2 HP WTR Hdr-Seal Trough Flushing

1. The document lists piping specifications for various headers, pumps, and other equipment. Key piping includes 350NB, 150NB, 100NB, 500NB headers and lines. 2. Valves specified include globe valves, gate valves, and plug valves in sizes such as 150NB, 80NB, and 50NB. 3. Pumps and equipment mentioned include seal water pumps, slurry pumps, an overflow tank, and a flushing apparatus. Motor quantities and sizes are provided. 4. Available and erected quantities are listed for many line items.

Uploaded by

sekhar_ntpc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views10 pages

2 HP WTR Hdr-Seal Trough Flushing

1. The document lists piping specifications for various headers, pumps, and other equipment. Key piping includes 350NB, 150NB, 100NB, 500NB headers and lines. 2. Valves specified include globe valves, gate valves, and plug valves in sizes such as 150NB, 80NB, and 50NB. 3. Pumps and equipment mentioned include seal water pumps, slurry pumps, an overflow tank, and a flushing apparatus. Motor quantities and sizes are provided. 4. Available and erected quantities are listed for many line items.

Uploaded by

sekhar_ntpc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

SW Source Avl

1 HP Wtr Hdr- Flushing header-


i 350NB
ii 150NB
iii 100 NB + Plug Valve
2 HP Wtr Hdr- Seal trough Flushing
i 350NB
ii 150NB+150 NB Globe v/v+150NB Gate V/V

3 LP Hdr to Refractory cooling Header


i 500NB/350NB
ii 150NB+150NB Plug V/V+150NB Gate V/V
BA Hopper
iii 100 NB+20NB-26 Nos +20 NB Globe v/v
4 LP Hdr to Sealtrough M/U
i 500 NB/350NB/80NB+80NB Plug V/V+80NB Globe V/V
ii 32NB
iii 15 NB for inspection window cooling 1
5 LP Hdr to Hopper Filling 2
i 500NB/350NB+350NB Globe V/V+350 NB BF v/v/ 3
ii 250NB+250NB B/F V/V 4
iii 5
5
SW Source Avl

1 Seal Wtr P/p 1/2.


2 Motor 0/2.
BA Seal water 3 Piping- 100 NB/80 NB
system 4 25 NB Globe V/C-0/12 Nos
5 25 NB SOV-0/6 Nos
6 25 NB Gate V/V-0/6 Nos

Feed Slurry
Gate,CG
Jet Pump Slurry Line Sump

Feed gate -6/6 1 Jet Pump-6/6 1 Basalat Pipe 1 Liner-50/70MT


Clinker Grinder-6/6 2 Pneumatic KGV 2 Plug Valve-3/3
Feed sump-6/6 3 Coupling -80/250 NB 3 Plug Valve support-3/3
Motor/CG/FC-0/6 4 Bends
Air oil Converter-6/6
IA-32NB/20NB/SOV

HP wtr line to Jet P/P


i 350NB
ii 150NB
iii 150NB Globe v/v-18 Nos
iv 150 NB P Cyl B/F-6 Nos
v 150 NB Gate valve-6 Nos
Slurry Sump
to P/P Suction

Scope Avl Erec


1 Liner-2/3 Nos Sump 3 2 2 1
2 Plug V/V - 3/3 3 3 0 2
3 500 NB Basalt suction Bend 3 0 0 3
4 Basalt Tee for Flushing line 3 0 0 4
5 500 NB KGV-3 Nos 3 0 0 5
6
scope Avl Erec
1 Over Head Tank 1 o 0
Seal water 2 Base Frame 2 2 2
P/P & its 3 Seal Wtr P/P 2 2 2
system
4 Motor-5/6 Nos 2 2 2
6 C&I , PG, PS etc 0 0

