I. Preliminary Investigation: Grand Total NO. Personnel Involved Rate/Day No. of Days Worked Total TEV

This document provides details on the Bualan CIP project located in Tubod, Lanao del Norte, Philippines. It includes the programmed area of 50 hectares and canal length of 10km. It outlines the labor, equipment, and supply costs for the preliminary investigation and data gathering phases of the project, which include a hydrology and meteorology study. The total preliminary investigation costs are estimated at 18,868.75 PHP and the total hydrology and meteorology costs are estimated at 19,444.66 PHP. An agro-economist survey is also outlined with labor costs estimated at 5,438.16 PHP.

Uploaded by

Jescel Araracap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views6 pages

I. Preliminary Investigation: Grand Total NO. Personnel Involved Rate/Day No. of Days Worked Total TEV

This document provides details on the Bualan CIP project located in Tubod, Lanao del Norte, Philippines. It includes the programmed area of 50 hectares and canal length of 10km. It outlines the labor, equipment, and supply costs for the preliminary investigation and data gathering phases of the project, which include a hydrology and meteorology study. The total preliminary investigation costs are estimated at 18,868.75 PHP and the total hydrology and meteorology costs are estimated at 19,444.66 PHP. An agro-economist survey is also outlined with labor costs estimated at 5,438.16 PHP.

Uploaded by

Jescel Araracap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT NAME : BUALAN CIP

LOCATION : TUBOD, LANAO DEL NORTE


PROGRAMMED AREA(NEW) : 50.00 has.
LENGTH OF CANAL : 10.00 km.
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.
AVE SPEED OF VEHICLE(PICKUP) : 50.00 kph
AVE SPEED OF VEHICLE(MOTORCYCLE) : 40.00 kph

Data:
A. Type of Vehicle to be used Rental Rate Fuel Consumption Oil Consumption
Mitsubishi Pick-up 21.00 /km 10.00 km/liter 70.00 km/liter
Motorcycle 0.52 /km 40.00 km/liter 200.00 km/liter

B. Fuel Price Per Liter DIESEL 45.45 /liter GASOLINE 55.10 /liter
C. Oil Price Per Liter 150.00 /liter

I. PRELIMINARY INVESTIGATION
1.) PROJECT IDENTIFICATION & INVESTIGATION REPORT
A.) LABOR
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Senior Engineer A 1,746.31 1.00 1,746.31 200.00 1,946.31


1 Soil Techonologist 974.36 1.00 974.36 200.00 1,174.36
1 Hydrologist 1,047.45 1.00 1,047.45 200.00 1,247.45
1 Driver(For Mobilization) 963.69 1.00 963.69 200.00 1,163.69
5 Utility Worker/Laborers 409.09 1.00 2,045.45 - 2,045.45
TOTAL 6,777.26 800.00 7,577.26

B.) Equipment Utilization


EQUIPMENT USED : Mitsubishi (Pick-Up)
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.

a) Rental Cost = 21.00 /km x 350.00 km. = 7350.00


b) Fuel Cost = 45.45 /liter x 350.00 km. = 1590.75
10.00 km/liter
c) Oil Cost = 150.00 /liter x 350.00 km. = 750.00
70.00 km/liter
d) Spare Parts Cost = 30% of Fuel and Oil
1590.75 (0.3) + 750.00 (0.3) = 702.23
10,392.98 php

C.) Office Supplies


5.00% of:
a) 7,577.26
b) 10,392.98
17,970.24 x 0.05 = 898.51 php

SUMMARY:
a.) Location Survey -------- 7,577.26
b.) Equipment Utilization -------- 10,392.98
c.) Office Supplies -------- 898.51
TOTAL FOR PRELIMINARY INVESTIGATION -------- ₱ 18,868.75

II. DATA GATHERING


2.1.) HYDROLOGY & METEOROLOGY (DISCHARGE INVESTIGATION)
A.) LABOR
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Hydrologist 1,047.45 12.00 12,569.40 - 12,569.40


1 Utility Worker 409.09 12.00 4,909.08 - 4,909.08
TOTAL 17,478.48 - 17,478.48

Discharge measurement should atleast be done once a month


Total number of days for TWELVE MONTHS observation say 12.00 days
B.) Equipment Utilization
EQUIPMENT USED : Motorcycle
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.

a) Rental Cost = 0.52 /km x 350.00 km. = 182.00


b) Fuel Cost = 45.45 /liter x 350.00 km. = 397.69
40.00 km/liter
c) Oil Cost = 150.00 /liter x 350.00 km. = 262.50
200.00 km/liter
d) Spare Parts Cost = 30% of Fuel and Oil
397.69 (0.3) + 262.50 (0.3) = 198.06
1,040.24 php

