DATE: APRIL O4, 2018
PROJECT : HRM & Forestry Building Aircon Power Supply
SUBJECT : Electrical Load Computation
Forestry (18- 2.5HP Units Aircon) Voltage drop calculations fr
PB-01
Total Connected Load :
VA = 14.0 x 230 x 18 Vd = 1.732 (I) (Z/m) (L)
VA = 57,960 VA Vd = 1.732 (149.16) (0.094
AMPACITY Vd= 5.09
AT = ( 57,960 / (1.73 x 230)) + (0.25 x 14.0) Voltage at Panelboard PB-0
AT = 149.16 A V = 230-5.09 =224.91V
%VD = 5.09 x 100%/230= 2
Main : 200AT, MCCB, 3P, B.O., 36KAIC @ 240V Note: Percent voltage drop
Branches: 18 - 40AT, MCB, 2P, B.O., 20KAIC @ 240V
6 - Spare
Use : 3- 80 mm2 THW Wire in 50mmø RMC Pipe.
1-14mm2 THW Wire
HRM (8 - 2.5HP Units Aircon)
PB-02 Voltage drop calculations fr
Total Connected Load :
VA = 14.0 x 230 x 8 Vd = 1.732 (I) (Z/m) (L)
VA = 25,760 VA Vd = 1.732 (68.23) (0.20/3
AMPACITY Vd= 2.32
AT = (25,760 / (1.73 x 230)) + (0.25 x 14.0) Voltage at Panelboard PB-0
AT = 68.23 V = 230-2.32 =227.68V
%VD = 2.32 x 100%/230= 1
Main : 1- 125AT, MCCB, 3P, B.O., 36KAIC @240V Note: Percent voltage drop
Branches: 8- 40AT, MCB, 2P, B.O., 20KAIC@240V
6 - Spare
Use : 3-30mm2 THW Wire in 40mmø RMC Pipe
MAIN PANEL :
Total Connected Load :
= PB-01 + PB-02 +75KVA Existing Load
= 57,960+25,760+74,805.2
= 158,525.2
AMPACITY
I= 158,525.2 VA
√3 x 230V
I = 398.40A
PANEL : MTS/MDP Free Standing w/ Swinging Front door opening
MAIN : 2-800AT, MCCB, 3P,B.O. 50KAIC@240V
Branches: 2 -200AT,3P,36KAIC@240V
1-125AT,3P,36KIAC@240V
1-150AT,3P,36KAIC@240V
2 -Spare 200AF as spare busbar
Size of Main Feeder
Use: 2 sets of (3 - 250mm2 THW Wire in 80mmø RMC Pipe)
Voltage drop calculations from MDP to PB-01(FORESTRY)
Vd = 1.732 (I) (Z/m) (L) Where:
Vd = 1.732 (149.16) (0.094/305) (64)/1 I = Load Current AT
Z/m = Impedance of cable per 305meter ( Note: Refer to PEC table 9.119)
Voltage at Panelboard PB-01 L= length of cable from MDP to PB
V = 230-5.09 =224.91V n = number of parallel path
%VD = 5.09 x 100%/230= 2.21%
Note: Percent voltage drop must not be more than 5%
Voltage drop calculations from MDP to PB-01(FORESTRY)
Vd = 1.732 (I) (Z/m) (L) Where:
Vd = 1.732 (68.23) (0.20/305) (30)/1 I = Load Current AT
Z/m = Impedance of cable per 305meter ( Note: Refer to PEC table 9.119)
Voltage at Panelboard PB-01 L= length of cable from MDP to PB
V = 230-2.32 =227.68V n = number of parallel path
%VD = 2.32 x 100%/230= 1.0%
Note: Percent voltage drop must not be more than 5%
TRANSFORMER CAPACITY
KVA =1.732 X398.40X230/1000
KVA = 158.71
USE: 3 X100KVA SINGLE PHASE DISTRIBUTION TRANSFORMER
7.96KV/230V,DOUBLE BUSHING OISC,BANKED INTO
WYE-DELTA CONNECTION