Production Readiness Checklist

This document contains a detailed checklist of readiness criteria that must be met before deploying a new project into production. It includes requirements for hardware, performance, testing, user acceptance, training, and security. Each criteria is assigned to a responsible person and notes are included on completion status and any remaining work. The checklist aims to ensure all aspects of the project deployment are adequately addressed before the planned go-live date.

Uploaded by

Cris Tian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
715 views

Production Readiness Checklist

This document contains a detailed checklist of readiness criteria that must be met before deploying a new project into production. It includes requirements for hardware, performance, testing, user acceptance, training, and security. Each criteria is assigned to a responsible person and notes are included on completion status and any remaining work. The checklist aims to ensure all aspects of the project deployment are adequately addressed before the planned go-live date.

Uploaded by

Cris Tian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Project Name

Project Description

Planned Production Deployment Date

Document Date

High Level Readiness Criteria:

○ 1. Hardware
○ 2. End user device
○ 3. Performance
○ 4. Support
○ 5. Enterprise Architecture
○ 6. Security
○ 7. Testing
○ 8. User Acceptance
○ 9. User Guide and Training
○ 10. Helpdesk Documentation and Training
○ 11. Installation Guide
○ 12. Implementation Plan
○ 13. Customer Communication Plan
○ 14. Operations Guide
○ 15. Business Continuity / Disaster Recovery Plan(s)

Detailed Readiness Criteria:

Readiness Criteria Responsible Signed % Comments:


Person Off By Complete describe
(Note: some readiness remaining
and/or N/A if does
criteria may not apply to work and
Document not apply
Software as a Service/Cloud estimated
Name
service deployment) N/C if no completion
change date

1. Hardware

1.1 Hardware requirements


including disk space
requirement have been given to
support groups for resource
allocation.
1.2 The installation and
configuration requirements have
been met based on
requirements:
● Unix OS
● Windows OS
● Network
connectivity
● Redundancy
system
● Backend printing
● Offline storage
for reports and
audit log
● Database
(version, size,
etc)
● Infrastructure
software/middle
ware
● Application
software

2. End user device

2.1 Required hardware devices


(PCs, printers, etc.) and
software have been installed by
End Device support groups and
are functioning as expected.1

3. Performance

3.1 Service Level Agreement


(SLA) on application
performance has been defined,
documented, communicated,
and accepted by the customers.
3.2 Performance requirements
have been given to and
reviewed by server support
groups for system configuration.

3.3 Satisfactory capacity


estimates have been completed
based on load test.

3.4 Plan to monitor performance


has been developed and
communicated.

3.5 Plan for application, system,


database, and network tuning
has been defined and
communicated.
4. Support

4.1 On-going support has been


adequately staffed. Roles and
responsibilities have been
defined, documented,
communicated, and accepted by
all parties involved:
● Platform support
(servers,
mainframe),
DBA, Operations
● End device
support
● Identity &
Access Support
● Helpdesk
● Application
support
● User support
● Service
description in
UWIT Service
Catalog

In the case of Software as a


Service (SaaS/Cloud)
deployment, the following
should also be considered:
● Vendor platform
support SLA
and/or release
notes
● Browser support
4.2 System/Application
availability information has been
documented and communicated
to the appropriate groups per
project plan. Information
required includes:
● Service level
agreement (SLA)
● Hours of
availability
● Application
support contacts
● Database
support contacts
● System support
contacts
● User community
contacts
● Backup schedule
● Maintenance
window
● Downtime
procedures
● Communication
procedures: who
needs to be
notified in the
event of
scheduled/unsch
eduled downtime
and how

4.3 Customers have reviewed


support documentation and
have agreed to SLA.

5. Enterprise Architecture

5.1 Architectural review has


been completed with
satisfactory results or exception
request has been approved.
6. Security

6.1 Security review has been


completed. Required action
items identified have been
completed. (For web
applications, see the Application
Security Review Process for a
self-assessment.)

6.2 Required production access


accounts have been set up with
appropriate security profile (e.g.,
certificates, ASTRA
authorizations).

7. Testing

7.1 Detailed information about


the release, including fixes and
any other changes made to the
application, has been
communicated to test personnel.

7.2 Test completion criteria


(e.g., 98% test execution, 95%
test success, no blocking
defects) have been documented
and agreed upon by Test
personnel, Application Support
and Customers.

7.3 The level of test results


documentation (i.e., how much
detail) have been documented
and agreed upon by Test
personnel, Application Support
and Customers.
7.4 Functional Testing:
Application feature/functionality
has been tested and is
functioning as expected.

7.5 Integration Testing:


Interfaces have been tested and
are functioning as expected.

7.6 Business Cycle Testing:


Transactions and activities that
are date sensitive and occur
daily, weekly, or monthly, have
been tested and are functioning
as expected.

