The document outlines the tariff rates for electricity in Bangladesh effective from March 1, 2007. It includes rates per KWh, demand charges, service charges, and minimum charges for various consumer categories including domestic, agricultural, small industry, non-residential, commercial, medium voltage, extra high voltage, high voltage, and street lights/pumps. Rates vary depending on the voltage level and time of use (peak vs off-peak hours). Higher rates are charged for consumption over certain thresholds within categories.

Uploaded by

orphy_123
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views2 pages

Tarif - 2007

The document outlines the tariff rates for electricity in Bangladesh effective from March 1, 2007. It includes rates per KWh, demand charges, service charges, and minimum charges for various consumer categories including domestic, agricultural, small industry, non-residential, commercial, medium voltage, extra high voltage, high voltage, and street lights/pumps. Rates vary depending on the voltage level and time of use (peak vs off-peak hours). Higher rates are charged for consumption over certain thresholds within categories.

Uploaded by

orphy_123
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TARIFF

(Effective from 1st March, 2007)

Consumer Range Rate/Kw Charges


Category h
Demand Service Minimum

Domestic 000-100 KWh Tk. 2.50 Tk. 10.00 Per KW Tk. 5.00 Per month Tk. 100 Per month
Category-A 101-400 KWh Tk. 3.15 sanctioned load for single phase & Tk
401 & above Tk. 5.25 25.00 per month for
for all units in 3-phase
KWh

Agricultural Flat Tk. 1.93 Tk. 35.00 Per KW 1 Phase Tk. 5.00 Tk. 125.00 Per H. P.
Pumping Per month 3 Phase Tk.25.00 (per month during
Category - B (for sanctioned per month season)
load above 30 KW)

Small Industry Flat Tk. 4.02 Tk. 35.00 Per KW Tk. 60.00 per month Not applicable
Category-C Peak Tk. 5.62 per month
Off peak Tk. 3.20 sanctioned load
(above 40KW)

Non- Tk. 3.35 Tk. 10 Per KW of 1Phase Tk. 5.00 Tk. 100
Residential sanctioned load 3 PhaseTk.25.00
Category-D

Commercial Flat Tk. 5.30 Tk. 20.00 Per KW Tk. 5.00 Per month Tk. 125 Per KW of
Category-E Peak Tk. 8.20 Per month (for for single phase & Tk sanctioned load per
Off peak Tk. 3.80 sanctioned load 25.00 per for month
above 40 KW) 3-phase

Medium Flat Tk. 3.80 Tk. 40.00 Per KW Tk. 350.00 per month Tk. 80.00 Per KW
Voltage 11 KV Peak Tk. 6.73 of sanctioned load sanctioned load but
General Off Peak Tk. 3.14 per month not less than Tk.
Category-F 8000.00 per month

Extra High DESA-132KV Tk. 2.34 Tk. 35 Per KW of Not Applicable Tk. 80.00 Per KW
Voltage DESA-33KV Tk. 2.39 sanctioned load sanctioned load
Category-G-1

Extra High Flat Tk. 2.82 Tk. 35.00 Per KW Tk. 80.00 Per KW Tk. 60.00 Per KW of
Voltage 132 2300-0600 hrs Tk. 1.49 of sanctioned load. sanctioned load connected load
KV General 0600-1300 hrs Tk. 2.48
Category-G-2 1300-1700 hrs Tk. 1.66
1700-2300 hrs Tk. 5.52

High Voltage Flat Tk. 3.58 Tk. 35.00 Per KW Tk. 400.00 Per Tk. 80.00 Per KW of
33 KV Peak Tk. 6.45 of sanctioned load month connected load
General Off Peak Tk. 3.03 per month
Category-H
Consumer Range Rate/Kwh Charges
Category
Demand Service Minimum

Category-I-1 Not Applicable Tk. 400.00 Not Applicable


REB
1)132KV Tk. 2.34

2)33KV

-Economically unsolvent Tk. 2.05

-Economically Margin
Tk. 2.05
-Economically solvent

Tk. 2.39

Category-I-2 Not Applicable Tk. 400.00 Not Applicable


DESCO Tk. 2.34
-132KV Tk. 2.39
-33KV

Category-I-3 Not Applicable Tk. 400.00 Not Applicable


WZPDCL Tk. 2.34
-132KV Tk. 2.39
-33KV

Category-I-4 Not Applicable Tk. 400.00 Not Applicable


Distribution Of BPDB
-132KV Tk. 2.34
-33KV Tk. 2.39

Category-I-5 Not Applicable Tk. 400.00 Not Applicable


Distribution Company in
Future
-132KV Tk. 2.34
-33KV Tk. 2.39

Street Lights & Tk. 3.86 Tk. 35 Per KW Tk. 200.00 Not Applicable
Pump sanctioned load
Category-J