0% found this document useful (0 votes)
111 views5 pages

Current Project: - (Voda-Idea Merger Project)

Ramji Gupta has over 12 years of experience in RF engineering for GSM, WCDMA, and LTE networks. He has expertise in radio network planning, optimization, drive testing, and parameter tuning. His current project involves RF planning for Vodafone-Idea merger cities. Past projects include swaps between vendors like Ericsson to Huawei and optimization work for clients in various countries. He aims to utilize his skills and determination to succeed in a reputed telecom company.

Uploaded by

Ramji Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views5 pages

Current Project: - (Voda-Idea Merger Project)

Ramji Gupta has over 12 years of experience in RF engineering for GSM, WCDMA, and LTE networks. He has expertise in radio network planning, optimization, drive testing, and parameter tuning. His current project involves RF planning for Vodafone-Idea merger cities. Past projects include swaps between vendors like Ericsson to Huawei and optimization work for clients in various countries. He aims to utilize his skills and determination to succeed in a reputed telecom company.

Uploaded by

Ramji Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

RESUME

RAMJI GUPTA

VILLAGE-BIDHUNA, POST- BIDHUNA, DISTRICT- ETAWAH (U.P.)-206243


Mobile: +91-9632909922 Email-ID:
[email protected]
Passport No- L7585795

Job Objective

To Work in a reputed company & want to achieve excellence in the RF FIELD by working with
my dedication and determination for success.

Job Profile

I have approx. 12.3 Year work experience in RF field as a RF-Lead in GSM (3.6 years), WCDMA
(7.3 years) & LTE (1.6 years) Networks with Parameters, KPIs & Counters.

 Planning -- Radio network planning and design, nominal planning, site selection, final
design and Simulation. Tool used Atoll, Asset, U-Net, MAPINFO and MCOM.
 Optimization -- analyzing the daily KPI and RNC report created from OSS, performing
the required changes in parameters or physically on-site in order to enhance the
performance of the network. Tool Used Genex Assistant NE-Explorer, Nepa,
Gladiator, ENIQ, ITK, OSIRIS, ACTIX, OPTIMI, WINFOIL etc.
 Drive Test-- Data collection, Real time Log files Analysis with Implementation in
Network, Troubleshooting, Migration, Software Up gradation and other activities. Tool
Used AGILENT, TEMS, NEMO, GENEX PROBE, GENEX ASSITANT, INVEX-3G & PCTEL
SCANNER etc.
 RND -- RF Surveys, RF Planning, Auditing.
 TND -- Los Surveys, Re-Routing.
 EMF Survey--Electromagnetic Field Survey for avoiding Radiation Effect.

Current Project: - (Voda-Idea Merger Project)

 Working on Top 20 City RF-Planning team for Delhi, Bangalore, and Mumbai location.
 Handle data collection from customer, Anchor Finalization, Spectrum Strategy.
 Prepare Cluster Polygon, Implement macro plan, city level planning.
 Handle Site Selection Strategy for GSM, UMTS & LTE based on coverage & capacity.
 Handle model tuning based of Drive test data, MR data or CW test data.
 Propagation Model calibration based on drive test data.
 For Urban, Suburban, Rural Scene only calibrate K1 & K2; For Dense urban scene, can
calibrate K1, K2 & K4.
 Check coverage & quality prediction based on ASP site selection in GSM, UMTS & LTE.
 ACP optimization based on EP, E-map, Cell load, Traffic map & path loss matrix.
 PCI and PSC planning : To improve SINR and Ec/Io, planning new PCI and PSC for all sites,
and update in EP to perform the predication
 Monte Carlo Simulation: Based on Vodafone & Idea Active/RRC users, engineering
parameter table of merged network.

Past Project: - (Ericsson to Huawei Swap Project)


 Handle WCDMA PNG MS Project (On Site)
 Handle Working in WCDMA optimization Solomon Island
 Handle WCDMA Ooredoo Kuwait MS Project.

