1 Spread Footing: Foundation1 Number: 1: 1.1 Basic Data

This document summarizes the design of a spread footing foundation. It includes the geometry, assumptions, loads, materials, and reinforcement requirements. The foundation is designed for capacity and rotation according to code. Soil properties and geotechnical calculations are provided. Punching shear and moment demands are calculated and compared to code requirements. The required reinforcement is specified for the bottom and top of the footing. A material takeoff is also included.

Uploaded by

GEMPF
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views5 pages

1 Spread Footing: Foundation1 Number: 1: 1.1 Basic Data

This document summarizes the design of a spread footing foundation. It includes the geometry, assumptions, loads, materials, and reinforcement requirements. The foundation is designed for capacity and rotation according to code. Soil properties and geotechnical calculations are provided. Punching shear and moment demands are calculated and compared to code requirements. The required reinforcement is specified for the bottom and top of the footing. A material takeoff is also included.

Uploaded by

GEMPF
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 5

1 Spread footing: Foundation1 Number: 1

1.1 Basic data

1.1.1 Assumptions

 Geotechnic calculations according to : ACI


 Concrete calculations according to : ACI
318-11
 Shape selection : without limits

1.1.2 Geometry:

A = 6.60 (m) a1 = 0.40 (m) a2 = 0.40 (m)


B = 2.03 (m) b1 = 0.40 (m) b2 = 0.40 (m)
h1 = 0.76 (m) e2 = 6.00 (m)
h2 = 0.00 (m) ex = -0.10 (m) ey = 0.00 (m)
h4 = 0.05 (m)

a1' = 33.5 (cm) a2' = 33.5 (cm)


b1' = 33.5 (cm) b2' = 33.5 (cm)

c1 = 5.1 (cm)
c2 = 5.1 (cm)

1.1.3 Materials

 Concrete : CONCR_3.5; Characteristic


strength = 24.10 MPa
Unit weight = 2407.31 (kG/m3)
 Longitudinal reinforcement : type Grade
420 Characteristic strength = 420.00 MPa
 Transversal reinforcement : type Grade
300 Characteristic strength = 300.00 MPa
 Additional reinforcement: : type Grade
300 Characteristic strength = 300.00 MPa

1.1.4 Loads:

Foundation loads:
Case Nature Group Pier N Fx Fy Mx My
(kN) (kN) (kN) (kN*m) (kN*m)
DSGN1 design ---- 1 1040.00 0.00 0.00 0.00 0.00
2 1560.00 0.00 0.00 0.00 0.00

Backfill loads:
Case Nature Q1
(kN/m2)

1.1.5 Combination list

1/ ULS : DSGN1 N=2600.00 My=1560.00


2/* ULS : DSGN1 N=2600.00 My=1560.00

1.2 Geotechnical design

1.2.1 Assumptions

Foundation design for:


• Capacity
• Rotation
 Take account of plastic redistribution of allowable stresses

1.2.2 Soil:

Soil level: N1 = 0.00 (m)


Column pier level: Na = 0.00 (m)
Minimum reference level: Nf = -0.50 (m)

well graded gravels


• Soil level: 0.00 (m)
• Unit weight:2242.58 (kG/m3)
• Unit weight of solid: 2702.31 (kG/m3)
• Internal friction angle: 42.0 (Deg)
• Cohesion: 0.00 (MPa)

1.2.3 Limit states

1.3 RC design
1.3.1 Assumptions

 Concrete exposed to earth and weather : no

1.3.2 Analysis of punching and shear

Punching

Design combination ULS : DSGN1 N=2600.00 My=1560.00


Load factors: 0.90 * Foundation weight
0.90 * Soil weight
Design load:
Nr = 2817.26 (kN) Mx = -0.00 (kN*m) My = 1295.84
(kN*m)
Length of critical circumference: 2.46 (m)
Punching force: 1179.06 (kN)
Section effective height heff = 0.70 (m)
Shear stress: 0.68 (MPa)
Admissible shear stress: 0.69 (MPa)
Safety factor: 1.006 > 1

1.3.3 Required reinforcement

Spread footing:

bottom:

ULS : DSGN1 N=2600.00 My=1560.00


My = 11.78 (kN*m) Asx = 13.51 (cm2/m)

ULS : DSGN1 N=2600.00 My=1560.00


Mx = 425.99 (kN*m) Asy = 13.51 (cm2/m)

As min = 13.51 (cm2/m)

top:

ULS : DSGN1 N=2600.00 My=1560.00


My = -1721.77 (kN*m) A'sx = 33.60 (cm2/m)
A'sy = 0.00 (cm2/m)

As min = 13.51 (cm2/m)

Column pier: 1
Longitudinal reinforcement A = 0.00 (cm2) A min. = 0.00 (cm2)
A = 2 * (Asx1 + Asy1)
Asx1 = 0.00 (cm2) Asy1 = 0.00 (cm2)
Column pier: 2
Longitudinal reinforcement A = 0.00 (cm2) A min. = 0.00 (cm2)
A = 2 * (Asx2 + Asy2)
Asx2 = 0.00 (cm2) Asy2 = 0.00 (cm2)

1.3.4 Provided reinforcement

2.3.1 Spread footing:


Bottom:
Along X axis:
14 Grade 420 16 l = 6.93 (m) e = 1*-0.90 + 13*0.14
Along Y axis:
46 Grade 420 16 l = 2.36 (m) e = 1*-3.14 + 45*0.14
Top:
Along X axis:
14 Grade 420 25 l = 7.18 (m) e = 1*-0.90 + 13*0.14
Along Y axis:
15 Grade 420 10 l = 2.20 (m) e = 1*-3.14 + 14*0.45

2.3.2 Pier

Column pier: 1
Longitudinal reinforcement

Column pier: 2
Longitudinal reinforcement

Dowels
Longitudinal reinforcement
8 Grade 420 10 l = 1.29 (m) e = 1*-3.22 + 1*0.23 + 1*5.77 + 1*0.23

2 Material survey:
 Concrete volume = 10.23 (m3)
 Formwork = 13.16 (m2)

 Steel Grade 420


 Total weight = 738.88 (kG)
 Density = 72.26 (kG/m3)
 Average diameter = 17.8 (mm)
 Survey according to diameters:

Diameter Length Number:


(m)
10 1.29 8
10 2.20 15
16 2.36 46
16 6.93 14
25 7.18 14

You might also like