H V A C REQUIREMENTS
PROJECT NAME
LOCATION/AREA
PIN NUMBER
CONSULTANT NAME
CONSULTANT DETAILS
OWNER NAME :
BUILDING TYPE A. RESIDENTIAL o B.COMMERCIAL o C.INDUSTRIAL o
PROJECT DESCRIPTION :
Brief description about
mechanical system type
,features and Energy
Conservation measures.
EQUIPMENT SCHEDULE
AIR COOLED CHILLER SCHEDULE.
Minimum efficiency (KM
Condenser
Entering Leaving Rated Regulation section 13
Entering Air Power Input
Ref No Model Number Chilled water Chilled water Equipment COP IPLV Table 13.3) Test Standard
temperature (kW)
temperature °C temperature °C Capacity (ton)
°C COP IPLV