 Master using and knowledge of Huawei UMTS troubleshooting, monitoring and optimization
tools such as U2000, FMA.
 Neighboring cell planning 3G>3G and 3G>2G Cluster optimization; considering to reduce pilot
pollution and improving RSCP and Ec/Io. Analyze call fail/drop event during cluster drive test
and come out with solutions.
 Check SHO and Inter-RAT HO 3G to 2G AMR and Inter RAT PS, HSDPA 3G to 2G and 2G to 3G.
 Optimize some KPIs, i.e.; Inter RAT CS 3G>2G, congestion due to UL power congestion.
 Responsible for monitoring an optimizing counters to maintain all KPIs to be the same as before
swapping to Huawei equipment such as CSSR, CDR, Traffic CS/PS, HOSR, and etc.
 Responsible for parameter inconsistency check according to default parameter template.
 Analysis of drive test data, identify weak coverage/quality areas, call related issues (CS/PS setup
time, pilot pollution, interference Ec/Io, missing neighbor, call drops, RAB establishment issues,
less throughput), rectification of the same.
 Handling optimization of new sites and handled problems like RAB Speech drop, interference,
IRAT handover failure, handover reversion, in-building problem, antenna tilting, competitive
Test.
 Optimizing RF Related Parameters such as Neighbor list, IRAT Relation (3G to 3G, 3G to 2G and
2G to 3G), Antenna Tilt, SC (Scrambling Code) and change other parameter values such as RSCP
and Ec/No.
 Responsible for parameter inconsistency check according to default parameter template.
 Analysis of drive test data, identify weak coverage/quality areas, call related issues (CS/PS setup
time, pilot pollution, interference Ec/Io, missing neighbor, call drops, RAB establishment issues,
less throughput), rectification of the same.

PAST PROJECT: - (12th Jan-2012 to 3rd Jul 2016)

Previously Working in Ericsson Global India Service Pvt. Ltd as a Sr. RF –Engineer.

 Currently working in WCDMA optimization SFR France Project (Nokia 3G


Project).
 Handle E2E WCDMA Acceptance Team of Orange-France Project.
 Handle OWP project of RMEA region LTE TDD/FDD STC, Saudi Arabia.
 Handle OWP Project of RMEA region 3G OMANTEL, Muscat Oman.
 Handle WCDMA optimization Batelco Bahrain Project.

The prime job functions included in WCDMA:

 HSPDA , 3G drive , Analysis of drive test data, identify weak coverage/quality areas, call
related issues (CS/PS setup time, Pilot pollution , interference Ec/Io , missing neighbor ,
call drops, RAB establishment issues, less throughput), rectification of the same.
 Handling optimization of new sites and handled problems like RAB Speech drop,
interference, IRAT handover failure, handover reversion, in-building problem, antenna
tilting, competitive Drive Test.
 Optimizing RF Related Parameters such as Neighbor list, IRAT Relation (3G to 3G, 3G
to 2G and 2G to 3G), Antenna E Tilt, SC (Scrambling Code) and change other parameter
values such as RSCP and Ec/No. By adding and deleting Neighbors for reduce Pilot
Pollution, interference, addition of missing Neighbors & SC changes in order to enhance
main routes performance.
 Responsible for performing the drive test by DT Engineer for the network at regular
intervals to check the Quality of Service & changing system parameters like Scrambling
Code assignments, neighbors lists, antenna orientations & tilt to achieve better coverage,
call quality & network capacity.
 Carried out optimization and Radio Frequency (RF) acceptance testing as well as site
survey and sector planning of new sites of rural areas.
 Performance engineering (Analyzing traffic data for drops, congestion, accessibility,
traffic growth etc.) based on the KPIs on daily basis.
 Analyzing in 3G(WCDMA) Interference, Call Drops, Handoff failures, IRAT Handover
failures, Common Pilot Channel Received Signal Code Power , Common Pilot Channel
Interference Ec/No, Scrambling Code and defining Neighbors(3G AND 2G BOTH), Check
relation b/w 3G and 2G etc.
 Handle Layer 3 Analysis through Actix tool for final acceptance drive.
 Good understanding in Ericsson OSS Performance Counters (ENIQ/BO/ITK).
 Experience in WCDMA RNO Functions Analysis (GPEH/UETR/WMRR/ WNCS).

PAST PROJECT: -(Dec 2010 to Dec 2011) -1.0 Yr. ( NSN to Huawei 3G Swap Project)
Previous working in the position of Sr. RF-Engineer but work as a Team Lead in HUAWEI
Telecommunication (I) Pvt. Ltd. on IDEA-3G project in HYDERABAD (A.P) Circle.

