0% found this document useful (0 votes)
70 views

Statement of Competency - Signal Project Engineer

This document certifies that an individual named has been assessed and certified as competent in various signal engineering skills at different proficiency levels, including technical documentation, design, project management, and equipment classes. The individual's competencies have been assessed according to the organization's standards and procedures by a qualified assessor and subject matter expert. The certificate verifies the individual's abilities and is valid when working for the certifying organization or its partners.

Uploaded by

fadli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Statement of Competency - Signal Project Engineer

This document certifies that an individual named has been assessed and certified as competent in various signal engineering skills at different proficiency levels, including technical documentation, design, project management, and equipment classes. The individual's competencies have been assessed according to the organization's standards and procedures by a qualified assessor and subject matter expert. The certificate verifies the individual's abilities and is valid when working for the certifying organization or its partners.

Uploaded by

fadli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

STATEMENT OF COMPETENCY - SIGNAL PROJECT ENGINEER

L4-CHE-FOR-078 Version: 1 Effective From: 1st February 2018

Statement of Competency
This is to verify that INSERT INDIVIDUAL'S NAME of INSERT COMPANY NAME

Has been assessed and certified in the following competencies required of a Signal Project Engineer

Technical Document & Investigations Interlocking Systems


Signal Standards 0 Signalling Drawings Relays (Unit Lever / Freewired) 0
Risk Assessments 0 Signal Arrangement Plans 0 Geographical Relays 0
Service Schedules 0 Bonding & Signal Apparatus Plans 0 SSI 0
Technical Maintenance Plans 0 Impedance & Cross Bonding Plans 0 SmartLock 0
Functional Specifications 0 Control Tables 0 WestLock 0
Incident Investigations 0 Cable Running Plans 0 VHLC 0
Safety Investigations 0 Contact Analysis Sheets 0 WestRace 0
Track/Bonding Plans 0 Equipment Box Layouts 0
Design Documentation 0 Control & Indication Diagram (ie Panel Drawings) 0 Proficiency Level
VRIOGS - Signal Construction Induction 0 Mechanical Drawings (ie Signal / Point Layouts) 0 LEVEL 0 – No certified knowledge on the subject
Commissioning Work Package Documentation ie CTC Forms Equipment and Generator Room Layouts 0 LEVEL 1 – Supervised Practitioner
0
Signalling Diagram 0 LEVEL 2 – Practitioner
Signal Sighting Forms 0
Level Crossing Focusing Diagram / Layout 0
Project Management Train Control System Block Diagram 0
Provide evidence of interpreting / scoping project requirements. 0 Locking Diagrams & Tables 0
Provide evidence of management of timing /progress of a project 0 Equipment Classes
Provide evidence of management of cost/budget for a project. 0 Signal Power Distribution Supply System 0 This certificate is only valid while working for the nominated Organisation
and contracted to or employed by MTM or Alliance Partner. Conditions
Provide evidence of when you have managed project quality aspects 0 Controlled & Automatic Signals 0 apply for transferring the Competency to work with a different
Provide evidence of manament of project resources/staffing 0 Train Protection – TPWS 0 organisation
Provide evidence of management of communication in a Project 0 Train Protection – Train stop 0
Provide evidence of when you have managed project risk. 0 Level Crossing Road Protection 0
Provide evidence when you have managed contractual issues 0 Level Crossing Pedestrian Crossing 0 ###
Provide evidence of integration of functions of project management 0 Traffic Light Coordination Arrangements 0
Track Circuits – Audio Frequency (Jointless) 0 This Certificate is issued under the Rail Safety Legislation requirements
of Victoria.
ASSESSOR CERTIFICATION. Track Circuits – AC 0
Track Circuits – HVI, DC 0
The Assessor hereby Certifies that details on this Certificate of Competency have been assessed Track Circuits – Non-vital IPI, PSO 0
in accordance with the MTM & VRIOGS Standards, Procedures and Instructions for Assessment; Points – Off Rail (M23A / LZW / GRS) 0
that the applicant has demonstrated that he/she is able to perform the tasks covered by the
Competency; and that the supporting documentation has been received and recorded. MTM relies Points – On Rail (Clamp / Claw Lock) 0
on this certification as demonstrating competency. Axle Counters 0
Telemetry and Interface Processors 0
Siding Gates and Controls 0
Mechanical Signalling Equipment 0
Mechanical Interlocking Frames 0

