00


single wall HPDE Corrugated drainage
subsoil pipe 1.5m length at 1.5 c/c as
drainage system.

39
BAHAGIAN 3.14 : DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2013 (RM)


BIL KETERANGAN KERJA UNIT KAWASAN KAWASAN KAWASAN
KESELURUHAN
UTARA TENGAH TIMUR
CULVERTS

Supply and install Precast Reinforced


Concrete Pipe Culvert inclusive of
spigot and socket jointing with rubble
ring and backfilling of structure.

12 900mm diameter (Class Y) m 250.00 250.00

13 1200mm diameter (Class Y) m 350.00 350.00

14 1500mm diameter (Class Y) m 525.00 525.00

15 1800mm diameter (Class Y) m 727.00 727.00

16 1200 mm diameter single precast no. 1,235.00 1,235.00


concrete pipe culvert, Hume Class 'L' or
equivalent in standard length of 3.05
m.

17 Supply, delivery and install 900mm RC m 770.00 770.00


pipe culvert c/w lids without dry
weather flow section.

Supply and install Precast Reinforced


Concrete Box Culvert :
18 1500mm x 1500mm m 860.00 860.00

19 1800mm x 1500mm m 970.00 970.00

20 1800mm x 1800mm m 1373.39 1,300.00 1,336.70

21 3000mm x 2100mm m 2,170.00 2,170.00

22 3300mm x 2100mm m 2,300.00 2,300.00

23 Supply and lay well compacted sand m3 62.30 62.30


bedding for culvert.

24 Backfilling of culvert with suitable m3 4.50 4.50


materials to section as shown in the
drawing.

40
BAHAGIAN 3.14 : DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2013 (RM)


BIL KETERANGAN KERJA UNIT KAWASAN KAWASAN KAWASAN
KESELURUHAN
UTARA TENGAH TIMUR
SUMPS

Construction and completion brickwall


sump on exposed surfaces, bedded,
jointed and pointed in cement mortar
(1:3) with Precast Compress Concrete
Slab including all necessary excavation,
formwork and painting for following
sump:

25 3300mm x 3300 mm no. 3,770.00 3,770.00

26 600mm x 450mm no. 840.00 840.00

Construction and completion brickwall


sump on exposed surfaces, bedded,
jointed and pointed in cement mortar
(1:3) with Heavy Duty M.S Grating
including all trash screen to receive
inlet and outlet drains :

27 2400mm x 2400mm no. 2,970.00 2,970.00

28 1200mm x 1200mm no. 1,440.00 1,440.00

29 900mm x 900mm no. 1,150.00 1,150.00

30 600mm x 600mm no. 800.00 800.00

Supply and construct cast insitu


manholes including excavation,
backfilling, bedding, formwork,
concrete, reinforcement, pipe
openings, galvanished iron grating with
hinge, joint to existing drain and
disposal of surplus material.

31 0.9m x 0.9m, invert depth not no. 1,300.00 1,300.00


exceeding 1.5m.

32 1.2m x 2.1m, invert depth not no. 2,000.00 2,000.00


exceeding 1.5m.

41
BAHAGIAN 3.14 : DRAINAGE WORK (CLASS P)

PURATA KADAR HARGA 2013 (RM)


BIL KETERANGAN KERJA UNIT KAWASAN KAWASAN KAWASAN
KESELURUHAN
UTARA TENGAH TIMUR
33 Supply and construct 1050mm x no. 1,133.33 1,133.33
1050mm x 230mm thick brickwall
manhole within high alumina cement
render, R.C. base, inspection cover, C.I.
Steps, etc to depth not exceeding 1.5m
(internal dimension)Rate to include
excavation, backfilling, compaction and
disposal of surplus materials.

FLAP GATE

Supply, deliver and install HDPE Flap


Gates as per manufacturer
requirement and approved by S.O.
34 900mm diameter no. 12,200.00 12,200.00

35 1200mm diameter no. 15,700.00 15,700.00

36 1500mm diameter no. 23,000.00 23,000.00

37 1800mm diameter no. 29,000.00 29,000.00

38 1500mm x 1500mm square no. 15,200.00 15,200.00

39 1800mm x 1800mm square no. 30,500.00 30,500.00

42