100% found this document useful (1 vote)
3K views1 page

Hydraulic Valve System Guide

The document describes the starting sequence of a star/delta motor. It takes approximately 1 second to start in star configuration before switching to delta after no more than 1.5 seconds. The exchange between configurations takes less than 0.02 seconds. It also shows the electrical connections and components involved in the motor starting process.

Uploaded by

Oscar Cuellar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views1 page

Hydraulic Valve System Guide

The document describes the starting sequence of a star/delta motor. It takes approximately 1 second to start in star configuration before switching to delta after no more than 1.5 seconds. The exchange between configurations takes less than 0.02 seconds. It also shows the electrical connections and components involved in the motor starting process.

Uploaded by

Oscar Cuellar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

star/delta starting delay ≅ 1s

L
FLOOR A 8 A 8
D
E
5 5 3

exchange ≤ 0,02s
VML 3

DOWNWARD
C 9 9 VML 2

UPWARD
TO CYLINDER
VRFP 2 TO CYLINDER
VRFP
4

star ≤ 1,5s
VP 4 6 1
G VMD VMP
VMD VMP
PAM
EN 81
1
PAM ML
I
H
FLOOR VSMA 10
MAN
7

MOTOR
VML
VMD
VML

A 7 MAN

VMP
MOTOR
6 ML
ENERGIZED 10

NOT ENERGIZED direct


MOTOR - STAR PHASE starting Valve 2” Valve 1”¼ - 1”½

VALVE BLOCK 3010EN


A 5 G
VRFP VMD
VML VSMA VC 3006/B
VP 9
4
C 7
B
VS
3 ML
K
1
SILENCER G
VRP VSMA
E 2
F
VB VR 8 ML
for direct acting
VRF jacks (1:1) F
VR2
PAM800

E A
6
VMP
10 ISP
VRa VR1
auxiliary levelling

4
device

Ma Pmax Pmin OLD C


M MAN
B
star/delta starting
SCC starting

K one way valve VS pilot valve for VB


ISP inspection gauge fitting VSMA manual lowering valve
MAN manometer 1 pressure relief adjustment
ML manual lowering button 2 levelling speed adjustment
OLD full load pressure limit switch (optional) (D-E upward, H-I downward)
Pmax maximum pressure limit switch (optional) 3 deceleration adjustment
Pmin minimum pressure limit switch (optional) (C-D upward, G-H downward)
PAM hand pump (optional) 4 up acceleration adjustment
VB pressure relief valve 5 shut off valve for rupture valve test
VMD down solenoid valve 6 manometer shut-off valve
VML levelling solenoid valve 7 ram pressure adjustment
VMP starting solenoid valve (only for indirect acting jacks)
(star/delta - SCC starting) 8 full speed adjustment
VP pressure valve 9 down speed compensation adjustment
VR ceck valve 10 pressure relief valve adjustment (hand pump)
VR1 non return valve (inlet) C hoistway proximity switch (upward)
VR2 non return valve (outlet) G hoistway proximity switch (downward)
VRF flow regulation valve E motor switching-off
VRFP auxiliary flow regulation valve I VMD switching-off
VRP main non-return valve

VALVE BLOCK “3010EN” data sheet :04.007/B 1/1


hydraulic circuit and working diagram date : 24/03/2003

You might also like