PROSPECTIUNI SA
TECHNICAL BID
Documentation for the rehabilitation through the valorification of the tailings from the dump
ROMPLUMB , Baia Mare
Technical bid
A. Introduction..................................................................................................... page 3
B. Presentation PROMEDIU............................................................................... page 3
C. Skills.................................................................................................................page 3
D. Experience....................................................................................................... page 3
E. Technical equipment........................................................................................ page 5
F. Services..............................................................................................................page 6
G. Certifications.................................................................................................... page 6
H. Contacts ............................................................................................................page 7
I. Credentials......................................................................................................... page 8
-PM67-EX/CV/01, October 2015-
A. Introduction
ProMediu (R), a division of PROSPECTIUNI SA wishes to thank SC EXITECO SRL
for the opportunity to present our services reguarding the rehabilitation of the dump on the
ROMPLUMB platform and the the recovery of the material in order to be capitalized,
according to your request.
We are interested in this type of projects and we have the ability and willingness to engage in
such contracts; so we will attach to the present document our technical bid for your
evaluation.
B. Presentation ProMediu (R)
ProMediu (R) is the environmental division of PROSPECTIUNI SA, created by associating
the Analysis Laboratory / Geological Testing with the geological Department, consisting of a
team consolidated for sampling services, environmental sampling and analysis of soil, water
and air. The Analysis Laboratory / Geological Testing, approved by RENAR together with
field teams offer complete and dedicated specific services, acknowledged in Eastern Europe.
For this, we work with a highly qualified and experienced personnel, consisting of geologists
and chemists, as well as state of the art drilling technology and equipment, with the
ability to perform samplings in almost any terrain or geological location where they
are required.
C. Skills:
Field samplings for environmental monitoring and their analysis by qualified and
authorized personnel;
Drilling for environmental sampling, monitoring wells, geological and geotechnical
drilling;
Laboratory Analysis (geological, mineralogical, petrophysical, geochemical,
hydrogeological, technical constructions) "in situ" using mobile laboratory and the
Analysis Laboratory / Geological Testing LAG;
Risk and impact studies, environmental audit;
Recommendations and solutions.
D. Experience
ISPE
o a rehabilitation project for the Azomures area;
o a rehabilitation project for the Rosia Montana area.
o laboratory tests for the lake Bacau rehabilitation project
o sampling and laboratory tests - project of abandonment of development wells
OMV Petrom
Ramboll - Petrom project for the platform of bioreparation;
Artelia - environmental studies for fuel distribution stations
Deconta
o sampling for laboratory analysis performed by a third party
o drilling for sampling and laboratory analysis, project of closure of pits Petrom
o drilling for sampling, project Crangurile
o sampling of pits, Vega refinery project
o monitoring drillings, OMV Petrom Galati project and Ianca
Vivani- volume calculation for pits Suplacu de Barcău
Halcrow - Sampling and laboratory analysis - project of abandonment of development wells
OMV Petrom
IKEN Romania - laboratory analisys- project of abandonment of wells OMV Petrom
SC NICOLTANA SRL- water sampling and laboratory analysis - assessing water quality
SC Negresti Oas - water sampling and laboratory analysis - assessing water quality
Municipality Moinesti - therapeutic water sampling and laboratory analysis -
assessing water quality
SC SID CONS SRL - water sampling and laboratory analysis - assessing water quality
Arcelor Mittal Roman
o sampling for environmental monitoring
o monitoring in settlement of the dump Simionesti
o solutions study for soil decontamination
Agrana Romania
o monitoring environmental factors and sampling plan, calculating greenhouse
gas
o carbonation waste and sludge analysis
SIMCOR VAR - monitoring environmental factors and sampling plan, calculating
greenhouse gas
Wienerberger - monitoring environmental factors and sampling plan, calculating greenhouse
gas
CARMEUSE HOLDING - monitoring environmental factors and sampling plan, calculating
greenhouse gas
CELCO SA - monitoring environmental factors and sampling plan, calculating greenhouse
gas
Saint-Gobain Glass Romania - monitoring environmental factors and sampling plan,
calculating greenhouse gas
Brikston Iasi - monitoring environmental factors and sampling plan, calculating greenhouse
gas
CARS SA Tarnaveni - monitoring environmental factors and sampling plan, calculating
greenhouse gas
URANUS JUNIOR 2003 - monitoring environmental factors and sampling plan, calculating
greenhouse gas
Arcelor Mittal Galati- monitoring environmental factors and sampling plan, calculating
greenhouse gas
Uni Recycling - drilling water monitoring wells - rehabilitation project Crangurile Gaesti
Municipality of Giurgiu - study investigating soil contamination, chemical platform
Municipality of Suplacu de Barcău, Bihor - study investigating soil contamination, waste pit
Ironmet Ploiesti - Magnetic investigation in landfill
Vulcan SA - studies to identify possible contamination of the platform Berceni
Municipality Moinesti - sampling and laboratory analysis, monitoring of the therapeutic
water quality
Metamud Romania - Determinations of the exploitable volumes, limestone pit Vratsa
Bulgaria
E. Technical Equipment
drilling platform with GEOPEC rotary engine and drilling platform for uncontaminated
sampling for laboratory analysis and monitoring EA410;
pneumatic hammer for concrete surfaces and oversized blocks of rocks, all types of
equipment for operations "in situ"
Dump truck 4WD for access on any terrain, fully equipped, with first aid kit and
communication equipment;
Boxes and special containers for preserving the samples ;
AutoCAD® Map 3D and Civil 3D, Autodesk AutoCAD® Raster Design CAD / GIS and
Golden SOFTWARE Surfer® 8 for data processing, Oasis Montage and ArcGIS for
mathematical modeling;
GPS Navigator Garmin 60 GPS and software for precise positioning of boreholes;
Pumping equipment;
Monitor establishing PDR impurities from the atmosphere, MX21 gas detector, sound
integrator Solo SLM, Geiger Muller counter;
Laboratory equipment that covers all the types of analysis carried out by several methods
(gas chromatograph, XRF, ICP OES and MS, docimasia etc). All tests are conducted in
accordance with standards SR EN ISO / 17025: 2005.
