Roles Ansn Responsibilities of QC Engineer/Manager Responsibilities

The document outlines the roles and responsibilities of a QC engineer/manager. Key responsibilities include: 1) Implementing and maintaining QA/QC inspections and systems according to ISO standards. 2) Preparing quality plans and getting them approved. 3) Coordinating documentation of inspections and material testing. 4) Promoting a culture of quality.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
214 views4 pages

Roles Ansn Responsibilities of QC Engineer/Manager Responsibilities

The document outlines the roles and responsibilities of a QC engineer/manager. Key responsibilities include: 1) Implementing and maintaining QA/QC inspections and systems according to ISO standards. 2) Preparing quality plans and getting them approved. 3) Coordinating documentation of inspections and material testing. 4) Promoting a culture of quality.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ROLES ANSN RESPONSIBILITIES OF QC ENGINEER/MANAGER

Responsibilities:
QA & QC management and strategic implementation in accordance with ISO 9000 & ISO 9001 with in
construction projects:-
• implementing and maintaining the QA/QC inspections and systems, on all processes and materials.
• Preparing Quality Plan for the project in accordance with Aramco guidelines and ISO 9001 ;2008
requirements and Got it approved from Aramco. Scope of QAP includes Quality objectives, Document
control, Identification & Traceability, Management commitments ,ITP, QA & QC Procedures
• Compile and ensure practical effective downstream implementation of the Project Quality
• co-ordinate all documentation on inspections and activities and conduct material inspection on incoming
material specifications
• Promote quality achievement and a culture of quality
• Preparing Inspection and test Plan for Civil ,Piping and Electrical activities
• Preparing Method statement for Major activities and submitting to client for approval
• Working also in capacity of Management representative apprising management about Quality
Management system in company

Specialties: A performance-driven Civil Engineering professional with integrity, proficiency in inspection


and construction materials testing, excellent knowledge of International Standards, 20 years quality
assurance experience in prestigious infrastructure projects metro rail , highways, bridges flyover ,building
and civil construction industry; seeking an Senior level assignment .

QA/QC Manager
Bin Ajinah Group
December 2008 – September 2012 (3 years 10 months)

Civil (Approved by Saudi ARAMCO)

220 million SAR Construction project of Saudi Aramco


Scope of Project includes Earth Work , 4 Major Bridges, Fly over & Inter Changes Merging
with Main highway,

Responsibilities:
QA & QC management and strategic implementation in accordance with ISO 9000 & ISO
9001 with in construction projects:-
implementing and maintaining the QA/QC inspections and systems, on all processes and
materials.
Preparing Quality Plan for the project in accordance with Aramco guidelines and ISO 9001 ;
2008 requirements and Got it approved from Aramco. Scope of QAP includes Quality
objectives, Document control, Identification & Traceability, Management commitments ,ITP,
QA & QC Procedures
Compile and ensure practical effective downstream implementation of the Project Quality
co-ordinate all documentation on inspections and activities and conduct material inspection
on incoming material specifications

Working also in capacity of Management representative running the QA/QC section,


overseeing a team of 15 including QC Supervisor and QC inspector of all discipline civil.
Electrical, Mechanical,HVAC & Welding,NDT.
Delegating authorities to QC Inspector and QA/QC supervisor for implementation of quality
as per Aramco standards
Coordinating with project manager & construction manager on quality related issue
Conducting system Audit on subcontractor and inter department functions as per ISO 9000
Adopting Proactive approach when it comes to site reviews, and highlighting issues promptly
during site meetings
Coordinating with clients on Daily,
Continual Improvement through corrective and preventive action to have Project Quality
Index on Max Grade
Take necessary action to close the quality related issues at site and propose suitable solution
Monitoring investigation, root cause analysis and closure of Conducting internal Audits
Continual improvement through analysis of and audits
Prepared training modules

Head Quality Assurance


ACC Concrete Ltd
August 2007 – November 2008 (1 year 4 months)

Ready Mix Concrete process management and Quality assurance:


