Pile Cap Design for 3-Piles Pattern Based on ACI 318-14
DESIGN CRITERIA
1. FROM PILE DESIGN & SOIL REPORT, DETERMINE SINGLE PILE MAX LOADS OR CAPACITY AT CAP BOTT
2. THE MAXIMUM COLUMN CAPACITY AT COLUMN BASE, fPn,col, fMn,col, fVn,col, MAY BE BASED ON PILE CAP
USER CAN CHANGE THE YELLOW CELLS TO MODIFY THEM FOR DIFFERENT CASES.
3. PILE CAPS SHALL BE INTERCONNECTED BY TIES WITH Min(0.25, S DS/10) TIMES AXIAL VERT COLUMN LO
ANALYSIS
CHECK FLEXURE CAPACITY AT COLUMN FACE (ACI 318 21,22, & 24.4.3.1)
Pile Spacing = 60 in
Cap Edge Length = 136.2 in
L1-1 = 77.0 in, length of section 1-1
L2-2 = 104.7 in, length of section 2-2
Mu, 1-1 = 113.4 ft-kips / ft, (to middle of cap elevation)
Mu, 2-2 = 123.7 ft-kips / ft, (to middle of cap elevation)
rprovD = 0.0012
M u, max
0.85 f c' 1 1
0.383b d 2 f c'
r 0.0008 < rprovD [Satisfactory]
fy
0.85 1 f c' u
r MAX 0.0206 > rprovD [Satisfactory]
fy u t
T 4
r MIN MIN 0.0018 , r 0.0011 < rprovD [Satisfactory]
d 3
CHECK ONE WAY SHEAR CAPACITY AT THE FACE OF COLUMN & PILE
(ACI 318 22.5)
L3-3 = 62.4 in, length of section 3-3
Vu, 2-2 = 2 (fPn) / L2-2 = 0.0 kips / ft (No shear at "d" offset.)
Vu, 3-3 = (fPn) / L3-3 = 0.0 kips / ft (No shear at "d" offset.)
CHECK COLUMN PUNCHING CAPACITY (ACI 318 13.2.7.2, 22.6.4.1, 22.6.4.3, & 8.4.2.3)
P u ,col 0.5 v M u ,col b1
f v c( psi ) f 2 y f 'c v u ( psi )
190 ksi > AP J 31
1
c = v 1
where 1.00 2 b1 0.4
1
b1 = (C + d) = 77 in 3 b2
b2 = (C + d) = 77 in
b0 = 2b1 + 2b2 = 308 in d b3 d 2 b
J 1 1 3 2
Ap = b0 d = 16324 in2 6 b1 b1
CHECK SINGLE PILE PUNCHING CAPACITY (ACI 318 13.2.7.2, 22.6.4.1, 22.6.4.3, & 8.4.2.3)
P u,col 0.5 v M u,col b1
f v c( psi ) f 2 y f 'c v u ( psi)
95 ksi > AP J 49
870 ft4
(cont'd)
ksi [Satisfactory]
PROJECT :
CLIENT :
JOB NO. : DATE :
Pile Cap Design for 4-Piles Pattern Based on ACI 318-14
DESIGN CRITERIA
1. FROM PILE DESIGN & SOIL REPORT, DETERMINE SINGLE PILE MAX LOADS OR CAPACITY AT CAP BOTT
2. THE MAXIMUM COLUMN CAPACITY AT COLUMN BASE, fPn,col, fMn,col, fVn,col, MAY BE BASED ON PILE CAP
USER CAN CHANGE THE YELLOW CELLS TO MODIFY THEM FOR DIFFERENT CASES.
3. PILE CAPS SHALL BE INTERCONNECTED BY TIES WITH Min(0.25, S DS/10) TIMES AXIAL VERT COLUMN LO
ANALYSIS
CHECK FLEXURE CAPACITY AT COLUMN FACE (ACI 318 21,22, & 24.4.3.1)
Pile Spacing = 60 in
Cap Edge Length = 104.0 in
L1-1 = 113.1 in, length of section 1-1
L2-2 = 104.0 in, length of section 2-2
Mu, 1-1 = 80.3 ft-kips / ft, (to middle of cap elevation)
Mu, 2-2 = 156.2 ft-kips / ft, (to middle of cap elevation)
rprovD = 0.0016
M u, max
0.85 f c' 1 1
0.383b d 2 f c'
r 0.0010 < rprovD [Satisfactory]
fy
'
0.85 1 f c u
r MAX 0.0206 > rprovD [Satisfactory]
fy u t
T 4 rprovD
r MIN MIN 0.0018 , r 0.0014 < [Satisfactory]
d 3
CHECK ONE WAY SHEAR CAPACITY AT THE FACE OF COLUMN & PILE
(ACI 318 22.5)
L3-3 = 82.2 in, length of section 3-3
Vu, 2-2 = 2 (fPn) / L2-2 = 0.0 kips / ft (No shear at "d" offset.)
