PM and PP Tool
PM and PP Tool
Purpose:
This tool assists in organizing and monitoring project work. By using the task planning section, project milestones and tasks can accurately be planned out. Once the project begins,
real-time progress is tracked and the project is monitored against the set baselines.
Instructions:
This tool can be used for managing a project, starting with the planning stages right through to monitoring project progress. Refer to the boxes below to view each sections'
instructions, and understand how each step is useful for managing projects.
Getting Started:
In chronological order, use the boxes below to navigate through the tool as the project progresses. Click the blue buttons to go directly to the section of choice, or use the worksheet
tabs along the bottom of the spreadsheet screen. Some of the column headings in the sections include comments that offer additional instructions. Hover the mouse over the column
headings to view these instructions.
This section requires some basic data entry to get the project started. Use this important section to plan out the project. Tasks should be
Information regarding project start and end dates, project team members entered, along with deadlines and task owners. Once hashed out and
and stakeholders, and non-work days is required. completed, copy and paste this plan into Tab 3 to begin monitoring
project progress.
Copy and paste the project plan from Tab 2 into the first four columns of If issues arise, use this area to log and ensure that problems are resolved.
this Gantt chart. By entering the actual start and end dates for tasks, this
chart allows you to view which tasks are on schedule, behind schedule or
ahead of schedule.
Use this section to generate a custom progress report. Specify the time
period that you would like to view and tasks during this time, ordered by
task owner, will appear. This report is ideal for weekly meeting updates,
or stakeholder progress reporting.
Go to Task Report
Basic Data Entry Return to the Introduction
Fill in all of the white cells with the necessary information. To view additional instructions, hover your mouse over the table column headings.
3. Team Members
Sudip Dutta
Mohd. Anwar Ali
Ismail
Planning Return to the Introduction
Use this section to work out the project plan. Feel free to add and delete rows as necessary, or move tasks around until the optimal project plan has been drafted. Once satisfied with the project plan, copy this information and paste it into the corresponding table in Tab 3. No changes can be made to the project plan within
Tab 3, so ensure that if any changes are needed, the adjustments are made in this tab before re-copying and re-pasting the data into Tab 3.
Task Owner
Estimated Completion
Pillar Activity Project Task Dependency Estimated Start Date Estimated Days (MUST USE DROP DOWN
Date
MENU)
Documentation of As-Is Documentation. Planning for detailed discussion 14-Aug-17 14-Aug-17 1 Vishal Singh
Discipline & Proactive Resolve Current State Assessment
Discipline & Proactive Resolve Current State Assessment Detailed discussion on Store operations and training 16-Aug-17 16-Aug-17 1 Vishal Singh
Discipline & Proactive Resolve Current State Assessment Detailed discussion on Store infrastructure 17-Aug-17 17-Aug-17 1 Vishal Singh
Discipline & Proactive Resolve Current State Assessment Review and Validation of As-Is Process 18-Aug-17 18-Aug-17 1 Vishal Singh
Reconciliation Gap Analysis & To be Hypothesis Data Analysis - Based on Data provided, Existing KPI's 21-Aug-17 29-Aug-17 6 Vishal Singh
Reconciliation Gap Analysis & To be Hypothesis Identify Key Issues, Perform RCA 21-Aug-17 29-Aug-17 6 Vishal Singh
Discipline & Proactive Resolve Gap Analysis & To be Hypothesis Identify training needs & Proactive measures 21-Aug-17 29-Aug-17 6 Vishal Singh
New Channel Feasibility Study Define the execution process for Training and Proactive issue resolve 21-Aug-17 29-Aug-17 6 Vishal Singh
Identify technology improvement - Application, Integration, Infra for store
21-Aug-17 29-Aug-17 6 Vishal Singh
New Channel Feasibility Study issues
Discipline & Proactive Resolve To Be Solution To be Process State 30-Aug-17 8-Sep-17 8 Vishal Singh
Discipline & Proactive Resolve To Be Solution Define KM Process 30-Aug-17 8-Sep-17 8 Vishal Singh
