92.5 MLD Design and Drawing List
92.5 MLD Design and Drawing List
JOB
No
TPL - 340062 Discipline : Master Drawing & Document list of 92.5 MLD STP Remark
2 UMC/TPL/STP- BEP- PDC/01 Layout for Sewage Treatment Plant 92.5 MLD
1 TPL - 340062 - UJN - STP - GA- SBR 1001 General arrangement drawings for SBR at 92.5 MLD STP
7 TPL - 340062 - UJN - STP - GA - PTU 1007 General arrangement drawings for PTU at 92.5 MLD STP
C Civil Drawings
TPL - 340062 - UJN - STP - CVL - CCT -STR DC - Chlorine contact tank - Structural design calculation at STP
2002 A 92.5 MLD
TPL - 340062 - UJN - STP - CVL - CCT -NU - 2002 Chlorine contact tank - Numeration drawing at STP 92.5
2
B MLD
TPL - 340062 - UJN - STP - CVL - CCT -RCC - 2002 Chlorine contact tank - Reinforcement drawing at STP 92.5
C MLD
TPL - 340062 - UJN - STP - CVL - TFS - STR DC - Thickener feed sump - Structural design calculation at STP
2003A 92.5 MLD
TPL - 340062 - UJN - STP - CVL - TFS - RCC - 2003 Thickener feed sump - Reinforcement drawing at STP 92.5
C MLD
TPL - 340062 - UJN - STP - CVL -C &O S - STR DC Centrate & Overflow sump - Structural design calculation
- 2004 A at STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - C &O S - NU - Centrate & Overflow sump - Numeration drawing at STP
4
2004 B 92.5 MLD
TPL - 340062 - UJN - STP - CVL - C &O S - RCC - Centrate & Overflow sump - Reinforcement drawing at
2004 C STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - CFS - STR DC - Centrifuge feed Sump and Pump house - Structural design
2005 A calculation at STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - CFS - NU - 2005 Centrifuge feed Sump and Pump house - Numeration
5
B drawing at STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL -CFS - RCC - 2005 Centrifuge feed Sump and Pump house - Reinforcement
C drawing at STP 92.5 MLD
6 TPL - 340062 - UJN - STP - CVL - Thk - NU - 2006 B Thickener - Numeration drawing at STP 92.5 MLD
7
7 TPL - 340062 - UJN - STP - CVL -PTU -NU - 2007 B PTU - Numeration drawing at STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - Admin - STR DC - Admin block - Structural design calculation at STP 92.5
2008A MLD
9 TPL - 340062 - UJN - STP - CVL - SB - NU - 2009 B Security - Numeration drawing at STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - WS - STR DC - Workshop - Structural design calculation at STP 92.5 MLD
2010 A
TPL - 340062 - UJN - STP - CVL - C& TR - STR DC Chlorinator & Tonner room - Structural design calculation
- 2011 A at STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - CR & TR - NU - Chlorinator & Tonner room - Numeration drawing at
11
1011 B STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - CR & TR - RCC - Chlorinator & Tonner room - Reinforcement drawing at
2011 C STP 92.5 MLD
TPL - 340062 - UJN - STP - CVL - BW - STR DC - Boundary wall - Structural design calculation at STP 92.5
2012 A MLD
TPL - 340062 - UJN - STP - CVL - BW - RCC - 2012 Boundary wall - Reinforcement drawing at STP 92.5
C MLD
TPL - 340062 - UJN - STP - CVL -ABR - STR DC - Air blower Room - Structural design calculation at STP
2013A 92.5 MLD
TPL - 340062 - UJN - STP - CVL - ABR - RCC - Air blower Room - Reinforcement drawing at STP 92.5
2013 C MLD
TPL - 340062 - UJN - STP - CVL -CFB - STR DC - Centrifuge Building - Structural design calculation at STP
2014 A 92.5 MLD
TPL - 340062 - UJN - STP - CVL -CFB - NU - 2014 Centrifuge Building - Numeration drawing at STP 92.5
14
B MLD
TPL - 340062 - UJN - STP - CVL -CFB - RCC - Centrifuge Building - Reinforcement drawing at STP 92.5
2014 C MLD
D Mechanical
TPL - 340062 - UJN - STP - MECH - AB - GA, DS GAD for Selector zone Air Grid , Decanter connecting piece
7
and QAP - 3007 and Air Diffuser in C- tech basin
E Electrical
1 TPL - 340062 - UJN - STP - EL - EL - 4001 Electrical Load list for STP 92.5 MLD
2 TPL - 340062 - UJN - STP - EL -SLD - 4002 Single line diagram for STP 92.5 MLD
3 TPL - 340062 - UJN - STP - EL - CSC - 4003 Capacitor sizing calculation for STP 92.5 MLD
4 TPL - 340062 - UJN - STP - EL - EDC - 4004 Earthing design calculation for STP 92.5 MLD
5 TPL - 340062 - UJN - STP - EL - LDC - 4005 Lightning design calculation for STP 92.5 MLD
6 TPL - 340062 - UJN - STP - EL - LSC - 4006 Cable sizing calculation for STP 92.5 MLD
8 TPL - 340062 - UJN - STP - EL - OIL - 4008 Over all Indoor lighting layout for STP 92.5 MLD
9 TPL - 340062 - UJN - STP - EL - OOL - 4009 Over all Outdoor lighting layout for STP 92.5 MLD
10 TPL - 340062 - UJN - STP - EL - OEL - 4010 Over all Earthing layout for STP 92.5 MLD
11 TPL - 340062 - UJN - STP - EL - PC & CC - 4011 Over all Lightning layout for STP 92.5 MLD
12 TPL - 340062 - UJN - STP - EL - OLL - 4012 Power cable and control cable schedule for STP 92.5 MLD
13 TPL - 340062 - UJN - STP - EL - ODC - 4013 Lighting design calculations for STP 92.5 MLD
14 TPL - 340062 - UJN - STP - EL - DSC - 4014 Data sheet & GA APFC capacitor panel STP
15 TPL - 340062 - UJN - STP - EL - LTC - 4015 Data sheet LT Cable STP
16 TPL - 340062 - UJN - STP - EL - LTP - 4016 Data sheet & GA LT Panel STP
F Instrumentation
2 TPL - 340062 - UJN - STP - INS - PLC - 5002 PLC I/O List
3 TPL - 340062 - UJN - STP - INS - ICS - 5003 Cable Schedule & Interconnection cable Schedule.
4 TPL - 340062 - UJN - STP - INS - PLC CRL - 5004 PLC Control room Layout
5 TPL - 340062 - UJN - STP - INS - CRL - 5005 Cable Routing Layout
Vendor Documents
6 TPL - 340062 - UJN - STP - INS - IDS - 5006 Field Instruments Data Sheet
7 TPL - 340062 - UJN - STP - INS-PGA - 5007 Panel GA & PLC System Architecture Diagram