Assessed by: Engaged SME Applicant's Acceptance:


Assessor's Signature: SME's Signature: Applicant's Signature:

Assessor's Name: SME's Name: Applicant's Name:


Date: Date: Date:

Approving Manager: Signals Competency Signalling Engineering Manager Approval Date: 01/02/2018 Next Review Date:01/02/2021
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 1
STATEMENT OF COMPETENCY - SIGNAL PROJECT MANAGER

L4-CHE-FOR-077 Version: 1 Effective From: 1st February 2018

Statement of Competency
This is to verify that INSERT INDIVIDUAL'S NAME of INSERT COMPANY NAME

Has been assessed and certified in the following competencies required of a Signal Project Manager

Technical Document & Investigations Interlocking Systems


Signal Standards 0 Signalling Drawings Relays (Unit Lever / Freewired) 0
Risk Assessments 0 Signal Arrangement Plans 0 Geographical Relays 0
Service Schedules 0 Bonding & Signal Apparatus Plans 0 SSI 0
Technical Maintenance Plans 0 Impedance & Cross Bonding Plans 0 SmartLock 0
Functional Specifications 0 Control Tables 0 WestLock 0
Incident Investigations 0 Cable Running Plans 0 VHLC 0
Safety Investigations 0 Contact Analysis Sheets 0 WestRace 0
Track/Bonding Plans 0 Equipment Box Layouts 0
Design Documentation 0 Control & Indication Diagram (ie Panel Drawings) 0 Proficiency Level
VRIOGS - Signal Construction Induction 0 Mechanical Drawings (ie Signal / Point Layouts) 0 LEVEL 0 – No certified knowledge on the subject
Commissioning Work Package Documentation ie CTC Forms Equipment and Generator Room Layouts 0 LEVEL 1 – Supervised Practitioner
0
Signalling Diagram 0 LEVEL 2 – Practitioner
Signal Sighting Forms 0
Level Crossing Focusing Diagram / Layout 0
Project Management Train Control System Block Diagram 0
Provide evidence of interpreting / scoping project requirements. 0 Locking Diagrams & Tables 0
Provide evidence of management of timing /progress of a project 0 Equipment Classes
Provide evidence of management of cost/budget for a project. 0 Signal Power Distribution Supply System 0 This certificate is only valid while working for the nominated Organisation
and contracted to or employed by MTM or Alliance Partner. Conditions
Provide evidence of when you have managed project quality aspects 0 Controlled & Automatic Signals 0 apply for transferring the Competency to work with a different
Provide evidence of manament of project resources/staffing 0 Train Protection – TPWS 0 organisation
Provide evidence of management of communication in a Project 0 Train Protection – Train stop 0
Provide evidence of when you have managed project risk. 0 Level Crossing Road Protection 0
Provide evidence when you have managed contractual issues 0 Level Crossing Pedestrian Crossing 0 ###
Provide evidence of integration of functions of project management 0 Traffic Light Coordination Arrangements 0
Track Circuits – Audio Frequency (Jointless) 0 This Certificate is issued under the Rail Safety Legislation requirements
of Victoria.
ASSESSOR CERTIFICATION. Track Circuits – AC 0
The Assessor hereby Certifies that details on this Certificate of Competency have been Track Circuits – HVI, DC 0
assessed in accordance with the MTM & VRIOGS Standards, Procedures and Instructions Track Circuits – Non-vital IPI, PSO 0
for Assessment; that the applicant has demonstrated that he/she is able to perform the tasks
covered by the Competency; and that the supporting documentation has been received and Points – Off Rail (M23A / LZW / GRS) 0
recorded. MTM relies on this certification as demonstrating competency. Points – On Rail (Clamp / Claw Lock) 0
Axle Counters 0
Telemetry and Interface Processors 0
Siding Gates and Controls 0
Mechanical Signalling Equipment 0
Mechanical Interlocking Frames 0

Assessed by: Engaged SME Applicant's Acceptance:


Assessor's Signature: SME's Signature: Applicant's Signature:

Assessor's Name: SME's Name: Applicant's Name:


Date: Date: Date:

Approving Manager: Signals Engineering Manager Approval Date: 01/02/2018 Next Review Date:01/02/2021
PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 1

You might also like