Driving Set Calculation for Piles

This document summarizes the determination of the driving set for a 200 mm by 200 mm square reinforced concrete pile using the Kreuger formula, which is a modification of the Hiley formula. Based on parameters like the hammer weight of 3 tonnes, drop height of 400 mm, pile length of 12 m, working load of 43 tonnes, and an efficiency of 0.85, the calculated set was 33.9 mm per 10 blows. The recommended driving set is 25 mm or 1 inch per 10 blows.

Uploaded by

Nordin Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
270 views1 page

Driving Set Calculation for Piles

This document summarizes the determination of the driving set for a 200 mm by 200 mm square reinforced concrete pile using the Kreuger formula, which is a modification of the Hiley formula. Based on parameters like the hammer weight of 3 tonnes, drop height of 400 mm, pile length of 12 m, working load of 43 tonnes, and an efficiency of 0.85, the calculated set was 33.9 mm per 10 blows. The recommended driving set is 25 mm or 1 inch per 10 blows.

Uploaded by

Nordin Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DETERMINATION OF DRIVING SET FOR 200 MM X 200 MM SQ. R. C.

PILE
BY DYNAMIC ANALYSIS

PROJECT : CONSTRUCTION OF 'PENCAWANG PEMBAHAGIAN UTAMA' (PPU) SUB-STATION AT KLIA


SEPANG

FORMULA USED : KREUGER FORMULA


(MODIFICATION OF HILEY FORMULA)

F-S. X R = E W H X W + P/4
S + C/2 W+P

1. - Type of hammer used : Hydraulic hammer

2. - Weight of hammer, W 3 Tonnes -

3. - Drop of hammer, H 400 mm

4. - Length of pile , L ; 12 m

5. - Weight of pile , P 0.096 t/m x 12 m 1.2 Tonnes

6. - Working load of pile , R 43 Tonnes

7. - Safety factors , F.S. 2

8. - Assuming temporary compression , C: 12

9. - Final set blow , S

10.- Efficiency of hammer, E 0.85

COMPUTATION :•
EWH
F.S. x R = 11.860

W+P/4
W+P = 0.792

To find S : S+C/2 = EWH x W+P/4


F.S. x R W+P

S SB 9.39 . - 6
= 3.39 mm Per blow
< = 33.9 mm Per 10 blow

* Recommended driving set is 25_ mm per 10 blows,


or one inch per 10 blows.

Note: The set calculation is only a guide and should be ascertained on site by load testing the pile.