 Responsible for monitoring an optimizing counters to maintain all KPIs to be the same as before
swapping to Huawei equipment such as CSSR, CDR, Traffic CS/PS, HOSR, and etc.
 Contract point with a Nokia engineer to correct site information in border between Huawei MSC
Nokia MSC to improve Inter MSC HOSR.
 Responsible for parameter inconsistency check according to default parameter template.
 Analysis of drive test data, identify weak coverage/quality areas, call related issues (CS/PS setup
time, pilot pollution, interference Ec/Io, missing neighbor, call drops, RAB establishment issues,
less throughput), rectification of the same.
 Handling optimization of new sites and handled problems like RAB Speech drop, interference,
IRAT handover failure, handover reversion, in-building problem, antenna tilting, competitive
Test.
 Optimizing RF Related Parameters such as Neighbor list, IRAT Relation (3G to 3G, 3G to 2G and
2G to 3G), Antenna Tilt, SC (Scrambling Code) and change other parameter values such as RSCP
and Ec/No.
 By Adding and deleting Neighbor for reduce Pilot Pollution, interference, addition of missing
Neighbors & SC changes in order to enhance main routes performance.
 Handle EMF Survey project for Collecting & submitting site survey data, adjacent building data,
roof layout & photographs.

PAST PROJECT: - (Dec 2009 to Dec 2010) -1.0 Yr


Previous working in Zte Corporation as Sr. RF-Planning & Optimization at project
Reliance-3G in Kolkata & Orissa.

Responsibilities:
 Neighboring cell planning 3G>3G and 3G>2G Cluster optimization; considering to
reduce pilot pollution and improving RSCP and Ec/Io. Analyze call fail/drop event
during cluster drive test and come out with solutions.
 Check SHO and Inter-RAT HO 3G to 2G AMR and Inter RAT PS, HSDPA 3G to 2G
and 2G to 3G.
 Optimize some KPIs, i.e.; Inter RAT CS 3G>2G, congestion due to UL power
congestion.
 Daily Analysis Network performance statistics (KPI) e.g. Handover Statistics, Drop
Statistics, Neighboring list optimization, their reasons and take necessary action.
 Daily monitoring of OMCR reports to analyze the Radio network performance to
verify the Radio utilization, blocking (TCH/SDCCH), assign failures etc. & take
corrective steps to achieve the optimum KPI.
 Analysis RF-Path imbalance report & TA report in OMCR.
 Ensure the other BTS and BSC parameter to meet the KPI threshold.
 To find the causes of the call drops, blocked calls, handover failures, excessive
handovers, poor quality, poor C/I, interferences etc.
 New site planning in Existing sites depending on Drive test results, Customer
Complaints and capacity.
 Monitor the data KPI and work on the worst cells affected.
 New site planning in Existing sites depending on Drive test results, Customer
Complaints and capacity.

Project Details

PAST PROJECT: - (March 2008 to Nov 2009)- 1.8 yrs.


Previous project in PRITHVI INFORMATION SOLUTIONS LTD. as RF-Planning &
Optimization at project of RELIENCE GSM in DEHLI/NCR & CHENNAI Circle through HUAWEI
TELECOMMUNICATION INDIA PVT.LTD.

Responsibility:-
 Proficient in radio frequency planning, drive testing & analysis..
 Analyzing Nokia ND reports for checking cells having highest call drops,
SDCCH, TCH drops, SDCCH congestion & blocking, TCH congestion &
blocking..
 Frequency planning for new as well as existing sites. BCCH, BSIC &
Neighbors planning.
 Analysis of Drive test Log files, completely analysis of call drops, BCCH
interference, MAL Freq interference, Handover Issues, sector swap,
hardware issues.
 RF Drive Test conduction for improving the Rx Level & Rx Qual. Plot &
Optimization for Clusters
 Initial optimization of Networks such as Antenna System Verifications for
Antenna types, Tilts, Azimuths, verification of Jumpers & Feeders.
 Preparation of Guidelines & Processes for RF Planning & Associated
activities in line with business needs and requirements. Ensure
compliance to guidelines by team and vendors for better network
performance.
 Network rollout/launch with 1500 cell sites during the initial phase
followed by the RF Acceptance Testing and Signoff for all the towns from
the customer.
 New BSC addition and expansion proposals as per the requirement
depending upon the upcoming cell sites in the network.
 Analyzing interface, call drops, Hanover failures, Rx. level, Rx. quality etc.
 Monitor the KPI by daily wise, and improve the KPI.
 Network parameters & maintenance report check by weekly wise,
monthly wise according to project requirement.
 Coordinate with all drive test team & Handle customer complaint
problem.

