0% found this document useful (0 votes)
252 views4 pages

B+G+20 Residential Building, Kolkata Plumbing

The document provides specifications for the plumbing system of a residential building's swimming pool in Kolkata, India. It details the sizing calculations for the balancing tank (6.34 m3), filters (2 filters totalling 36.6 ft2), backwash tank (7.57 m3), and chlorine dosage (12.5 lbs per day). Pipe sizing calculations determine the suction and delivery pipes should each be 50 mm diameter.

Uploaded by

vignesh ms
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
252 views4 pages

B+G+20 Residential Building, Kolkata Plumbing

The document provides specifications for the plumbing system of a residential building's swimming pool in Kolkata, India. It details the sizing calculations for the balancing tank (6.34 m3), filters (2 filters totalling 36.6 ft2), backwash tank (7.57 m3), and chlorine dosage (12.5 lbs per day). Pipe sizing calculations determine the suction and delivery pipes should each be 50 mm diameter.

Uploaded by

vignesh ms
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

I. SWIMMING POOL

1. Balancing Tank Sizing

Area:

Swimming Pool = 102.1 m2

Volume:

= 102.1m2 x 1.5m (Approximately. Ht 1.5m)


= 153.15m3

Bathing Loads:

< 1.5 m deep : 1.394 m2/person


> 1.5 m deep : 1.819 m2/person

Total number of bathers = 75 Persons

Amount of Displaced Water = Wave Displacement + Bather Displacement

a. Wave Displacement = Pool Area x 0.02 m


= 102.1 x 0.02 m
= 2.04 m3

b. Bather Displacement = No. of bathers x 0.05 m3/p


= 75 x 0.05 m3/p
= 3.75 m3

Total Required Volume = 2.04 + 3.75


= 5.79 m3
+ 10% = 6.34 m3

Balancing Tank = (3.0 x 1.5 x 1.5 Depth)

2. Filter Calculation

Total Volume = 153.15 m3

Turnover Rates:
Pool = 6 hrs.

153.15 m3
Total Q =
6 hr
= 25.53 m3/hr
= 425.5 L/min
Say 425.5 L/min (112.4 GPM)

1 of 4
B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

Using 4-pump systems


(3-nos. pump duty; 1-no. standby)

Filter Pump = 141.83 L/min (37.47 GPM)


≈ 8.51 m3/h

Compute for TDH

1.Min.Residual - 15 psi. 34.65 ft.


2.Diff.Pressure - 20 psi. 46.20 ft.
3.Static Head - 4m 13.12 ft.
4.Head Loss due to friction -

4.1 Length of pipe 100m. - 328 ft.

4.2 Fittings – Ø 100 pipe


Quantity Head Loss Sub-Total
(ft)
Elbows 8 14 112
Tee 12 21 252
Gate Valve 7 2.7 18.9
Check Valve 3 22 66
448.90 ft

Friction Head loss Rate = 42.28 ft/1000 ft = 0.04

Total losses at piping = 328 + 448.90 = 776.90 ft

Head loss due to friction = 776.90 x 0.04 = 31.08 ft

TDH = 125.05 ft ≈ 54.13 psi


3.73 bar

Hp 56.2 gpm (125.05 ft)


=
3960 x 0.55

= 7027.81
2,178.00

Hp = 3.23

Based on filter capacity of 37.07 m3/hr/m2

540 gpm
=
158.849 gpm/m2
= 3.40m2 (36.60ft2)

2 of 4
B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

Based on hi-rate filter having an area of 43.0 ft 2


36.60ft2
=
43.0
= 0.851ft2

say = 2.0 nos. 1 filter + 1 spare

3. Back Wash Tank

Vol. = Backwash rate in gpm/ft2 x area of filter in ft2 5 min.


= (20.0 gpm/ft2) (20.0ft2) (5min.)
= 2000 gals
≈ 7.57 m3 (2.5 x 2.1 x 1.5m D)

4. Chlorination

1 lb. of chlorine per 10,000 gals of pool water every 8 hours

Volume of Pool = 153.15 m3

Chlorination ≈ 40457.95gals.

40457.95gals
Chlorination ≈
10,000 gals/1 lb. Chlorine

= 4.05 lbs/8 hrs.


= 0.51 lbs/hrs x 24 hrs/day
= 12.24 lbs/day
Say = 12.5 lbs/day

Assume 5% strength of solution

Chemical
5 = x 100
(Water + Chemical)

12.5 lbs
5 = x 100
(Water + 12.5 lbs)

Water = 237.5 lbs.

237.5 lbs.
Vol. Of H2O =
62.4 lbs/ft3

= 3.81 ft3

3 of 4
B+G+20 RESIDENTIAL BUILDING, KOLKATA

PLUMBING

5. Pipe Sizing

Velocity = 4 m/s (max)


Turnover = 6 hrs. (main pool)
25.53 m3/hr.

Required cross sec. Area of suction piping

a. Suction Pipe b. Delivery Pipe

Required cross sec. Area of suction piping

Q = AV 25.53 m3/hr
Area =
25.53 m3/hr = A (4 M/s) 4 M/s x 3, 600
0.00709 m3/s = A (4 M/s) Area = 0.00177 m2
A = 0.00177 m2

Dia,
4 x 0.00177 4 x 0.00177
D = D =
3.1416 3.1416

D = 0.0475 m D = 0.0475 m
D = 47.5 mm = 47.5 mm
Say = 50 mm Say = 50 mm