China Harbour Engineering Co.L.L.C.
CHECK LIST FOR PAINTING WORKS
SUBCONTRACTOR : HUNAN general contracting L.L.C CONTRACTOR: CHEC
SECTION OF WORK : CIVIL LACATION :
LEVEL : BELOW GROUND LEVEL Page 1 of 4
CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
1 Internal paint on Plaster surfaces – Silk Finish
2 Internal Paint on Concrete / Gypsum Board Ceiling – Matt
Finish
Painting system including materials & color shades
approved.
Preliminary Method Statement, QCP, ITP & Risk Assessment
Checks approved.
Mock-up approved
Check surface preparation is done as per approved
method statement.
Surface Check defects in substrate are corrected.
Preparation Check for moisture content.
Check plaster surfaces are rubbed down with rubbing
stone.
Check material is thoroughly stirred prior to
application.
Check application of primer done as per approved
Application of method statement.
Primer
Check primer covers whole surface.
Check drying time is allowed to stucco application.
Check materials is thoroughly stirred prior to
application.
Check application of stucco is done only after curing
period of primer is over.
Application of Check suction spots are covered with primer prior to
filler coats stucco application.
(stucco) Check stucco is applied evenly and all angles &
corners are straight.
Check sanding is done between coats.
Check drying time is allowed as per approved
method statement.
FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :
China Harbour Engineering Co.L.L.C.
Name: Name: Name:
Sign: Sign: Sign:
Date : Date : Date :
CHECK LIST FOR PAINTING WORKS
SUBCONTRACTOR : HUNAN general contracting L.L.C CONTRACTOR: CHEC
SECTION OF WORK : CIVIL LACATION :
LEVEL : BELOW GROUND LEVEL Page 2 of 4
CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
Check that materials are mixed properly
Check that first coat is applied by roller over the
whole surface
Check that roller joint s are above eye level
Application of Verify that curing period is allowed as per approved
painting finish method statement
coats
Check that slight sanding is done between each coat
Check that second coat is applied after touch up, if
required, on first coat has been done
Verify that final coat is applied only after HVAC is
truly functional in the building
Cleaning and
Check clearing and protection of adjacent surfaces
protection
FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :
Name: Name: Name:
Sign: Sign: Sign:
Date : Date : Date :
China Harbour Engineering Co.L.L.C.
CHECK LIST FOR PAINTING WORKS
SUBCONTRACTOR : HUNAN general contracting L.L.C CONTRACTOR: CHEC
SECTION OF WORK : CIVIL LACATION :
LEVEL : BELOW GROUND LEVEL Page 3 of 4
CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
3 External Paint on Plaster Walls – Epoxy Paint System
Painting system including materials & color shades
approved.
Preliminary Method Statement, QCP, ITP & Risk Assessment
Checks approved.
Mock-up approved
Check surface preparation is done as per approved
method statement.
Surface Check defects in substrate are corrected.
Preparation Check for moisture content.
Check plaster surfaces are rubbed down with rubbing
stone.
Check material is thoroughly mixed as per approved
method statement prior to application.
Check application of sealer / primer done as per
Application of approved method statement.
Sealer / Primer
Check sealer / primer covers whole surface.
Check drying time is allowed prior to each
application.
Check material is thoroughly mixed prior to
application.
Check application of texture is done only after
curing period of primer is over.
Application of Check suction spots are covered with primer prior to
Texture texture application.
Check texture is applied evenly with spray gun
Check drying time is allowed as per approved
method statement.
FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :
China Harbour Engineering Co.L.L.C.
Name: Name: Name:
Sign: Sign: Sign:
Date : Date : Date :
CHECK LIST FOR PAINTING WORKS
SUBCONTRACTOR : HUNAN general contracting L.L.C CONTRACTOR: CHEC
SECTION OF WORK : CIVIL LACATION :
LEVEL : BELOW GROUND LEVEL Page 4 of 4
CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
Check that materials are mixed properly
Check that first coat is applied by roller over the
whole surface
Check that roller joints are above eye level
Application of Verify that curing period is allowed as per approved
Painting Finish Method Statement
Coats
Check that slight sanding is done between each coat
Check that second coat is applied after touch up, if
required, on the first coat has been done
Verify that final coat is applied only after first coat
has completely dried
Cleaning &
Check cleaning and protection of adjacent surfaces
Protection
FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :
Name: Name: Name:
Sign: Sign: Sign:
Date : Date : Date :