Reconciliation To Be Solution SLA / KPI and Benchmark Process 30-Aug-17 8-Sep-17 8 Vishal Singh
Discipline & Proactive Resolve To Be Solution Governance Model 30-Aug-17 8-Sep-17 8 Vishal Singh
Key Recommendations- People, Process and Technology including
30-Aug-17 8-Sep-17 8 Vishal Singh
New Channel To Be Solution SLA /KPI parameters
Infrastructure To Be Solution Define To- Be Tech landscape 30-Aug-17 8-Sep-17 8 Vishal Singh
Discipline & Proactive Resolve To be Solution - Review and Validation 30-Aug-17 8-Sep-17 8 Vishal Singh
Work Schedule Monitoring Return to the Introduction
Project Task Information Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26
Estimated Actual 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan
Estimated Estimated Actual Start
Pillar Project Task Completion Team Members Completion Actual Days Hardcastle Resources 7 8 9 10 11 14 15 16 17 18 21 22 23 24 25 28 29 30 31 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 2 3 4 5 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31 1 2
Start Date Days Date
Date Date M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F
H H
H H
Infrastructure Finance Team to understand detail reco process 10-Aug-17 16-Aug-17 4 Finance , Reco , 0 Finance , Reco , x x x H x H
Discipline & Proactive Resolve CG team Documentation of AS is process & Gap analysis 23-Aug-17 25-Aug-17 2 CG team 0 CG team H x x H
Discipline & Proactive Resolve Review of proposed solutions & GAP 28-Aug-17 29-Aug-17 2 MCD core Team 0 MCD core Team H H x x
Discipline & Proactive Resolve Revise the To be solutions based on business inputs 30-Aug-17 30-Aug-17 1 CG team 0 CG team H H x
Reconciliation Review of the to be with business 1-Sep-17 1-Sep-17 1 MCD core Team 0 MCD core Team H H x
Discipline & Proactive Resolve TO BE process documentation for IT Landscape 7-Sep-17 8-Sep-17 2 Anwar , Somesh 0 Anwar , Somesh H H x x
New Channel TO BE process documentation for New Channel 8-Sep-17 15-Sep-17 6 Sudip,Somesh 0 Sudip,Somesh H H x x x x x x
New Channel Review of Reco 7-Sep-17 7-Sep-17 1 MCD core Team 0 MCD core Team H H x
Discipline & Proactive Resolve Review of IT 9-Sep-17 9-Sep-17 0 MCD core Team 0 MCD core Team H H
Discipline & Proactive Resolve Review of New Channel 18-Sep-17 18-Sep-17 1 MCD core Team 0 MCD core Team H H x
Infrastructure Review 21-Sep-17 21-Sep-17 1 MCD core Team 0 MCD core Team H H x
Enterprise Core
Solutions, Customer
Facing Technology,
Review and Validation of As-Is Process 18-Aug-17 18-Aug-17 1 0 H x H
Infrastructure
Discipline & Proactive Resolve Identify training needs & Proactive measures 21-Aug-17 29-Aug-17 6 0 HR H x x x x H x x
00 30-Dec-99 30-Dec-99 0 0 H H
00 30-Dec-99 30-Dec-99 0 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
00 30-Dec-99 30-Dec-99 0 H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
ISSUE MANAGEMENT LOG Return to the Introduction
Project Description:
Project Description:
EXAMPLE: Add staff to fill the skills gap. Procedural 01/01/06 EXAMPLE: Staff was added to the project to fill the skills gap.
EXAMPLE: Additional negotiation System 01/01/06 EXAMPLE: Negotiations ended satisfactorily before they caused
project delays.
To create a customized progress report, insert the desired timeframe for analysis in the start and end date boxes below. For a progress report of the entire project, insert the project's start and end dates. Consider
running reports based on tasks for today, this week, or next week.
IMPORTANT NOTICE:
Task owner names must be selected from the drop down menus in Tabs 2 and 3 in order for this reporting page to work correctly. If errors occur on this page, return to the project planning stage and ensure that
task owner names were selected from the menus, rather than typed in manually.
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 9
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 10
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 11
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 12
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 13
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 14
Enter Date to Start Progress Report Monday, August 07, 2017 Enter Date to End Progress Report Saturday, September 30, 2017
Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management
Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date
Page 15