0% found this document useful (0 votes)
132 views1 page

Zamil Chiller Alarm Codes Overview

This document outlines the HVAC requirements for a project, including the project name and location, consultant details, owner name, building type, and a description of the mechanical systems and energy conservation measures. It also includes an air-cooled chiller schedule that specifies the model number, entering and leaving temperatures for air and chilled water, equipment capacity, power input, and minimum efficiency requirements according to Regulation section 13 Table 13.3 and test standards.

Uploaded by

fares djenane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views1 page

Zamil Chiller Alarm Codes Overview

This document outlines the HVAC requirements for a project, including the project name and location, consultant details, owner name, building type, and a description of the mechanical systems and energy conservation measures. It also includes an air-cooled chiller schedule that specifies the model number, entering and leaving temperatures for air and chilled water, equipment capacity, power input, and minimum efficiency requirements according to Regulation section 13 Table 13.3 and test standards.

Uploaded by

fares djenane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

H V A C REQUIREMENTS

PROJECT NAME

LOCATION/AREA
PIN NUMBER

CONSULTANT NAME

CONSULTANT DETAILS

OWNER NAME :

BUILDING TYPE A. RESIDENTIAL o B.COMMERCIAL o C.INDUSTRIAL o

PROJECT DESCRIPTION :
Brief description about
mechanical system type
,features and Energy
Conservation measures.

EQUIPMENT SCHEDULE

AIR COOLED CHILLER SCHEDULE.


Minimum efficiency (KM
Condenser
Entering Leaving Rated Regulation section 13
Entering Air Power Input
Ref No Model Number Chilled water Chilled water Equipment COP IPLV Table 13.3) Test Standard
temperature (kW)
temperature °C temperature °C Capacity (ton)
°C COP IPLV

You might also like