PAST PROJECT: - (Jul 2006 to March 2008) – 1.9 years


Previous project in ADACELLWORKS LTD. as RF-Planning & Optimization at project of
AIRTEL in KOLKATTA (WEST BEGAL),PUNE (MAHARASTRA) & M.P.C.G with client of NSN.
Job Profile-
 Job Responsibilities covers the Radio Network Planning of GSM cellular
Network of MP & CG from Bharti end.
 Optimization of network based on coverage and capacity requirement of
customer for new and existing sites
 Checking & validating sites planned by Nokia team using GIS & MapInfo tool. If
required then drop planned sites after discussing it with Nokia team.
 Providing justification for the Frequency spectrum and budgeting for new sites
and BSC’s as per the predicted traffic Based on Predicted Customers.
 Planning of Data Network (GPRS & EDGE) with existing working GSM Network.
 Analyze network Drive Test conducted for Planning of New sites.
 Responsible for Network Rollout and site Selection.
 Planning of a Physical parameter of New Coming sites like Antenna Height,
Type, Tilt, Azimuth, and Location of an antenna.
 Handling Customer Complaints regarding coverage & Quality problems and
providing suitable solutions
 Suggest required physical changes and changes in parameter in OMC.
 To find the causes of the call drops blocked calls, handover failures,
excessive handovers, poor quality, poor C/I, interferences etc.
 Analyzing interface, call drops, Hanover failures, Rx. level, Rx. quality etc.
 Preparing RF survey & Transmission report.
 Coordination with team, working in field & give support in Nominal
survey.
 Doing RF survey & transmission (LOS) part.

Training Attended

 Successfully completed the “W10 RAN Functional tuning Training” by


Ericsson India Global Pvt. Ltd.
 Successfully completed the “WCDMA AIR INTERFACE Training” by Ericsson
India Global Pvt. Ltd.
 Successfully completed the “W10 RF Optimization Training” by Ericsson
India Global Pvt. Ltd.
 Successfully completed the “HSDPA Training” by Ericsson India Global Pvt.
Ltd.
 Successfully completed the “LTE Optimization Training” by Ericsson India
Global Pvt. Ltd.
 Successfully completed the “LTE Interface Training” by Ericsson India
Global Pvt. Ltd.
 Successfully completed the “LTE Optimization Certification” by Ericsson
India Global Pvt. Ltd.
 Successfully completed the “IP CERTIFICATION” by Ericsson India Global
Pvt. Ltd.
 Successfully completed the “RAN Certification” by Ericsson India Global
Pvt. Ltd.
 Successfully completed the “RNO Certification” by Ericsson India Global
Pvt. Ltd.
 Successfully completed the “RND Certification” by Ericsson India Global
Pvt. Ltd.
 Successfully completed the “BUGS Experienced” by Ericsson India Global
Pvt. Ltd.

 Technical Skill
 MRR, NCS, Citrix, Winfoil, ENIQ, OSIRIS, FFAX, WNCS, WMRR, GPEH, RF Visual,
ENIQ, MOSHELL.
 MapInfo, MCOM etc.
 Genex Assistant NE-Explorer, NEPA, Gladiator, ITK, ACTIX, OPTIMI, WINFOIL etc.
 Tool Used AGILENT, TEMS, NEMO, GENEX PROBE, GENEX ASSITANT, INVEX-3G &
PCTEL SCANNER, OMCR, etc.

Educational Qualification
 B.TECH in Electronic & Telecommucation Engg. From UPTU LUCKNOW.
 Diploma in Electronic Engg. From U.P.B.T.E LUCKNOW.
 Class XII passed from P.I.C College BIDHUNA, AURAIYA (U.P.).
 Class X passed from P.I.C College BIDHUNA, AURAIYA (U.P.).

Personal Details

Father’s Name : Mr. YOGESH KUMAR GUPTA


Date of Birth : July 15, 1983
Language Known : English, Hindi
Permanent Address : VILL: - Bidhuna, P.O.:- Bidhuna.
: DISTT: - Auraiya,-206243, U.P. (INDIA)

Declaration

I hereby certify that the information furnished above is correct and complete to the best of my
knowledge and belief.

Date: RAMJI
GUPTA

You might also like