0% found this document useful (0 votes)
510 views9 pages

Tiles Rate Analysis

The document provides information on tile types, sizes, rates, and labor costs for various tile and flooring works. It includes details like tile sizes, rates per square meter and tile, wastage percentages, and labor costs per square foot for laying different flooring materials in Bhandup, Mumbai. Sample calculations are also provided for estimating costs of flooring, dado, skirting, and other works based on tile sizes, material quantities, and rates. The document acts as a reference for selecting appropriate tiles and estimating costs of flooring projects.

Uploaded by

Sudarshan Mane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
510 views9 pages

Tiles Rate Analysis

The document provides information on tile types, sizes, rates, and labor costs for various tile and flooring works. It includes details like tile sizes, rates per square meter and tile, wastage percentages, and labor costs per square foot for laying different flooring materials in Bhandup, Mumbai. Sample calculations are also provided for estimating costs of flooring, dado, skirting, and other works based on tile sizes, material quantities, and rates. The document acts as a reference for selecting appropriate tiles and estimating costs of flooring projects.

Uploaded by

Sudarshan Mane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

TILES

TYPE SIZE RATE/m2 RATE/TILE WASTAGE


L B
SOLUBLE SALT VITRIFIED 0.6 0.6 430 154.8 5.00%
VITRIFIED 0.6 0.6 430 154.8 5.00%
GLAZED CERAMIC 0.3 0.45 430 58.05 5.00%
Anti-Skid Ceramic
Anti-Skid Ceramic-wc/bath 0.3 0.45 215 29.025 5.00%
KOTA (PRE POLISHED) 0.55 0.55 484 146.41
GRANITE
JET BLACK GRANITE 1850
CHINA MOSAICCHIPS - 323
GST on tiles Is 18 %
Bubble sheet covering rate 44 RS/m2
LABOUR LABOUR Bhandup
TYPE Laying Cost/Sq.Ft TYPE Laying Cost/Sq.Ft
VITRIFIED 15 VITRIFIED 8
GRANITE 20 GRANITE 15
INDIAN MARBLE 20 INDIAN MARBLE/KOTA 15
ITALIAN MARBLE 25 ITALIAN MARBLE 15
DADO 18 DADO 12
SKIRTING 25 SKIRTING 6
KITCHEN COUNTER KITCHEN COUNTER
WOODEN FLOORING 30 WOODEN FLOORING 30
RFT
RATE ANALYSIS FLOORING

Work Area (m2) 1 Tile Size (m*m) 1 1

1
mortar Ratio
3

mortar thickness 35 WET DRY wastage TOTAL


(mm)

Mortar volume (m3) 0.035 0.0455 10.00% 0.05005

Description Wastage Quantity Rate Amount


Sr.No Material
1 Cement (Bags)+loading 0.36036 230 82.8828
sand siporez (bag)+loading 1.454578125 85 123.6391406
Tiles (no)+ loading 5.00% 1.05 1500 1575
Bubble sheet Covering (m2) 1 0
2 Labour Tiling(15RS/Sq. Ft) 193.752
3 Grouting
Total 1975.273941
Water and Electricity 0.00% 0
(%)3

Contignencies (%)3 3.00% 59.25821822

Over Head (%)5 0.00% 0


PNM (%)3 0.00% 0
Contractor's Profit 0.00% 0
(%)15
Total Cost in (m2) 2034.532159
Total Cost in (Sq.ft) 189.0126495
RATE ANALYSIS DADO

Work Area (m2) 1 Tile Size (m*m) 1 1

1
mortar Ratio
3

mortar thickness 12 WET DRY wastage TOTAL


(mm)

Mortar volume (m3) 0.012 0.0156 10.00% 0.01716

Description Wastage Quantity Rate Amount


Sr.No Material
1 Cement (Bags)+loading 0.123552 230 28.41696
sand siporez (bag)+loading 0.4987125 88 43.8867
Tiles (no)+ loading 5.00% 1.05 430 451.5
Bubble sheet Covering (m2) 1 0 0
2 Labour Dado(18RS/Sq. Ft) 150.696
3 Grouting
Total 674.49966
Water and Electricity 0.00% 0
(%)
Contignencies (%) 3.00% 20.2349898
Over Head (%) 0.00% 0
PNM (%) 0.00% 0
Contractor's Profit 0.00% 0
(%)
Total Cost in (m2) 694.7346498
Total Cost in (Sq.ft) 64.5424238
RATE ANALYSIS SKIRTING
Work Area (m2) 0.075 Tile Size (B*H) 1 1
1 Skirting Height 0.075
mortar Ratio Length Covered in 13.33333333 Work
4 1 tile (m) RMT

mortar thickness 12 WET DRY wastage


(mm)

Mortar volume (m3) 0.0009 0.00117 10.00%

Description Wastage Quantity Rate


Sr.No Material
1 Cement (Bags)+loading 0.00741312 230
sand siporez (bag)+loading 0.039897 88
Tiles (no)+ loading 5.00% 0.07875 430
Bubble sheet Covering (m2) 0.075 0
2 Labour Skirting(6RS/RFt)
3 Grouting
Total
Water and Electricity 0.00%
(%)
Contignencies (%) 3.00%
Over Head (%) 0.00%
PNM (%) 0.00%
Contractor's Profit 0.00%
(%)
Total Cost in (RMT)
Total Cost in (RFT)
1

TOTAL

0.001287

Amount

1.7050176
3.510936
33.8625
0
19.686

58.7644536

1.762933608
0
0

60.52738721
18.44784737
RATE ANALYSIS FLOORING
Work Area (m2) 1 Tile Size (m*m) 0.6 0.6
1
mortar Ratio
6

mortar thickness (mm) 30 WET DRY wastage


Mortar volume (m3) 0.03 0.039 10.00%

Description Wastage Quantity Rate


Sr.No Material
1 Cement (Bags)+loading 0.176502857 230
sand siporez (bag)+loading 1.424892857 88
Tiles (no)+ loading 5.00% 2.916666667 155
Bubble sheet Covering (m2) 1 0
2 Labour Tiling(25RS/Sq. Ft)

Total
Water and Electricity (%) 4.00%
Contignencies (%) 5.00%
Over Head (%) 5.00%
PNM (%) 4.00%
Contractor's Profit (%) 20.00%
Total Cost in (m2)
Total Cost in (Sq.ft)
TOTAL
0.0429

Amount

40.59565714
125.3905714
452.0833333
0
269

887.0695619
35.48278248
44.3534781
44.3534781
35.48278248
177.4139124
1224.155995
113.7691446