0% found this document useful (0 votes)
221 views1 page

Post-Implementation Steps For SAP Note 2140519: A. UDO Report NOTE - 2140519

This document provides post-implementation steps for SAP Note 2140519. It explains that if the note is implemented via transaction SNOTE without the corresponding HR Support Package, additional manual steps are required. These include running UDO report NOTE_2140519 in three steps - test run, update and activate, and view generation - to validate and complete the implementation. If implemented as part of the full HR Support Package, these steps are unnecessary as the system will handle them automatically.

Uploaded by

Justin Gandhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
221 views1 page

Post-Implementation Steps For SAP Note 2140519: A. UDO Report NOTE - 2140519

This document provides post-implementation steps for SAP Note 2140519. It explains that if the note is implemented via transaction SNOTE without the corresponding HR Support Package, additional manual steps are required. These include running UDO report NOTE_2140519 in three steps - test run, update and activate, and view generation - to validate and complete the implementation. If implemented as part of the full HR Support Package, these steps are unnecessary as the system will handle them automatically.

Uploaded by

Justin Gandhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Post-implementation steps for SAP Note 2140519

Caution: If you do the implementation via transaction SNOTE (without implementing the corresponding HR Support
Package), you have to perform following post-implementation steps manually after you implement the SAP Note.
If you are implementing the whole HR Support Package, these steps are not needed; system will perform all steps
automatically.
A. UDO report NOTE_2140519
1. Run transaction SA38 (or SE38).
2. Fill in the Program field with value NOTE_2140519.
3. Click Execute (F8) button.
4. Pick Step 1 (TESTRUN) radio-button and click Execute (F8) button.
5. Analyze the UDO - Simulation Log and if no errors are present, continue with
step 6. If there are any errors, report a new CSS incident and do not
continue with implementation.
6. Go back to the selection screen and pick Step 2 (UPDATE & ACTIVATE) radiobutton.
Click Execute (F8) button.
7. Analyze the UDO - Change Log and if no errors are present, continue with
step 8. If there are any errors, report a new CSS incident and do not
continue with implementation.
8. Go back to the selection screen and pick Step 3 (GENVIEW) radio-button. Click
Execute (F8) button.
9. Analyze the UDO – View Generation Log and if no errors are present, your
implementation is completed successfully. If there are any errors, report a
new CSS incident.
Note: You can use option Info (SHOWLOGS) on the selection screen anytime to show
all messages from previous report run(s).

You might also like