Dynamic Analysis of Cyclohexane Production With Aspen HYSYS V8.0
Dynamic Analysis of Cyclohexane Production With Aspen HYSYS V8.0
Conversion reactor
– 1080 ft3
– Hydrogen feed 310 lbmole/hr
– Benzene feed 100 lbmole/hr
Dynamic sequence
– Run simulation for 1 hour
– Ramp hydrogen feed from 310 lbmole/hr to 300 lbmole/hr over 1 hour
– Run simulation for 1 hour
– Over 1 hour, ramp hydrogen feed up to 320 lbmole/hr
– Run simulation for 1 additional hour