List of Document Id's
List of Document Id's
7. Documentation (DO)
a. DO.010 Define documentation requirements and strategy
b. DO.020 Define Documentation standards and procedures
c. DO.030 Prepare Glossary
d. DO.040 Prepare documentation environment
e. DO.050 Produce Documentation proto type and templates
f. DO.060 Publish User reference manual
g. DO.070 Publish User Guide
h. DO.080 Publish Technical reference manual
i. DO.090 Publish System Management Guide
8. Business System Testing (TE)
a. TE.010 Define testing requirements and strategy
b. TE.020 Develop unit test script
c. TE.030 Develop Link Test script
d. TE.040 Develop system test script
e. TE.050 Develop systems integration test script
f. TE.060 Prepare testing environment
g. TE.070 Perform Unit Test
h. TE.080 Perform Link Test
i. TE.090Perform Installation test
j. TE.100 Prepare key users for testing
k. TE.110 Perform System Test
l. TE.120 Perform System integration Test
m. TE.130 Perform Acceptance Test
9. Performance Testing (PT)
a. PT.010 Define Performance Testing Strategy
b. PT.020 Identify Performance Test Scenarios
c. PT.030 Identify Performance Test Transaction
d. PT.040 Create Performance Test Scripts
e. PT.050 Design Performance Test Transaction Programs
f. PT.060 Design Performance Test Data
g. PT.070 Design Test Database Load Programs
h. PT.080 Create Performance Test Transaction Programs
i. PT.090 Create Test Database Load Programs
j. PT.100 Construct Performance Test Database
k. PT.110 Prepare Performance Test Environment
l. PT.120 Execute Performance Test
10. Adoption and Learning (AP)
a. AP.010 Define Executive Project Strategy
b. AP.020 Conduct Initial Project Team Orientation
c. AP.030 Develop Project Team Learning Plan
d. AP.040 Prepare Project Team Learning Environment
e. AP.050 Conduct Project Team Learning Events
f. AP.060 Develop Business Unit Manager’s Readiness Plan
g. AP.070 Develop Project Readiness Roadmap
h. AP.080 Develop and Execute Communication Campaign
i. AP.090 Develop Managers’ Readiness Plan
j. AP.100 Identify Business Process Impact on Organization
k. AP.110 Align Human Performance Support Systems
l. AP.120 Align Information Technology Groups
m. AP.130 Conduct User Learning Needs Analysis
n. AP.140 Develop User Learning Plan
o. AP.150 Develop User Learningware
p. AP.160 Prepare User Learning Environment
q. AP.170 Conduct User Learning Events
r. AP.180 Conduct Effectiveness Assessment
11. Production Migration (PM)
a. PM.010 Define Transition Strategy
b. PM.020 Design Production Support Infrastructure
c. PM.030 Develop Transition and Contingency Plan
d. PM.040 Prepare Production Environment
e. PM.050 Set Up Applications
f. PM.060 Implement Production Support Infrastructure
g. PM.070 Verify Production Readiness
h. PM.080 Begin Production
i. PM.090 Measure System Performance
j. PM.100 Maintain System
k. PM.110 Refine Production System
l. PM.120 Decommission Former Systems
m. PM.130 Propose Future Business Direction
n. PM.140 Propose Future Technical Direction