Acceptance Request Notification: Avida Towers Riala Tower 2 056 MDC 1 Residential Floor

This document is an acceptance request notification from contractor MDC for inspection and acceptance of units in the Avida Towers Riala Tower 2 project. It requests inspection of the 1st residential floor from August 28 to September 2, 2017. It lists the proposed inspection dates in a calendar format and notes that pre-verification of units' readiness has been done. Key parties who would be involved in the inspection process are identified. Space is also provided to record inspection results and remarks.

Uploaded by

hje421
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views1 page

Acceptance Request Notification: Avida Towers Riala Tower 2 056 MDC 1 Residential Floor

This document is an acceptance request notification from contractor MDC for inspection and acceptance of units in the Avida Towers Riala Tower 2 project. It requests inspection of the 1st residential floor from August 28 to September 2, 2017. It lists the proposed inspection dates in a calendar format and notes that pre-verification of units' readiness has been done. Key parties who would be involved in the inspection process are identified. Space is also provided to record inspection results and remarks.

Uploaded by

hje421
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Acceptance Request Notification

Project: Avida Towers Riala Tower 2 ARN No: 056


Inspection Date :
Contractor: MDC 8.28-9.2.17
(Mon-Sat)
st
Location (Res. Floor): 1 residential floor Request Date: 8.29.17

Pre-Verification – Unit’s readiness verified by MDC QA / Contractor QA/QC

MONTH MON TUE WED THU FRI SAT

Aug 2017 28 29 30 31 Sep. 1 2

II
(Initial Ins.)

CCO
(conditional)
1,2,3,4,5,6,7,8,9,
FCO 10,11,12,14,15,
(Final/Accepta 16,17,18, 19, 20,
nce) 21,22,23,24

Requested By: Hanna J. Espinosa Position: QA Signature:

Audit Report - Remarks by Avida Quality Monitoring Unit


Residential
Unit Number Inspection Date Remarks
Floor
Not Ready
during Audit
(II/CCO/FCO)

II

CCO

FCO

QM: Date: Signature:

Noted By:

Name & Signature / Date: ____________________________ ____________________________


MDC COG MDC QA

Form Code: GEN-GEN-QMU-QMF-00001-3 Date: 6-17-2017