Vu, 3-3 = (fPn) / L3-3 = 0.0 kips / ft (No shear at "d" offset.)
CHECK COLUMN PUNCHING CAPACITY (ACI 318 13.2.7.2, 22.6.4.1, 22.6.4.3, & 8.4.2.3)
P u ,col 0.5 v M u ,col b1
f v c( psi ) f 2 y f 'c 190 ksi > vu ( psi ) 42
AP J
1
where c = 1.00 v 1 0.4
2 b1
b1 = 1
(C + d) = 77 in 3 b2
b2 = (C + d) = 77 in
b0 = 2b1 + 2b2 = 308 in d b3 d 2 b
Ap = b0 d J 1 1 3 2
= 16324 in 2
6 b1 b1
CHECK SINGLE PILE PUNCHING CAPACITY (ACI 318 13.2.7.2, 22.6.4.1, 22.6.4.3, & 8.4.2.3)
d b3 d 2 b
J 1 1 3 2 90 ft4
6 b1 b1
1
v 1
2 b1 0.4
1
3 b2
4 d
y MIN 2, , 40 2.0
b0
c
870 ft4
(cont'd)
ksi [Satisfactory]
PROJECT :
CLIENT :
JOB NO. : DATE :
Pile Cap Design for 2-Piles Pattern Based on ACI 318-14
DESIGN CRITERIA
1. FROM PILE DESIGN & SOIL REPORT, DETERMINE SINGLE PILE MAX LOADS OR CAPACITY AT CAP BOTT
2. THE MAXIMUM COLUMN CAPACITY AT COLUMN BASE, fPn,col, fMn,col, fVn,col, MAY BE BASED ON PILE CAP
USER CAN CHANGE THE YELLOW CELLS TO MODIFY THEM FOR DIFFERENT CASES.
3. PILE CAPS SHALL BE INTERCONNECTED BY TIES WITH Min(0.25, S DS/10) TIMES AXIAL VERT COLUMN LO
ANALYSIS
CHECK FLEXURE CAPACITY AT COLUMN FACE (ACI 318 21,22, & 24.4.3.1)
Pile Spacing = 60 in
Cap Edge Length = 104.0 in
L1-1 = 44.0 in, length of section 1-1
Mu, 1-1 = 104.4 ft-kips / ft, (to middle of cap elevation)
rprovD = 0.0016
M u , max
0.85 f c' 1 1
0.383b d 2 f c'
0.0007 < rprovD [Satisfactory]
r
fy
'
0.85 1 f c u rprovD
r MAX 0.0206 > [Satisfactory]
fy u t
T 4
r MIN MIN 0.0018 , r 0.0009 < rprovD [Satisfactory]
d 3
CHECK ONE WAY SHEAR CAPACITY AT THE FACE OF COLUMN & PILE
(ACI 318 22.5)
L2-2 = 44.0 in, length of section 2-2
Vu, 1-1 = (fPn) / L1-1 = 0.0 kips / ft (No shear at "d" offset.)
Vu, 2-2 = (fPn) / L2-2 = 0.0 kips / ft (No shear at "d" offset.)
CHECK COLUMN PUNCHING CAPACITY (ACI 318 13.2.7.2, 22.6.4.1, 22.6.4.3, & 8.4.2.3)
c = 1
where 1.00 v 1 0.49367
2 b1
b1 = (C + d) = 77 in 1
3 b2
b2 = [(C + min(Edge , d)] = 36 in
b0 = 2b1 + 2b2 = 226 in
d b3 d 2 b
Ap = b0 d = 11978 in 2 J 1 1 3 2
6 b1 b1
CHECK SINGLE PILE PUNCHING CAPACITY (ACI 318 13.2.7.2, 22.6.4.1, 22.6.4.3, & 8.4.2.3)
d b3 d 2 b
J 1 1 3 2 31 ft4
6 b1 b1
1
v 1 0.4
2 b1
1
3 b2
4 d
y MIN 2, , 40 2.0
b0
c
559 ft4
(cont'd)
ksi [Satisfactory]