As head of quality assurance, utilize 20 years exhaustive experience in the quality assurance
in the construction industry and develop and establish business operating and quality
assurance systems.
National Head of Quality assurance Responsible for assuring quality at All ACC RMX
Plants(presently 40 ) through coordinating with area Heads , Plant heads and Area quality
Heads
Monitoring the product performance, production performance and system implementation of
all the plants from HO through command QC software having sap interface
Develop various levels of documentation such as standard operating procedures and work
instructions for various processes, formats, inspection and test plan etc.
Impart training to the general staff, newly inducted QC staff (QC in charges, QC officers and
Lab officers) for enhancing awareness of quality systems.
Select and develop a team of internal auditors by providing training to them.
Plan and implement the quality management system including development of Quality
manual, organization structure with responsibilities and authorities.
Conduct internal Quality audits of Ready-mix concrete plant
Detect and take corrective/preventive action for avoiding recurrence of the non
conformities.
Conduct operational review and management review meetings and present monthly quality
reports, audit reports and status and actions required for upgrading the quality management
system.
Rolling out ITP (Inspection Test Plan) & QA/QC Procedures,
Issue DR (Discrepancy reports) and NCR (Non conformity report) to the production
department for improper work.
Prepare monthly quality control report, including calibration of lab equipments and submit to
the Managing Director.
Human Resource development:
Develop team spirit amongst the Quality Assurance staff of 20, develop their skills and
competencies through training and

Project Quality Management


DUBAI Metro project
June 2006 – June 2007 (1 year 1 month)

As material engineer, ensured strict compliance of construction materials and procedures to


the project quality specifications.
Developed a competent Quality Assurance team and reviewed, suggested modifications for
non conforming products and approved various materials, received from the contractor to be
used in Dubai Metro project.
Checked quality of raw material at source and site as per the decided specifications and the
test/inspection frequency and criteria.
Reviewed and accepted manufacturer's test certificates for bought out items and material
like cement, steel, construction chemicals.
Organized quality management meeting with client and contractor and conducting quality
audit jointly with contractor for various jobs e.g. batching plants, pre cast yard etc.
Conducted regular Quality Audits, Inspection of facilities and capabilities of contractors and
subcontractor prior to approval of suppliers and during the course of supply.
Regularly reported the status of the quality system to the resident engineer.
Human Resources development:
Managed a Quality control team of 5 material inspectors and site Inspectors
Imparted training to them for improving their skills and achieved the performance targets
through their motivation.
Major achievement:
In a target oriented environment, consistently achieved and never missed the targets

Responsibilities:
Supervised and controlled quality of the segmental, Cast in situ construction of Elevated
corridor at major crossings on Shahdara - Rithala of Rail corridor
organise Pre Dispatch inspection tests of Prestressing material Like Sheathings, Tendon
Anchorage assembly and Load transfer tests and anchorage efficiency tests as per FIP
recommendation.
Inspected and Tested POT/PTFE, Electromeric Bearings as per IS /IRC specifications.
Organise out exhaustive inspection of raw materials. Tested Pot bearing and NDT Ultrasonic
testing and DPT to detect flaws in casting components.
Reviewing commenting and approving the different construction material including Mix
design of concrete and asphalt
Reviewing and Approving Project Quality Plan, method statements, procedures and work
instructions submitted by contractor.
Conducting audits to verify the effectiveness of quality system on the project and ensure
that work is being carried out as per approved quality documents
Developed/ upgraded quality control systems in project and construction management
processes.

Monitored day-to day quality activities in consultation with Site-In charge and contractors.
Managed a team of 10 engineers and supervisors.

Major achievement:
Privileged to work as part of a team executing the prestigious Delhi Metro Rail project.
Diligently carried out the assigned tasks within the targeted time to help complete the
project on time.
Acquired sound knowledge and experience of the latest technology and project management
techniques.
Responsibilities:
Supervised and controlled quality of the segmental, Cast in situ construction of Elevated
corridor at major crossings on Shahdara - Rithala of Rail corridor
organise Pre Dispatch inspection tests of Prestressing material Like Sheathings, Tendon
Anchorage assembly and Load transfer tests and anchorage efficiency tests as per FIP
recommendation.
Inspected and Tested POT/PTFE, Electromeric Bearings as per IS /IRC specifications.
Organise out exhaustive inspection of raw materials. Tested Pot bearing and NDT Ultrasonic
testing and DPT to detect flaws in casting components.
Reviewing commenting and approving the different construction material including Mix
design of concrete and asphalt
Reviewing and Approving Project Quality Plan, method statements, procedures and work
instructions submitted by contractor.
Conducting audits to verify the effectiveness of quality system on the project and ensure
that work is being carried out as per approved quality documents
Developed/ upgraded quality control systems in project and construction management
processes.

Monitored day-to day quality activities in consultation with Site-In charge and contractors.
Managed a team of 10 engineers and supervisors.

Major achievement:
Privileged to work as part of a team executing the prestigious Delhi Metro Rail project.
Diligently carried out the assigned tasks within the targeted time to help complete the
project on time.
Acquired sound knowledge and experience of the latest technology and project management
techniques.

You might also like