P/P Disch to
Slurry P/Ps Dyke

scope Avl Erec scope Avl Erec


Base Frame - 1st stg-2/ 3 2 2 1 400 NB Disch V/V 3 o 0
Base Frame - 2st stg-0/ 3 0 0 2 500 NB Pipes-3 Nos Line in KM 19 2 2
Slurry P/PS-2/6 Nos 6 2 1 3 500 NB Basalt Bends in No 48 0 0
Motor-5/6 Nos 6 5 1 4
Fluid Coupling-3/3 3 3 1
Gear Box-0/3 3 0 0
1 HP Wtr Hdr- Flushing header-350NB/250NB/150NB/100NB+100NB Plug
2 HP Wtr Hdr- Seal trough Flushing- 350NB/150NB+150 Globe V/V+150NB
3 HP wtr line to Jet P/P-350NB/150NB+Gobe valve-18 Nos+150NB P/Cyl B/
4 LP Hdr to Refractory cooling Header-500NB/350NB/150NB+150 NB Plug

1 HP Wtr Hdr- Flushing header-


i 350NB
ii 150NB
iii 100 NB + Plug Valve
2 HP Wtr Hdr- Seal trough Flushing
i 350NB
ii 150NB+150 NB Globe v/v+150NB Gate V/V
3 HP wtr line to Jet P/P
i 350NB
ii 150NB
iii 150NB Globe v/v-18 Nos
iv 150 NB P Cyl B/F-6 Nos
v 150 NB Gate valve-6 Nos
4 LP Hdr to Refractory cooling Header
i 500NB/350NB
ii 150NB+150NB Plug V/V+150NB Gate V/V
iii 100 NB+20NB-26 Nos +20 NB Globe v/v
5 LP Hdr to Sealtrough M/U
i 500 NB/350NB/80NB+80NB Plug V/V+80NB Globe V/V
ii 32NB
iii 15 NB for inspection window cooling
6 LP Hdr to Hopper Filling
i 500NB/350NB+350NB Globe V/V+350 NB BF v/v/
ii 250NB+250NB B/F V/V
iii
NB/100NB+100NB Plug valve
+150 Globe V/V+150NB gate V/V/20NB Flushing line-28 Nos
18 Nos+150NB P/Cyl B/F,-6 Nos +150NB gate Valve-6 Nos
NB/150NB+150 NB Plug V/V+150NB Globe V/V/100NB/20NB Line+20 Nb Globe V/v-26 Nos
BAHP BALP ECO

Scope Avl Erec Scope Avl Erec Scope


1 BAHP 2 1 1 1 BALP 3 2 2 1 Eco P/P 2
2 BAHP Mtr 2 0 0 2 BALP MTR 3 0 0 2 ECO Mtr 2
3 3 3
4 4 4
5 5 5
ECO FAHP FL P/P

Avl Erec Scope Avl Erec Scope Avl Erec


2 2 1 FAHP 3 2 2 1 FL P/P 1 2 2
2 2 2 FAHP 3 2 2 2 FAHP 2 2 2
3 3
4 4
5 5
ECO Hopper Flushing Apparatus
&Piping

Scope Avl Erec Scope Avl

1 ECO Hopper-
Adoptor 6 6 6 1 Flushing
Apparatus 6 6

2 ECO KGV 6 6 6 2 Pipe-150


+Reducer
NB
200Mtr 0

3 ECO EXP Joint 6 6 6 3 Pipe-125NB,


NB
40
0
4 ECO EQ Platfor 6 0 0 4 Gate V/V-40NB 6 0
5 5 Globe V/V-40NB 6 0
6 6 Pipe-250NB 30 Mtr 0
7 Gate V/V-50 NB 1 0
8 Globe V/V-50NB 1 0
9 NRV-50NB 1 0
Piping to BA BA Over Flow Tank
Hopper and Pump

Erec Scope Avl Erec Scope Avl Erec

0 1 Pipe-
250NB 120Mtr 0 0 1 Pipe-
200NB 100 Mtr 0 0

2 Pipe-150
NB 100 Mtr 0 0

3 Tank 1 1 1
4 BA O/F P/P 2 0 0
BA O/F
5 Mtr 2 0 0
6 FC 2 2 0