Lead the group of seventy design engineers and managed in time delivery of deliverables while
maintaining the high quality standards. Supervised all design related activities on Projects of National
Interest like 3600 MW Combined Cycle Power Plants, Orange Line Metro Project, Safe City Project,
Aziz Cross Gujranwala, Upgradation and Rehabilitation of Main Line (ML-1) etc. Gave technical
inputs for optimization of costs, betterment of structural engineering solutions and developed the
culture of technical discussions along with intricate study of Codes & Standards. Attended numerous
technical meetings and gave valuable inputs for envisaged outcome.
Structures of the Mangla Dam Project were designed in early 1960’s, Basic criteria for the design of
structure was future raising of the Dam by 40 ft. Finally it is planned to raise all the structures by
30 ft.
Supervised the analysis and design of headworks, abutment gravity walls and emergency spillway
etc..For the structural design of above structure, carried out finite element analysis on SAP2000 V8
using ASOLID & SOLID elements.
TAHIR-UR-REHMAN
Analysis, design and preparation of construction drawings of Balanced Cantilever Bridge of span 28-
94-28 m over Bong canal at downstream of Mangla Powerhouse.
Analysis, design and preparation of construction drawings of buildings of Mirpur New City and four
towns.
Carried out the analysis and design of concrete and steel structures and prepared construction
drawings as per ARAMCO Standards. Worked on the following Projects:
Analysis and design of Balanced Cantilever Prestress Box Girders of spans 85-170-85 m, 35-70-70-
70-35 m for bridges over River Jhelum at Dhangali & Naluchi. Prepared concrete outline, prestress
and reinforcement detailed drawings for the box girders and hollow rectangular box section pier and
pile foundations.
Planned and designed widening of Sharpao Bridge from 2-lanes to 4-lanes. Sharp kink of the existing
bridge was also ease out by widening it from 900 mm to 6000 mm. Developed structural system for
the kink removal and additional 2 - lanes. Carried out analysis and design of the superstructure and
substructure of the bridge for complete 4 - lanes.
Analyzed and designed the superstructure and substructure of the bridge extension over canal at Jail
Road for additional 2-lanes on both sides of existing bridge.
Due to flood the piles of three piers of the bridge near JatliHeadworks faced serious problem
pertaining to the tilting/rotation before construction of piers. Developed and designed the
strengthening measures of the piles for already built piers of the bridge on the basis of modified
design criteria. In addition, supervised the analysis, design of the bridge and prepared the
construction drawings.
Analysis and design of deck slab, piles, retaining walls and pumping station. Prepared concrete
outline and reinforcement detailed drawings.
Analysis and design of precast and pre-stressed girders spanning 18 m & 33 m including deck slab,
and post tensioned continuous box girder.
Analysis and design of substructures including abutments, retaining walls, pier caps, piers, pile caps
and piles for the different types and spans of bridges.
Analysis and design of 22.5 m balanced cantilever prestress box girder with suspended deck of 45
m (total span 90 m) for bridges over Chenab and Indus River (each approx. 1 km long). Prepared
concrete outline, prestress and reinforcement detailed drawings for the deck slab, girders/box girders.
Analysis and design of box culverts and road underpasses of various sizes and fill heights. Prepared
concrete outline and reinforcement detailed drawings for the box culverts and road underpasses.
Urea bulk storage structure with plan dimensions of 162 m x 80 m was analyzed and designed using
STAAD-III/ISDS as per AISC Code. The structural system for the bulk comprised of 80 m span
steel trusses spaced at 6 m c/c with pile foundations (more than 250 piles).
3-D Computer model was prepared to analyze the belt conveyors (max span 24 m). Analysis and
design of belt conveyors & trestles was completed using STAAD-III/ISDS.
Design and drawings of steel farming, bolted & welded connections and other details for urea bulk
storage, belt conveyors and trestles were done.
Carried out the analysis and design of all the components of the following sewerage treatment
units and pumping stations.
i) Odan River Pumping Station
ii) Kaneshie Drain Pumping Station
iii) Korle Bu Motorway &Gono Drain Pumping Stations
3
TAHIR-UR-REHMAN
Review of analysis, design and drawings of various concrete and steel structures including workshop
and store building, pipe racks, steam turbine building, cooling water treatment building, sludge pond,
water receiving pool & pump house etc. Analysis & design of structures were carried out to verify
& confirm the contractor's calculations.
KotAddu Thermal Power Plant Units 13, 14 & 15 (capacity: 100 MW each)
Review of analysis, design & drawings of KotAddu Thermal Power Plant. The project included
primarily steel structures, building, cooling, tower, turbine generator foundation and other structures
required for the operation of Thermal Power Plant.
Analysis & design of 5-Story concrete structure of Oncology Center. 3-D Computer model
consisting of 245 beam & column members & 1100 plate elements of walls and raft was prepared
on STAAD-III/ISDS to analyze the structure. Prepared concrete outline and reinforcement details
drawings.
Review of analysis, design and drawings of 7-storey hospital building with plan dimension of 60 m
& 192 m. Waffle slab system was used in the whole building. Analysis & design of Hospital Building
was carried out to verify and confirm the calculations and drawings.
Development Schemes for the Shrine of Baba Farid (RA), Pakpattan
Analysis & design of 4-storey octagonal shape concrete structure of mosque building. 3-D computer
model consisting of 644 beam elements & 735 plate elements was prepared on STAAD-III/ISDS to
analyze the complex structure. Prepared concrete outline & reinforcement detail drawings.
Analysis and design of Overhead Water Tanks having capacity of 10,000 to 100,000 gallons
and sewage pumping stations. Prepared concrete outline and reinforcement detailed construction
drawings.
Analysis and design of Diversion Structures which consisted of weirs, undersluices and main intakes.
Also prepared the concrete outline and reinforcement detailed drawings for the above structures.
Worked on the analysis and design of Irrigation Structures such as intakes, distribution structures,
cross-regulators, drop structures and culverts. Prepared concrete outline and reinforcement detailed
construction drawings.
4
TAHIR-UR-REHMAN
Following Softwares were used frequently for the analysis and design of different types of structures.
SAP2000 v19
CSI Bridge Module v17
ETABS v17
SAFE v16
STAADIII v17
EXCEL
MICROSOFT WORD