Bus Duct Installation Checklist

This document is an inspection test record for a submarine cable. It lists 12 inspection items to verify aspects of the cable's construction, installation, identification, cleaning, and documentation. Upon completion, the inspector, verifier, and acceptor must sign off, with space to include any additional comments. The inspection aims to ensure the cable was installed properly according to drawings and specifications.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
361 views1 page

Bus Duct Installation Checklist

This document is an inspection test record for a submarine cable. It lists 12 inspection items to verify aspects of the cable's construction, installation, identification, cleaning, and documentation. Upon completion, the inspector, verifier, and acceptor must sign off, with space to include any additional comments. The inspection aims to ensure the cable was installed properly according to drawings and specifications.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

INSPECTION TEST RECORD (ITR) - A

SUBMARINE CABLE E24-A


Project No.
Project Title
Facilities
INFORMATION
Tag no. System / Sub System no.
Amperes Bus bar Rating
Frequency Location
Manufacturer Ref. Drawing nos.
Type Voltage
INSPECTION / TEST OK N/A P/L No.
Documents required:
a) Bus duct installation/layout drawing
1
b) Bus duct installation details from manufacturer
c) Key single line diagram
Verify to ensure that all construction / installation activities have been
2
completed.
Verify Earthing links/bonding are properly installed and secured in
3
every Bus duct joint connection as per installation drawings.
Verify any mechanical damage to the bus duct sections, joints or end
4
terminations.
Check and confirm bus-duct installations including supports are as per
5
layout drawing and manufacturer instructions.
Bus-duct properly insulated, supported and identified (As per Vendor's
6
Drawing).
Bus bars and connecting links are tightened to vendor’s specified
7
torque values. Mark all the bolts after tightening.
8 Verify and confirm phase identification is correct, warning labels fitted.
9 Check and confirm all related red line markings are completed.
10 Record any defects/shortcomings in the system punch-list.
Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces
11
are clean.
Verify Instruments & its Accessories /Electrical equipment/Panel
12
externally clean.
COMMENT(S) AND ADDITIONAL INFORMATION

COMPLETED BY VERIFIED BY ACCEPTED BY


Designation
Company
Name
Signature
Date