This document provides an overview of PG&E's Rule 21 Generator Interconnection process. It discusses the options for pre-application reports, how to submit an interconnection request, the typical review process and timelines, implementation steps, inspection, and permission to operate. Helpful tips and resources are also included to guide applicants through the process.

Uploaded by

Se Samnang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
213 views7 pages

Rule 21 Generator Interconnection Basics PDF

This document provides an overview of PG&E's Rule 21 Generator Interconnection process. It discusses the options for pre-application reports, how to submit an interconnection request, the typical review process and timelines, implementation steps, inspection, and permission to operate. Helpful tips and resources are also included to guide applicants through the process.

Uploaded by

Se Samnang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Rule 21 Generator

Interconnection Basics

Martha Baeli & Britany Stickel

Electric Grid Interconnection (EGI)


Rule 21 and Complex NEM
Voluntary Pre-Application Report
Potential generator interconnection applicants may request information
about a proposed interconnection location through the Rule 21 Pre-
Application Report request process.

The following Pre-Application Report packages are available:

A. Standard Pre-Application Report:


• Readily available specific Distribution System data

B. Enhanced Pre-Application Report - Primary Service Package:


• Supplementary detailed Distribution System data

C. Enhanced Pre-Application Report - Behind the Meter (BTM) Package:


• Distribution System data relevant to a “Behind the Meter”
interconnection, includes Secondary or Primary service characteristics

Non-refundable fees for each package or combination of packages are provided in


Rule 21 Section E.1.
2
Submitting an Interconnection Request

1. Determine whether the project can be studied under the Fast Track or
Detailed Study Review Process.

2. Submit the Interconnection Request online at https://www.egi-


pge.com with the following documents:
– Single line diagram including:
• AC disconnect switch location, manufacturer and model type
• Existing and new generator equipment including quantity,
manufacturer and model type
– Site Plan
– Third Party Customer Authorization (as needed)

3
Overview of Interconnection Process
20-55 Business Days 15-95 Business Days 3-24 Months 10-45 Business Days 5 Business Days

Application Engineering Permission to


Review Review Implementation Inspection
Operate (PTO)
• Identify missing Identify: • Applicant to Performed after: • Issue within five
documentation construct (5) Business
• System Generating • Final electric Days after
• Invoice for upgrades Facility inspection project passes
applicable required for evidence inspection
Interconnection safety and • Collect funding submitted
Request fees or reliability for applicable
deposits system • Applicable
• Cost upgrades system upgrade
• Deem responsibility work completed
application • System
complete and Report results: upgrade design, • All applicable
valid procurement, tariff
• System data requirements
construction
• Assign queue • System and installation met
position upgrades
required • Process any
• Assign other applicable
Interconnection • Non-binding tariff
Manager cost estimate requirements
(e.g., Standby
• Approximate and Departing
construction Load)
timeline

4
Helpful Tips
To improve process flow:
• Become familiar with the basic Rule 21 study process timelines and
requirements
• Ensure that application service information is correct (Service
Agreement ID, meter number, etc.)
• Finalize generator equipment prior to applying for interconnection
• Ensure that all existing and new generator equipment is included on
the Interconnection Request
• Prior to submitting an Interconnection Request, please direct any
questions about the application review process to
[email protected]

5
Resources/Helpful Links

Electric Generation Interconnection (EGI) Website: www.pge.com/gen

Rule 21 Tariff: https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_RULES_21.pdf

Distribution Interconnection Handbook:


http://www.pge.com/en/mybusiness/services/nonpge/generateownpower/distributedg
eneration/interconnectionhandbook/index.page

Transmission Interconnection Handbook:


https://www.pge.com/en_US/business/services/alternatives-to-pge/electric-
services/electric-transmission-services/transmission-interconnection-handbooks.page

Rule 21 Online Application Portal: https://www.egi-pge.com

Rule 21 Program Inquiries: [email protected]

6
Questions?

You might also like