0% found this document useful (0 votes)
60 views13 pages

Moment Beams Taking Off

The document provides a summary of construction materials including beams, rebar, concrete and formwork quantities for various building locations (2110, 2120, 2160, 2150). It lists the item, location, number of beams, quantity of rebar in kg and concrete in cubic meters. Totals are provided for quantities, variance from tender, and billing amounts. Dimensions and quantities are also provided for formwork and scaffolding requirements.

Uploaded by

Lallama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views13 pages

Moment Beams Taking Off

The document provides a summary of construction materials including beams, rebar, concrete and formwork quantities for various building locations (2110, 2120, 2160, 2150). It lists the item, location, number of beams, quantity of rebar in kg and concrete in cubic meters. Totals are provided for quantities, variance from tender, and billing amounts. Dimensions and quantities are also provided for formwork and scaffolding requirements.

Uploaded by

Lallama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

SUMMARY

ITEM LOCATION BEAM QTY REBAR CONCRETE


(NOS) (KG) (M3)

2110

1 RCK-0010 40 27,213.07 63.28


2 RCK-0011 30 17,384.74 47.46
3 RCK-0012 36 20,556.39 56.95
4 RCK-0013 18 10,307.31 28.48
5 RCK-0014 27 9,761.82 37.02

2120

1 RCK-0010 53 24,447.63 81.44


2 RCK-0011 29 12,604.25 40.18
3 RCK-0012 33 16,781.28 49.64
4 RCK-0013 42 19,568.96 64.93
5 RCK-0001 22 13,364.27 34.80

2160

1 RCK-0001 69 38,584.13 112.20


2 RCK-0002 42 23,119.16 67.87
3 RCK-0003 32 18,771.24 52.71
4 RCK-0004 41 16,787.97 67.07
5 RCK-0010 14 7,558.71 22.15
6 RCK-0010 16 7,236.87 25.31

2150

1 RCK-0005 24 14,227.88 39.49

TOTAL 568.00 298,275.67 890.97

TENDER QTY/BEAM (38D) 306.92 1.07


TENDER QTY x CURRENT BEAM QTY 174,329.65 608.33

VARIANCE 123,946.02 282.65

BQ 1.452/TON LABOR + RM3 MATERIAL 4.45 448.80

551,807.69 126,851.72
TENDER QTY/BEAM (52D) 419.99 1.07
TENDER QTY x CURRENT BEAM QTY 238,556.36 608.33

VARIANCE 59,719.31 282.65

BQ 1.452/TON LABOR + RM3 MATERIAL 4.45 448.80

265,870.36 126,851.72
FORMWORK TENDER QTY TAKIN
(M2)

WIDTH
MAIN 0.4
64.00 SIDES 0.075
48.00 SIDES 0.075
57.60
28.80
37.44 2 JOINT/1 MOMENT BEAM

82.37 20 x T32 BAR AT 38D LAPPING


40.64 BAR SIZE QTY
50.21 32 20
65.66
35.20 2 JOINT/1 MOMENT BEAM

20 x T32 BAR AT 52D LAPPING


113.47 BAR SIZE QTY
68.64 32 20
53.31
64.99 2 JOINT/1 MOMENT BEAM
22.40
25.60

39.94

898.27

678,659.42
392,722.09
TENDER QTY TAKING OFF

HEIGHT LENGTH TOTAL


0.75 1.7 0.51
0.1 1.7 0.01275
0.1 1.7 0.01275

0.5355
MENT BEAM 1.071

AT 38D LAPPING
WEIGHT/M LAP 38D
6.31 1.216 153.4592

MENT BEAM 306.9184

AT 52D LAPPING
WEIGHT/M LAP 38D
6.31 1.664 209.9968

MENT BEAM 419.9936


COLUMN BEAM LENGTH REBAR
CONCRETE
SOUTH NORTH EAST WEST C/C BEAM OPENING TOTAL 1 JOINT TOTAL 2 JOINT

2110 232.00 151.00 81.00 37,730.75 75,461.51 196.17

2120 354.00 179.00 175.00 36,701.06 73,402.11 236.19

2160 451.00 238.00 213.00 63,400.25 126,800.50 301.04


2160-RCK0001 -
-
2160-RCK0001 108.00 69.00 39.00 19,292.07 38,584.13 112.20

2160-RCK0002

2160-RCK0002 93.00 42.00 51.00 11,559.58 23,119.16 67.87

2160-RCK0003

2160-RCK0003 76.00 32.00 44.00 9,385.62 18,771.24 52.71


-
2160-RCK0004 -
-
2160-RCK0004 62.00 41.00 21.00 8,393.98 16,787.97 67.07

2160-RCK0010

2160-RCK0010 26.00 14.00 12.00 3,779.36 7,558.71 22.15

2160-RCK0011

2160-RCK0011 44.00 16.00 28.00 3,618.44 7,236.87 25.31

2150-RCK0006

2150-RCK0006 42.00 24.00 18.00 7,113.94 14,227.88 39.49

### 568.00 469.00

OPENING QTY
1.80 -
1.85 -
1.90 -
1.95 -
2.00 79.00
2.05 -
2.10 - 137,832.06 275,664.12
2.15 -
2.20 -
2.25 -
2.30 -
2.35 -
2.40 - 20,868.94 41,737.88 111.04
2.45 -
2.50 386.00 137,832.06 275,664.12 733.40
2.55 1.00
2.60 - 158,701.00 317,401.99 844.44
2.65 3.00
2.70 39.00
2.75 15.00
2.80 45.00
2.85 -
-
568.00
86.00 71.00 137,832.06 733.40

568.00 469.00 0.80 40.00

654.00 540.00 110,265.65 29,335.84

586.00
T16 1.58 T16 1.58
T20 2.47 T20 2.47
T25 3.86 T25 3.86
T32 6.31 T32 6.31
FORMWORK SCAFFOLD
T40 9.86 T40 9.86

198.40 12,240.00 384.68


-
238.88 9,696.00 - 310.77
-
301.22 12,264.00 - 421.21
-
-
113.47 5,688.00 - 343.90 172.0
-
-
-
68.64 3,168.00 - 340.65 170.3
-
-
-
53.31 1,920.00 - 356.11 178.1
-
-
-
64.99 1,440.00 250.31 125.2
-
-
-
22.40 1,008.00 - 341.28 170.6
-
-
-
25.60 1,152.00 - 285.91 143.0
-
-
-
39.94 - - 360.32 180.2
#REF!
34,164.00

922,428.00

111.81 5,178.17

738.50 34,200.00

850.31 39,378.17
738.50 19.00

40.00 3,500.00

29,539.84 66,500.00

235,641.32

33,663.05

31,200.00

You might also like