DETERMINATION OF DRIVING SET FOR 200 MM X 200 MM SQ. R. C.
PILE
BY DYNAMIC ANALYSIS
PROJECT : CONSTRUCTION OF 'PENCAWANG PEMBAHAGIAN UTAMA' (PPU) SUB-STATION AT KLIA
SEPANG
FORMULA USED : KREUGER FORMULA
(MODIFICATION OF HILEY FORMULA)
F-S. X R = E W H X W + P/4
S + C/2 W+P
1. - Type of hammer used : Hydraulic hammer
2. - Weight of hammer, W 3 Tonnes -
3. - Drop of hammer, H 400 mm
4. - Length of pile , L ; 12 m
5. - Weight of pile , P 0.096 t/m x 12 m 1.2 Tonnes
6. - Working load of pile , R 43 Tonnes
7. - Safety factors , F.S. 2
8. - Assuming temporary compression , C: 12
9. - Final set blow , S
10.- Efficiency of hammer, E 0.85
COMPUTATION :•
EWH
F.S. x R = 11.860
W+P/4
W+P = 0.792
To find S : S+C/2 = EWH x W+P/4
F.S. x R W+P
S SB 9.39 . - 6
= 3.39 mm Per blow
< = 33.9 mm Per 10 blow
* Recommended driving set is 25_ mm per 10 blows,
or one inch per 10 blows.
Note: The set calculation is only a guide and should be ascertained on site by load testing the pile.