Acceptance Request Notification
Project: Avida Towers Riala Tower 2 ARN No: 056
Inspection Date :
Contractor: MDC 8.28-9.2.17
(Mon-Sat)
st
Location (Res. Floor): 1 residential floor Request Date: 8.29.17
Pre-Verification – Unit’s readiness verified by MDC QA / Contractor QA/QC
MONTH MON TUE WED THU FRI SAT
Aug 2017 28 29 30 31 Sep. 1 2
II
(Initial Ins.)
CCO
(conditional)
1,2,3,4,5,6,7,8,9,
FCO 10,11,12,14,15,
(Final/Accepta 16,17,18, 19, 20,
nce) 21,22,23,24
Requested By: Hanna J. Espinosa Position: QA Signature:
Audit Report - Remarks by Avida Quality Monitoring Unit
Residential
Unit Number Inspection Date Remarks
Floor
Not Ready
during Audit
(II/CCO/FCO)
II
CCO
FCO
QM: Date: Signature:
Noted By:
Name & Signature / Date: ____________________________ ____________________________
MDC COG MDC QA
Form Code: GEN-GEN-QMU-QMF-00001-3 Date: 6-17-2017