0% found this document useful (0 votes)
157 views6 pages

Clean Copy Foundation Estimate Rev 1.9

This document provides a quantities estimate for horizontal and vertical vessel foundations. For the horizontal vessel foundation, it lists quantities for items including concrete, rebar, excavation and backfill. The total concrete quantity is 17 cubic yards split 83% plinth and 17% foundation. For the vertical vessel foundation, it again provides quantities for concrete, rebar, excavation and backfill. The total concrete quantity is 40 cubic yards split 60% plinth and 40% foundation. Comments are also included but not summarized.

Uploaded by

أحمد حسن
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views6 pages

Clean Copy Foundation Estimate Rev 1.9

This document provides a quantities estimate for horizontal and vertical vessel foundations. For the horizontal vessel foundation, it lists quantities for items including concrete, rebar, excavation and backfill. The total concrete quantity is 17 cubic yards split 83% plinth and 17% foundation. For the vertical vessel foundation, it again provides quantities for concrete, rebar, excavation and backfill. The total concrete quantity is 40 cubic yards split 60% plinth and 40% foundation. Comments are also included but not summarized.

Uploaded by

أحمد حسن
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Horizontal Vessel Foundation Quantities Estimate 21/07/2008 PR
Does not cover DRAINAGE!!
12 ft

140 in Dia
Vessel № test

THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL

plinth above Grd lvl


140 in 12 in
Grd slab thk'ness
6 in 39 in

36 in oversize for formwork


plinth below Grd 12 in 12 in

Z dir foundations Dims


Plinth by 50 in
36 in Base by 50 in 60 º

NOTE:- Excavations will merge, 60 in angle of excavation


Value's calculated for 1 large
4 in excavation, Consider a tied foundation!

Depth of lean mix to Safe Bearing, for the full excaveded oversized plan area.

NOTE: Note: Plinth/ pedestal


Assumptions, Min 4000 psi Concrete, 60000 psi may be the same size
Re-bar, 2.5 in cover; on rock or equivalent, providing as the base, eg if in rock!
Min Safe Bearing of 1000 psf and a max peir ht
of 48 in. Vessel Max Wt, 6000 lbs , Vessel Min Wt
5555 lbs and 7777 kip-ft Max Bending Moment.
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
7.3
1 612 221.4
17 83
5.8
2 43.4
76
36.5
3 5.7 315
11 %
item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Vertical Vessel Foundation Quantities Estimate 21/07/2008 PR
Does not cover DRAINAGE!!
NOTE:
Assumptions, Min 4000 psi Concrete, 60000 psi
Re-bar, 2.5 in cover; on rock or equivalent, providing
140 Min Safe Bearing of 1000 psf and a max plinth ht
in Dia of 48 in. Vessel Max Wt, 6000 lbs , Vessel Min Wt
5555 lbs and 7777 kip-ft Max Bending Moment.
Vessel №
test
NOTE THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL
Ves Ht 170 ft

6 in

plinth above Grd lvl


Sk/Ht 8 ft 12 in Grd slab thk'ness
6 in

Grd Lvl

plinth below Grd


36 in
152 in oversize for formwork
12 in
Z dir foundations Dims
36 in Plinth by 152 in 85 º
Base by 200 in angle of excavation

200 in Note: Plinth/ pedestal


may be the same size
as the base.

Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
4 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
59
1 285 461.4
40 60
7.2
2 79
79
26
3 4.2 233
17 %

item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Pump Foundation Quantities Estimate 23/6/2009 PR 1
Does not cover DRAINAGE!!

NOTE:
Z dir foundations Dims Assumptions, Min 4000 psi Concrete, 60000 psi
Plinth by 36 in Re-bar, 2.5 in cover; on rock or equivalent, providing
Base by 36 in Min Safe Bearing of 2000 psf and a max plinth ht
of 12 in above ground. Pump Max Wt, N/A lbs.

NOTE THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL


Pump №
P-203X A/B
Pump Size 40 in
length 20 in
width 20 in
plinth above Grd lvl
12 in Grd slab thk'ness
6 in

Grd Lvl

plinth below Grd


0 in
oversize for formwork
84 in 12 in

46 in 45 º
angle of excavation

84 in Note: Plinth/ pedestal


may be the same size
as the base.

Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
2 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
4.1
1 323 106.7
19 81
3.4
2 13.4
55
10.2
3 3 167
20 %

item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1
CLIENT

Company Name Here 0


Company Address here
0 PROJECT
Tele No. 0
Fax No.
JOB NO. SUBJECT DATE BY Sheet Rev №
0 Column Foundation Quantities Estimate 21/07/2008 PR
Does not cover DRAINAGE!!
NOTE:
Assumptions, Min 4000 psi Concrete, 60000 psi
Re-bar, 2.5 in cover; on rock or equivalent, providing
Min Safe Bearing of 1000 psf and a max Stool ht
of 48 in. Max Axial load, 6000 lbs , Min Axial Load
5500 lbs and 7777 kip-ft, Max column Bending Moment.
Column on Grid
12-f
NOTE THIS PICTURE IS DIAGRAMMATIC and NOT ACTUAL

Z dir foundations Dims


Plinth by 200 in W 14 x 132
Base by 200 in

31 in
Stool ht above Grd lvl
12 in Grd slab thk'ness
6 in
200 in
Grd Lvl

plinth below Grd


36 in
oversize for formwork
12 in

36 in 65 º
angle of excavation

200 in Note: Plinth/ pedestal


may be the same size
as the base.

Depth of lean mix to Safe Bearing, lean mix assumed to have vertical faces,
for the oversized plan area.
4 in lean mix/mud mat
Note the formwork has an allowance of 6 inches extra on the Ht.
Item # Demo Repair Concrete Re-bar Excavation Back fill Formwork
yds³ yds³ yds³
yds³ lbs yds³ ft²
liner ft % split % stone
76.4
1 519 500
54 46
10.5
2 96.6
96
30.6
3 5.4 298
18 %

item 1 - New Vessel foundations, piers re-bar and formwork. % split plinth, foundation
item 2 - Concrete paving Demo, excavation for the Foundations. Liner Length of Saw Cut
item 3 - Patching the Concrete paving once foundations completed. % of total as Stone backfill
COMMENTS
SHT. OF
1 1

You might also like