C.) Office Supplies


5.00% of:
a) 17,478.48
b) 1,040.24
18,518.72 x 0.05 = 925.94 php

SUMMARY:
a.) Labor -------- 17,478.48
b.) Equipment Utilization -------- 1,040.24
c.) Office Supplies -------- 925.94
TOTAL FOR HYDROLOGY & METEOROLOGY -------- ₱ 19,444.66

2.2.) AGRO-ECONOMIST SURVEY


A.) LABOR
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

2 Enumerators 906.36 3.00 5,438.16 - 5,438.16


TOTAL 5,438.16 - 5,438.16
Average Output = 7.00 respondents/day No. of respondents to be interviewed = 15.00 respondents
No. of days to complete the activity alone
d= No. of respondents to be interviewed = = 15.00 respondents
Average Output 7.00 respondents/day
= 2.14 days
Travel Time (Moving In/Out)
= DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) = 350.00 km. x 1 day
AVE SPEED OF VEHICLE(PICKUP) 50.00 kph 8 hours

= 350 = 0.88 0.88 days


400 = 3.02 days
say 3.00 days

B.) Equipment Utilization


EQUIPMENT USED : Motorcycle
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.

a) Rental Cost = 0.52 /km x 350.00 km. = 182.00


b) Fuel Cost = 45.45 /liter x 350.00 km. = 397.69
40.00 km/liter
c) Oil Cost = 150.00 /liter x 350.00 km. = 262.50
200.00 km/liter
d) Spare Parts Cost = 30% of Fuel and Oil
397.69 (0.3) + 262.50 (0.3) = 198.06
1,040.24 php

C.) Office Supplies


5.00% of:
a) 5,438.16
b) 1,040.24
6,478.40 x 0.05 = 323.92 php
SUMMARY:
a.) Labor -------- 5,438.16
b.) Equipment Utilization -------- 1,040.24
c.) Office Supplies -------- 323.92
TOTAL FOR AGRO-ECONOMIST SURVEY -------- ₱ 6,802.32

2.3.) SOIL CLASSIFICATION & LAND SURVEY


A.) LABOR
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Soil Technologist 974.36 4.00 3897.44 - 3,897


1 Enumerator 906.36 4.00 3,625.44 - 3,625.44
TOTAL 7,522.88 - 7,522.88
Average Output = 7.00 respondents/day No. of respondents to be interviewed = 15.00 respondents
No. of days to complete the activity alone
d= No. of respondents to be interviewed = = 15.00 respondents
Average Output 7.00 respondents/day
= 2.14 days
Travel Time (Moving In/Out)
= DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) = 350.00 km. x 1 day
AVE SPEED OF VEHICLE(PICKUP) 40.00 kph 8 hours

= 350 = 1.09 1.09 days


320 = 3.24 days
say 4.00 days

B.) Equipment Utilization


EQUIPMENT USED : Motorcycle
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.

a) Rental Cost = 0.52 /km x 350.00 km. = 182.00


b) Fuel Cost = 45.45 /liter x 350.00 km. = 397.69
40.00 km/liter
c) Oil Cost = 150.00 /liter x 350.00 km. = 262.50
200.00 km/liter
d) Spare Parts Cost = 30% of Fuel and Oil
397.69 (0.3) + 262.50 (0.3) = 198.06
1,040.24 php

C.) Office Supplies


5.00% of:
a) 7,522.88
b) 1,040.24
8,563.12 x 0.05 = 428.16 php

SUMMARY:
a.) Labor -------- 7,522.88
b.) Equipment Utilization -------- 1,040.24
c.) Office Supplies -------- 428.16
TOTAL FOR DAMSITE LOCATION -------- ₱ 8,991.28

III. Feasibility Study Report Preparation


A.) Profile Writing
3.1. ENUMERATOR
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Profile Writer 906.36 2.00 1,812.72 - 1,812.72


TOTAL 1,812.72 - 1,812.72
No. of days to complete the activity alone = 2.00 days
say 2.00 days
3.2. PREPARATION OF PROFILE WRITE-UP
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Profile Writer 906.36 5.00 4,531.80 - 4,531.80


TOTAL 4,531.80 - 4,531.80
No. of days to complete the activity alone = 5.00 days
say 5.00 days

3.3 Equipment Utilization


EQUIPMENT USED : Motorcycle
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.

a) Rental Cost = 0.52 /km x 350.00 km.


b) Fuel Cost = 45.45 /liter x 350.00 km. = 182.00
40.00 km/liter = 397.69
c) Oil Cost = 150.00 /liter x 350.00 km.
200.00 km/liter = 262.50
d) Spare Parts Cost = 30% of Fuel and Oil
397.6875 (0.3) + 262.5 (0.3)
= 198.06
1,040.24 php

3.4 Office Supplies


5.00% of:
a) 1,812.72
b) 4,531.80
c) 1,040.24
7,384.76 x 0.05 = 369.24 php

SUMMARY:
a.) Enumerators -------- 1,812.72
b.) Preparation of Profile Write-up -------- 4,531.80
c.) Equipment Utilization -------- 1,040.24
d.) Office Supplies -------- 369.24
TOTAL FOR PROFILE WRITING -------- ₱ 7,754.00

