Transformer Testing Procedure: Specifications

The document outlines procedures for testing the specifications, insulation resistance, magnetic balance, magnetizing current, turn ratio, and vector group of a transformer. It provides step-by-step instructions for connecting equipment and taking voltage and current readings at various transformer tap positions and circuit configurations to evaluate transformer performance based on expected results.

Uploaded by

prashant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Transformer Testing Procedure: Specifications

The document outlines procedures for testing the specifications, insulation resistance, magnetic balance, magnetizing current, turn ratio, and vector group of a transformer. It provides step-by-step instructions for connecting equipment and taking voltage and current readings at various transformer tap positions and circuit configurations to evaluate transformer performance based on expected results.

Uploaded by

prashant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TRANSFORMER TESTING PROCEDURE

Specifications -

IR Test -
Step-1 Set 5000V on Megger,
Step-2 Connect Megger Red Lead to HT R-Phase and and Black Lead to ground, take reading on
Megger. Value will be >1000G-Ohm
Step-3 Connect Megger Red Lead to LT R-Phase and and Black Lead to ground, take reading on
Megger Value will be >1-G-Ohm
Step-4 Connect Megger Red Lead to HT R-Phase and and Black Lead to LT R-Phase, take reading on
Megger Value will >1000be G-Ohm
#worst Acceptable Value: (11000+1000) =12M-Ohm Note: Discharge the Terminals after taking each
reading.

Magnetic Balance - HV Side


Step-1 Fix transformer on Main tap (Say Tap 4 in our case)
Step-2 Take LT supply 415, Connect R-Y-B terminals on HT bushings. LV Bushing will remain open.
Take Voltage reading on following manner.
Step-3 ON R-Y poles of MCB, Take reading on R-Y, Y-B, B-R
Step-4 ON Y-B poles of MCB, Take reading on R-Y, Y-B, B-R
Step-5 ON B-R poles of MCB, Take reading on R-Y, Y-B, B-R
# Result Hint : RY=YB+BR

Magnetising Current-
Step-1 Take LT supply 415, Connect R-Y-B terminals on HT bushings. LV Bushing will remains open.
Take voltage reading R-Y, Y-B, B-R
Step-2 Set tap at 1 Position take Current reading of each phase R,Y and B. it will be on milliamps
Step-3 Set tap at 4 Position take Current reading of each phase R,Y and B. it will be on milliamps
Step-4 Set tap at 7 Position take Current reading of each phase R,Y and B. it will be on milliamps
Turn ratio or Voltage Ratio
Step-1 Take LT supply 415, Connect R-Y-B terminals on HT bushings. take voltage reading RY, YB, BR
Step-2 Set Tap at 1 Position - Take r-y, y-b, b-r voltage reading
Step-3 Set Tap at 2 Position - Take r-y, y-b, b-r voltage reading
Step-4 Set Tap at 3 Position - Take r-y, y-b, b-r voltage reading
Step-5 Set Tap at 4 Position - Take r-y, y-b, b-r voltage reading
Step-6 Set Tap at 5 Position - Take r-y, y-b, b-r voltage reading
Step-7 Set Tap at 6 Position - Take r-y, y-b, b-r voltage reading
Step-8 Set Tap at 7 Position - Take r-y, y-b, b-r voltage reading
#Result Hint - On Principal Tape- Ratio HT/LT shall be same as turn ratio

Vector Group: -
Step-1 Take LT supply 415, Connect R-Y-B terminals on HT bushings. And Short R-r through a cable.
Step-2 Take Voltage reading of following manner
R-Y, Y-B, B-R
R-r=0, R-y, R-b
Y-r, Y-y, Y--b
B-r, B-y, Bb
r-y, y-b, b-r

Remarks: -
R, Y, B are HT side terminals
r, y, b are LT side terminals

Readings
See next page