Mettur Thermal Power Station - I: Station/Stage Unit No. of Days

Mettur Thermal Power Station-I is located in Salem District, Tamil Nadu. It was the first inland thermal power station of TANGEDCO. The station has 4 units with a total capacity of 840 MW. Units I and II were commissioned in 1987-1988, while Units III and IV were commissioned in 1989-1990. All units are coal-fired and receive coal from mines in Orissa and West Bengal. In 2016-17, the station generated 5730.765 MU with a plant load factor of 77.88%. The station has set records for continuous running and has received several awards for its performance and utilization of fly ash.

Uploaded by

Vicky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views2 pages

Mettur Thermal Power Station - I: Station/Stage Unit No. of Days

Mettur Thermal Power Station-I is located in Salem District, Tamil Nadu. It was the first inland thermal power station of TANGEDCO. The station has 4 units with a total capacity of 840 MW. Units I and II were commissioned in 1987-1988, while Units III and IV were commissioned in 1989-1990. All units are coal-fired and receive coal from mines in Orissa and West Bengal. In 2016-17, the station generated 5730.765 MU with a plant load factor of 77.88%. The station has set records for continuous running and has received several awards for its performance and utilization of fly ash.

Uploaded by

Vicky
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

METTUR THERMAL POWER STATION – I

 Mettur Thermal Power Station - I is situated in Salem District.


 This is the first inland thermal Power Station of TANGEDCO.
 The first stage consists of units I & II of 210 M.W at a cost of
Rs.384.30 crores.
 The second stage consists of units III &IV of 210 M.W each at a cost of
Rs.351.76 crores.
 All the four units are coal based.
 Coal for MTPS is received from Mahanadhi coal fields Limited (Talchar
& IB Valley), Orissa, Eastern coal fields Limited, Ranikanj, West Bengal.
 Generation & PLF for the year 2016-17 is 5730.765 MU, PLF 77.88 %
 Record of continuous running

STATION/STAGE UNIT NO. OF DAYS


MTPS-I Station record 73
MTPS-I/I Unit I 259
Unit II 205
MTPS-I/II Unit III 337
Unit IV 311
Name & Address Stage Unit Capacity(M.W) Date of
Commissioning
Mettur T.P.S, I I 210 07/01/1987
Metturdam, II 210 01/12/1987
Salem(District), II III 210 22/03/1989
IV 210 27/03/1990
PIN:636406.
Phone No. 04298 -240390
Fax No. 04298 -240011
e mail :[email protected]

AWARDS AND ACHIEVEMENTS:

 MTPS-I is IS/ISO 9001: 2008 certified Organization


 MTPS-I hadreceived II prize for Fly Ash Utilization from Ministry of Power,
Ministry of Environment and Dept. of Science & Technology/GOI/ND during
2005.
 Commendation Certificate received from Ministry of Power/GOI/ND for the
year 2015 towards appreciation for Energy Conservation.
 Appreciation award received from National Safety Council, Govt. of TN for the
year 2014 for promoting Safety, Health & Environment.
 MTPS-I is in No1position in TANGEDCO for the PLF achievement for the four
consecutive years (2013-14, 2014-15, 2015-16 & 2016-17)
 MTPS-I is the only station in TANGEDCO to cross the Annual PLF of 90 % six
times.
 New Land marks Achieved
 Sp. Oil consumption during March 2017 is NIL for Station
 660 No. coal Wagons were tipped on 27.04.2015 with out
demurrage