Process Flow Diagram Detailed

The process flow diagram outlines the steps for manufacturing part number MXP1002-01. Raw materials and components are received and inspected before being moved to storage. Work stations are then set up and materials, components, and packaging are transferred to the work stations. Key steps include receiving and verifying raw resin, inspecting components, segregating defective components, returning defective materials, and setting up and stocking the work stations according to specifications and standard operating procedures.

Uploaded by

hugo toledo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
324 views1 page

Process Flow Diagram Detailed

The process flow diagram outlines the steps for manufacturing part number MXP1002-01. Raw materials and components are received and inspected before being moved to storage. Work stations are then set up and materials, components, and packaging are transferred to the work stations. Key steps include receiving and verifying raw resin, inspecting components, segregating defective components, returning defective materials, and setting up and stocking the work stations according to specifications and standard operating procedures.

Uploaded by

hugo toledo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Process Flow Diagram

Supplier: Customer Driven Systems Revision Date: 4/22/2011


Part No: MXP1002-01 Part Description: RH Pad - I/P Upper Trim
Product and Process Characteristics

Part No. Process Description Process Flow Incoming No. Special Characteristic Specification
Step / Diagram Sources of Class.
Operation (Symbol) Variation

Matches Working
MXP1002-01 010 Receive Raw Resin g 12 Molded Part Appearance
Master
MXP1002-01 010 Receive Raw Resin g 100 r Bassell CB247AC
MXP1002-01 012 Receive Components g 6 Visual Inspection No Defects
MXP1002-01 013 Receive Packaging g 6 Visual Inspection No Defects
Material Certification
MXP1002-01 030 Lab Inspection/Resin Verification e 5 r Material Sample Retain
Review
MXP1002-01 030 Lab Inspection/Resin Verification e 46 r Receive Material FMVSS302
MXP1002-01 031 Component Inspection e 6 Visual Inspection No Defects
MXP1002-01 031 Component Inspection e 10 Component Appearance Matches Master
Segregate Defective Received Per Manufacturers Support
MXP1002-01 033
Components b 18
Instructions
SOP-126

MXP1002-01 041 Return Defective b 108 Shipping Documentation Request for Shipper
SOP-130 (Storage and
MXP1002-01 050 Move Accepted to Warehouse b 7 Store Product Until Needed
Inventory Control
MXP1002-01 050 Move Accepted to Warehouse b 102 Inventory Control Rotation of Stock
Quote / Print / E.C
MXP1002-01 061 Print Work Order/Labels b 21 Bill of Materials
Notice
MXP1002-01 071 Set Up Work Station b 11 Process Set Up Matches Instructions
SOP-120 (Production
MXP1002-01 071 Set Up Work Station b 44 Redbook
Process)
Quote / Print / E.C
MXP1002-01 072 Move Material to Work Station g 21 Bill of Materials
Notice
SOP-120 (Production
MXP1002-01 072 Move Material to Work Station g 44 Redbook
Process)
Quote / Print / E.C
MXP1002-01 073 Move Components to Work Station g 21 Bill of Materials
Notice
SOP-120 (Production
MXP1002-01 073 Move Components to Work Station g 44 Redbook
Process)
Quote / Print / E.C
MXP1002-01 074 Move Packaging to Work Station a 21 Bill of Materials
Notice
SOP-120 (Production
MXP1002-01 074 Move Packaging to Work Station a 44 Redbook
Process)