7.7 Compatibility Testing: New


or changed systems have been
tested on different software and
hardware configurations.

7.8 Installation Testing:


Installation/Upgrade procedures
have been tested with no
problems.

7.9 Performance Testing:


Application performance meets
the agreed Service Level
Agreement (SLA) with the
customers:
● Response time
● Throughput
volume
● Passive/active
users
● Peak/off peak
processing
capacity
● Transaction
process rate

7.10 Regression Testing: Fixes


and the overall integrity of the
software have been retested
with no new problems.

7.11 Failover/Recovery Testing:


The failover/recovery capability
from a variety of hardware,
software, or network
malfunctions has been tested
and is functioning as expected.

7.12 Impact on other systems


has been assessed and no
negative impacts have been
discovered.

7.13 All High Priority problems


as defined by project are
resolved or workarounds have
been developed and accepted
by users.
7.14 The test completion criteria
(see. 7.2) have been met, and
the following information has
been communicated to and
accepted by previously defined
stakeholders:
● Test variances
(expected results
vs. actual
results) and
reasons for the
variances
● Issues list
(resolved/not
resolved)
● Test adequacy
(reasons for
running or not
running defined
tests)

7.15 All previously defined test


documents have been
completed and distributed to the
appropriate groups.

8. User Acceptance

8.1 User acceptance testing is


completed.

8.2 End to end business


functionality (e.g. workflow and
key business process) has been
tested by the users and is
functioning as expected.

8.3 Sign-off for issues not fixed


has been completed.
9. User Guide and Training

9.1 Training documentation for


users and application support
has been completed and
distributed per training
communication plan.

9.2 Designated staff has


received training and has
demonstrated required
competency.

9.3 User documentation has


been completed or updated.

10. Helpdesk Documentation


and Training

10.1 Helpdesk documentation


has been completed or updated
and distributed two weeks in
advance of release date.

10.2 Helpdesk staff has


received training and has
demonstrated required
competency.
11. Installation Guide

11.1 Detailed instructions for the


implementation team have been
provided. These include:
● Architecture
overview
(hardware,
software) with
diagram and
interfaces
● Environmental
setup and
configuration
requirements
● Installation
procedures
● Backout
procedures
● Interdependency
details
● Logging
retention/usage
log availability

12. Implementation Plan

12.1 The package and the


installation scripts can be
installed repeatedly.

12.2 Stability has been defined


and achieved per plan.
12.3 A detailed plan for moving
the system from Test to
Production has been developed,
documented, and
communicated per project plan.
The plan should include:
● Steps to move
from test to
production
● Event log
description
● Installation
accuracy
verification
● Application
server impact
analysis
● Database impact
analysis
● Implementation
Support -
coverage during
implementation
period,
escalation
procedures, bug
tracking
● Post
implementation
verification
● Post
implementation
support - support
resource
schedule, bug
tracking, change
management,
escalation
procedures
● Contingency
plan
● Implementation
dates do not fall
on "make no
changes" dates.
Update the
Resource Usage
Calendar (link
may take you to
Inside UW-IT
homepage if you
are not logged
in. If this occurs,
use the link to
the calendar on
the left
navigation
menu) if
appropriate
● Notify IT-
servicechange@
uw.edu and/or
applicable
Change Advisory
Board (CAB) if
the change
warrants the
attention of
executive and
directors in UW-
IT
13. Customer Communication
Plan

13.1 Detailed customer


communication plan has been
developed, communicated, and
accepted. This plan should
include:
● Pre go-live
communication
plan
● Go-live
communication
plan
● Post go-live
communication
plan

13.2 Detailed information about


the release, including fixes and
any other changes made to the
application, has been
communicated to customers.

13.3 Means of user feedback


have been identified.
14. Operations Guide

14.1 Detailed operations guide


or update has been provided to
production support personnel.
This guide should provide
information to support personnel
to troubleshoot and maintain the
application in the production
environment. The guide should
include:
● Application
online/real time
operations
● Batch job
schedules
identified, along
with the criticality
of successful
completion of
each task
● Database
maintenance
schedules
● Data retention
requirements
● Backup
requirements
and procedures
● Disaster
recovery plan
(include
application and
database
recovery)
● Remote support
capabilities
● Monitoring,
alarming,
messaging
● Troubleshooting
tips
● Processing
and/or data
dependencies
(e.g., location of
data used by the
application)
● End user
devices and
hardware
● Vendor
contacts/mainten
ance agreement
numbers
15. Business Continuity /
Disaster Recovery Plan(s)

15.1 Detailed Business


Continuity / Disaster Recovery
plan(s) has been developed,
communicated, and accepted.

1 "Functioning
as expected" assumes that expectations and known issues are documented and
approved by appropriate participants.