This blasting and painting inspection report documents the surface preparation and coating application for a column project. It records the blasting standard achieved, paint products and colors used, required and measured dry film thicknesses, areas inspected, and approval signatures. The report found the work to be accepted and in compliance with specifications.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
326 views1 page
Blasting Painting Report (Example)
This blasting and painting inspection report documents the surface preparation and coating application for a column project. It records the blasting standard achieved, paint products and colors used, required and measured dry film thicknesses, areas inspected, and approval signatures. The report found the work to be accepted and in compliance with specifications.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
Company
Logo Project Name
BLASTING PAINTING INSPECTION REPORT
Project : Doc.No : Owner : Date : Item : Column (exampel) Area : Surface Preparation Blasting Standard : ISO Sa 2½ Weather : Sunny (Near White Blast Cleaning) Air Temperature : °C Type of abrasive : Silica Sand Steel Temperature : °C Blasting/Painting Method : Blasting with Compressor/ Air Spray Relative Humidity : % Dew Point : °C
Painting Layer Brand Colour DFT Req Thinner
Primer Coat Second Coat Top Coat
SKETCH
Area Area of Inspection Remark
Coat A B C D E Avg Primer Coat (DFT µm) Second Coat (DFT µm) Top Coat (DFT µm)