PE-PP-10-1-F3 Rev. 7.0 PLNG SSI Check List Confirmation List
PE-PP-10-1-F3 Rev. 7.0 PLNG SSI Check List Confirmation List
CONFIRMATION
CONFIRMATIONLIST
LISTBETWEEN
BETWEENSHIP-SHORE
SHIP-SHORE
FOR
FOR
__________________
__________________
DATE:
Confirmation List Between Ship-Shore Page
PAGE
10/15/2014 0 PLNG Revision I. General Requirement 2 Appendix
1. Max. Size of Vessel
11/6/2014 1 PLNG Revision A1. Arrangement of Ship's Parallel Body and Fenders
II. Loading Arm / Manifold Arrangement 2
5/12/2015 2 PLNG Revision A2. Layout of Breasting & Mooring Dolphin
III. Fender / Flat Body 2
PLNG Revison:
1. Inclusion of the gangway footprint.
10/12/2015 3 2. Number of seals on the FMC manifold coupler w/pictures. 1. Arrangement A3. Mooring analysis
3. Name of vendor “Tyco” for FO and Electric ESD connection replaced by Seatechnik as
the maker.
2. Maximum Design / Contact Pressure
11/12/2015 4 PLNG Revision: 3. Berthing Energy
1. Mooring system upgrade - installation of double QRH on inner breasting dolphins
(BD2,
BD3). IV. Mooring Arrangement 3
1/18/2016 5 Pin allocation for SSL electric corrected and moved to attachment 6 (page-a6) 1. Mooring Facilities (Hooks / Winches)
5/4/2016 6 Mooring system upgrade - replacement of double hooks on MD1 & MD6 with triple 2. Tension / Strength Limit
hooks - total number of moring hooks is 22.
4/27/2017 7 Attachment 2 (page-a2) & 3 (page-a3) upgrade. 3. Arrangement
V. Gangway / Support 3
1. Position of Gangway
2. Gangway Working Area
II. Loading Arm / Manifold Arr't Loading Arm (unit : mm) Manifold (STBD) (unit : mm) Elevation (unit :m)
LA LA LA LA
1011A 1011C 1012 1011B Arrangement of ship's manifold (unit : mm)
L 400A L 400A V 400A L 400A
V. Gangway / Support
1. Position of Gangway 1. Gangway Position (STBD Side Alongside) 1. Gangway Support
STERN BOW
LOADING
PLATFORM
24,40 m
2. Gangway Working Area 2. Working Area (unit : m) # Detail of gangway support (ship side)
1) Working Range of Gangway 2. Gangway working range and support
High : EL + 22.50m above Datum (above Mean Sea Level) ❶
Low : EL + 6.50 m above Datum (above Mean Sea Level) ❷ Gangway Compatibility (unit : m)
Top of handrail above base line 7
Main deck height above base line 8
Ballast draf 5
Loaded draf 6
Clearance (m)
Normal w/Heave & List
Upper Position 9
Low Position 10
9=1-(7-5+3) 10 = ( 7 - 6 + 4 ) - 2
3) Tide Level
High : No Tides 0 ❸
Low : No Tides 0 ❹
4) Heave & List : ±0.000 m
Confirmation List Between Ship-Shore Page
2. Loading Arm Working Range 2. Loading Arm Working Range 2. Loading Arm Compatibility
(unit : m)
Item (m) Manifold Height above base line 11
Working Range of High ① 27.400 Ballast draf 12
Loading Arm above Datum Low ② 12.300 Loaded draf 13
Tide Level High ③ No Tides Clearance (m)
Low ④ No Tides Normal w/Heave & List
Heave & List MSL High & Low ±0.000 Upper Position 14
Loading Arm Length Inboard Arm ⑤ 11.278 Low Position 15
Outboard Arm ⑥ 11.582 14 = 1 - (11 - 12 + 3) 15 = (11 - 13 + 4) -2
Distance Max ⑦ 4.500
⑧ 2,500
⑨ 4,800
Above Datum ⑩ 3.000
Datum (for heights) = Mean Sea Level (MSL). For further details refer to appendix 6.
Arm working range = 15,100 m (related to MSL)
Confirmation List Between Ship-Shore Page
NOT AVAILABLE
(1) System (1)
(2) Manufacture (2)
(3) Connector Type (3)
(4) Connection Box Position (4)
3. Radio System 3. Radio System 3. Radio System Other Available Communications (Terminal)
(3)
(4)
(2)
(2) Connector Type (2)
4) Flow Condition at Inlet 4) Suction pressure 0.10 bar, temp. Around -130C
XV. Limitation of Wind Speed - Wind Speed : Refer to port regulations & PLNG Marine Operations Manua Weather Criteria by OCIMF
and Current Speed :
- Speed of Approach for berthing 0.05 m/sec 1. Wind Speed : 60 Knots
2. Current Speed
- 3 Knots (from 0°or 180°)
- 2 Knots (from 0°or 170°)
- 0.75 Knots (90°)
4) Type 4) Laser
Confirmation List Between Ship-Shore Page
All heights are reffered to Mean Sea Level and Depths to Lowest LOA: Length over all
Astronomical Tide. In case of Świnoujscie and in general Southern Baltic, LBP: Length between perpendiculars
these levels are practicaly the same. Tides are few cm only. MD: Mooring dolphin
BD: Breasting dolphin
QRH: Quick release hook
H: Head line
B: Bresting line
SP: Spring line
QCDC: Quick connect quick disconnect couplers
Typical 16 lines mooring arrangement for "Conventional" LNGC (2,2,2,2 Fwd & Aft)
Typical 18 lines mooring arrangement for "Q-Flex" LNGC (3,2,2,2 Fwd & Aft)
Appendix 3. Mooring Analysis
Vessel Fairlead and mooring winch data in metres (for Optimoor input)
Mooring lead 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
location
Midships to
fairleads
Centre line to
fairlead
Height relative to
maindeck
Winch distance
from fairlead
Terminal mooring hook and fenders data in metres (for Optimoor input)
Mooring /
Breasting dolphin MD1 MD2 MD3 BD1 BD2 BD3 BD4 MD4 MD5 MD6
Number of Hooks
3 2 2 2 2 2 2 2 2 3
SWL of Hooks
(tonnes) 100 100 100 100 100 100 100 100 100 100
Distance from
Vapour Line (m) -200.0 -150.0 -100.0 -60.0 -37.0 37.0 60.0 100.0 150.0 200.0
Distance from
Berthing Line (m) 27.1 47.2 47.2 4.7 4.7 4.7 4.7 47.2 47.2 27.1
Height above
datum (m) 3.7 3.7 3.7 5.7 5.7 5.7 5.7 3.7 3.7 3.7
Height above
datum (m) 5.7 5.7 5.7 5.7