B.) Feasibility Study Report (FSR) Preparation


3.1. LABOR
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Agricutural Economist 974.36 5.00 4,871.80 - 4,871.80


TOTAL 4,871.80 - 4,871.80
No. of days to complete the activity alone = 5.00 days
say 5.00 days

3.2 Office Supplies


5.00% of:
a) 4,871.80
4,871.80 x 0.05 = 243.59 php

SUMMARY:
a.) Labor -------- 4,871.80
b.) Office Supplies -------- 243.59
TOTAL FOR PROFILE WRITING -------- ₱ 5,115.39

IV. TOPOGRAPHIC SURVEY


4.1 HORIZONTAL & VERTICAL CONTROL ESTABLISHMENT
Length of Primary Control, P = 5 km.

Length of Secondary control = LCP/2 = 2.5 km.


Average rate of one team = 15.00 km/day
No. of days to complete the activity alone
d= 7.50 = 7.50 km.
Average rate of one team 15.00 km/day
= 0.50 days
Travel Time (Moving In/Out)
DIST. FROM PIO TO PROJ.
=
SITE(ROUNDTRIP) = 350.00 km. x 1 day
AVE SPEED OF VEHICLE(PICKUP) 50.00 kph 8 hours

= 350 = 0.88 0.88 days


400 = 1.38 days
Total no. of days worked = 1.40 days
say 2.00 days

A. LABOR
NOTE: Actual personnel assign Engineer A.
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Eng'g Asst. A 1,166.85 2 2,333.70 200.00 2,533.70


1 Eng'g Asst. B 1,026.58 2 2,053.16 - 2,053.16
2 Chainman/UW 409.09 2 1,636.36 - 1,636.36
4 Rodman/UW 409.09 2 3,272.72 - 3,272.72
1 Driver 963.69 2 1,927.38 200.00 2,127.38
TOTAL 11,223.32 400.00 11,623.32

4.2 TOPOGRAPHIC SURVEY (POTENTIAL AREA)


Average output of the team = 30.00 ha/day
No. of days to complete the activity = 1.67 days
say 2.00 days

A. LABOR
NOTE: Actual personnel assign Engineer A.
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Eng'g Asst. A 1,166.85 2 2,333.70 400.00 2,733.70


1 Eng'g Asst. B 1,026.58 2 2,053.16 400.00 2,453.16
2 Chainman/UW 409.09 2 1,636.36 - 1,636.36
4 Rodman/UW 409.09 2 1,636.36 - 1,636.36
1 Driver 963.69 2 963.69 400.00 1,363.69
TOTAL 8,623.27 1,200.00 9,823.27

4.3 COMPUTATION & PLOTTING


Output of two person = 35.00 ha/day
No. of days to complete the activity = 1.43 days
say 2.00 days

1. LABOR
NOTE: Actual personnel assign Engineer A.
NO. OF DAYS
NO. PERSONNEL INVOLVED RATE/DAY TOTAL TEV GRAND TOTAL
WORKED

1 Eng'g Asst. A 1,166.85 2 2,333.70 - 2,333.70


1 Draftsman 678.68 2 1,357.36 - 1,357.36
TOTAL 3,691.06 - 3,691.06

2. Equipment Utilization
EQUIPMENT USED : Mitsubishi (Pick-Up)
DIST. FROM PIO TO PROJ. SITE(ROUNDTRIP) : 350.00 km.

a) Rental Cost = 21.00 /km x 350.00 km.


b) Fuel Cost = 45.45 /liter x 350.00 km. = 7350
10.00 km/liter = 1590.75
c) Oil Cost = 150.00 /liter x 350.00 km.
70.00 km/liter = 750
d) Spare Parts Cost = 30% of Fuel and Oil
1590.75 (0.3) + 750 (0.3)
= 702.225
10,392.98 php

3. OFFICE SUPPLIES & MATERIALS


a.) Fabrication of Monuments
7pcs of 15cm x 60cm long
Materials:
Cement = 1 bag x ₽ 230/bag = 230
Sand & Gravel = 0.01 x ₽ 5000/ cu.m. = 50
Cost of Materials = ₽ 280
b.) Labor Cost (Half-Day Activity)
2 - Utility Worker = 818.18
Cost of one monument = 150.45
Monument to be used = 20.00
Total Cost of Monument = ₽ 3009.00

c.) 5% of:
a) 11,623.32
b) 9,823.27
c) 3,691.06
d) 10,392.98
e) 3,289.00
38,819.63 x 0.05 = 1940.98

SUMMARY:
a.) Horizontal & Vertical Control Establishment -------- 11,623.32
b.) Office Supplies -------- 5,229.98
TOTAL FOR DESIGN & PLANNING -------- ₱ 16,853.30