PROSPECTIUNI SA is the sole owner of the equipment with solid contracts with prestigious
providers for software maintenance and updating, for equipment maintenance and repair, to
keep all resources in the best operating conditions. Work equipment used in the laboratory
covers all the types of analysis carried out by several methods; All tests are conducted in
accordance with standards SR EN ISO / 17025: 2005.
F. Services
Documentation for the rehabilitation through the valorification of the tailings from the dump
ROMPLUMB , Baia Mare
STAGE I
Calculation of volume to identify the volume of tailings
- Operations: making tomographic profiles to identify bottom of pit and bulky objects, to
determine the correct volume of tailings to be processed; sampling execution on different
levels of depth and laboratory analysis on these samples to determine the average percentage
of the content.
- Estimated Duration: 2 months (including field operations, drawing the map of the dump,
issuing analysis bulletins, making reserve calculations and preparing the final report);
- Project value: 58.700 RON (including field operations, 4 sets of laboratory analysis and
issue of final report).
STAGE II
Documentation for the rehabilitation through the valorification of the tailings
- Operations: Preparing documents for obtaining the approval, the letter of advice or
environmental authorization, as appropriate.
- The estimated duration: 4 months (including preparation of the risk assessment, feasibility
study and solutions and assistance for obtaining the approval, the letter of advice or
environmental authorization, as appropriate).
- Project value: 84.000 RON (including elaborating the documentation and travel support).
G. Certifications
ANMR Certificate number 1105 / 27.02.2013;
Certificate National Registry for Environment Evaluation position number 135 for
RIM / BM / RA / RS / RM;
Certificate IQNet no. IT90170 / 2013 cf ISO 9001: 2008;
Certificate SIMTEX RINA no. 29019/13 / RNA cf. EN ISO 9011: 2008;
Certificate IQNet no. IT90169 / 2013 according to ISO 14001: 2004;
SIMTEX RINA certificate no. EMS-4996 / RNA cf. ISO 14001: 2005;
Certificate IQNet no. IT90171 / 2013 cf. BS OHSAS 18001: 2007;
Certificate SIMTEX RINA no. Cf. OHS-1701 SR OHSAS 18001: 2008;
Certificate RENAR LI075 for laboratory tests and geological analysis;
No 454/2013 AL series AFER Authorization to perform specific tests and inspection of
railway products.
H. Contacts
Victor Caplescu,
Operations Director, [email protected],
Mobile: 004 0728 284 081;
I. Credentials
ARTELIA
With this letter we want to confirm our constant collaboration with the department ProMediu
of Prospectiuni SA in projects that we conduct. The services that we requested from them
entered the category:
- drilling
- Analysis of groundwater
- Soil analysis
- Assessing groundwater level
- Hydrogeological studies
ProMediu services provided were of good quality, executed on time and answered our
requests and the clients'. ProMediu work is appreciated by us and that's why we asked for bids
from ProMediu, convinced that together we can provide our customers with the quality
service standards desired. We also appreciated the attention paid by employees ProMediu
concerning environment protection and occupational safety on fieldwork.
ISPE
To whom it may concern,
With this letter we want to confirm our constant collaboration with the department ProMediu
of Prospectiuni SA in projects that we conduct. The services that we requested from them
entered the category:
- drilling
- Analysis of groundwater
- Soil analysis
- Assessing groundwater level
- Hydrogeological studies
ProMediu services provided were of good quality, executed on time and answered our
requests and the clients'. ProMediu work is appreciated by us and that's why we asked for bids
from ProMediu, convinced that together we can provide our customers with the quality
service standards desired. We also appreciated the attention paid by employees ProMediu
concerning environment protection and occupational safety on fieldwork.
SC Dekonta SRL
Credential
This letter confirms that the company ProMediu has carried out investigative activities on the
site PrioCombustibil SRL Lehliu Gara by executing 10 drillings (depth up to 2 meters), with
soil sampling, worth 3,000 lei.
As a result of good cooperation and the proper execution of the works we recommend
ProMediu SRL as a reliable partner, offering European standard services.
We thank ProMediu Company LLC for promptness and flexibility proved and not least for the
quality of works executed at predetermined terms and conditions.