0% found this document useful (0 votes)
180 views5 pages

MC 2019 037

LTFRB Memorandum Circular 2019-037

Uploaded by

Jeremy Ryan Chua
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
180 views5 pages

MC 2019 037

LTFRB Memorandum Circular 2019-037

Uploaded by

Jeremy Ryan Chua
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
Republic ofthe Prilipines Department of Transporation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARDIAW COMER. sseres East Avenue, Quezon City re sisal es 26 Regions MEMORANDUM CIRCULAR NUMBER 2019-_037 R Aus 02 2019 NECEIYE SUBJECT: OPENING OF APPLICATIONS FOR THE OF NEW CERTIFICATE OF PUBLIC CONVENIENCE (CPC) TO OPERATE POINT-TO- POINT (P2P) BUS SERVICES ROUTES TO AUGMENT PASSENGER DEMAND FROM STA. ROSA INTERIM TERMINAL AND VALENZUELA GATEWAY COMPLEX INTERIM TERMINAL WHEREAS, on 19 June 2017, the Department of Transportation (DOTr) issued Department Order No. 2017-011 (Re: Omnibus Guidelines on the Planning and Identification of the Public Road Transportation Services and Franchise Issuance) adopting the rules and procedures for the issuance of franchises for public transport routes and services; WHEREAS, pursuant to Section 5(a) of Executive Order No. 202, dated June 19, 1987, the Land ‘Transportation Franchising and Regulatory Board (LTFRB) shall have the power “to prescribe and regulate routes of service, economically viable capacities and zones or areas of operation of public land transportation services provided by motorized vehicles, xxxxx"; WHEREAS, on 16 July 2019, the Board issued Memorandum Circular No. 2019- 031 entitled “Route Amendment Of Certificate Of Public Convenience Of All Provincial Buses Originating From The North And South with Terminals Along EDSA Of Metro Manila, While Provisionally Amending Also The Route Of All City Buses; WHEREAS, under said Memorandum Circular, all the routes of Provincial Buses coming from the North with terminals along EDSA are temporarily amended to end at Valenzuela Interim Terminal, and those coming from the South Luzon, Visayas and Mindanao with terminals along EDSA in Cubao, Quezon City will end at Sta. Rosa Interim Terminal; WHEREAS, per records of this office, there is no existing PUVs authorized to ply and inter-connect from Sta. Rosa Interim Terminal and Valenzuela Interim Terminal to other Integrated Terminals; WHEREAS, in the exigency of service and in order to fully implement the objective of the government to rationalize public utility terminals located along EDSA, in support to the program of Metro Manila Development Authority (MMDA) to relocate them to accredited Interim Terminals, sufficient public transportation services are necessary to cater passenger demand at designated Interim Terminals; 1 Direct Line 426-2516, 4262594 Fax No, 921-2201 WHEREAS, the DOTr has given LTFRB the authority to deliberate and take appropriate action on proposed new/ additional routes pursuant to Public Utility Vehicle Modernization Program (PUVMP); NOW THEREFORE, in line with the objective of Executive Order No. 67 series of 2012 entitled “Providing for the Establishment of the Integrated Transport System”, to provide effective interconnections between different transport modes and services, and in order to augment the demand of PUVs that will ferry the passengers from one terminal to another, the Board, after due deliberation, hereby APPROVES the opening of the following routes for issuance of CPC subject to the following guidelines and specifications: RouTE ROUTE mm —_| REGION ROUTE uevemn | PRBUSsERVICE/ | crassiFica | Fare (km) : TION Cammy | Se: Rosa Interim Terminal nae Route No.1 | ‘Gia | Araneta Bus Terminal 443 F2P/30 | Developmental | 98 New/ Route No.2 | cet | S#-Roselntrin Terminal | 4 v2r/30 | Developmental | 104.00 Ottice ‘Sta, Rosa Interim Terminal - cay a_| Valenzuela Gateway ew Route No.3 | cerel | Complex interim Terminal | 57 P2P/30 | Developmental | 1260 via EDSA Valenzuela Gateway Route No.4 | Cental | Comply interim Teint | 1493 | pae/ 30 New/ | 3300 eee Developmental Valenzuela Gateway aa ‘Complex Interim Terminal - wn Route No.5 | Cental | CT in EDSA, Aurora a7 P2P/ 30 | Developmental | 47 Boulevard Valenzuela Gateway Complex Interim Terminal- Need Central | Parafaque Int my 315, 9.00 Route No.6 | Com | Petar gated 72/30 | desatoprsena EDSA ‘Sta. Rosa Interim Terminal - New/ Route No.7 | Central | Paranaque Integrated 385 pap /30 | Developmental | 85:00 Office | Terminal Exchange Only existing City and Provincial Bus Operators affected by Memorandum Circular No. 2019-031 are eligible to submit application on the Packages/Routes mentioned above. UP caw, Jorrce ane ain sonnet AUG 02 2019 a ANTRATEREITER ‘Arueintgive Roles and Requiaians ae | | Each Route will be awarded to only one (1) qualified Applicant and subsequently processed for the grant of CPC following the provisions of Memorandum Circular No. 2019-013 also known as the Consolidated Guidelines on the Process of Issuance of Certificate of Public Convenience (CPC) and Provisional Authority (PA)/Special Permit (SP) under the Omnibus Franchising Guidelines & Public Utility Vehicle Modernization Program (PUVMP) dated 15 March 2019. The deadline for the submission of letter of intent and qualification documents shall be at 03:00PM of 5 August 2019 to be submitted at the Office of the Executive Director- Central Office. Opening of the sealed documents will immediately follow at 4:00pm of the same date. In case of failure on the initial qualification process, interested applicants shall be given two (2) working days from the date when the initial process is declared a failure to file their Letter of intent and qualification documents. This Memorandum Circular shall take effect immediately following its publication in a newspaper of general circulation and the filing of three (3) copies hereof with the UP Law Center pursuant to Presidential Memorandum Circular No. 11, dated 09 October 1992. SO ORDERED. Quezon City, Philippines, 01 ANG wis Gs Wi ae ‘ORPUS P/Maj. Gen. ANTONIO N. GARDIOLA, JR (Ret.) Board Member OIC-Executive UP. LAW CENTE orrice ot we naronAL AoMNISTEA Aamaaive Riles an Req AUG 02 2019 | Kenya) | frve: IRC iE PHILIPgINE STAR > usiness | FRIDAY | AUGUST 2, 2019 WHEREAS, on 1 Jone 217 the Dearne of Taneperttion (DOT aed Departent Onder No. A711 (@e Oneibus Guieines on the Panay sod fate ofthe Pui Road Tameptaton Serves and Farce lana) doping te a ced ice nin rat apt oats ard eres 1 WHEREAS, pul oo ) acted No, ted Jae, {197 the Land Tearsporation rachis and Reglscey Board (LTFRB) shal have ‘the power “to presrbe and regulate routes of sevice, ecmamsaly viable capacities and zones or aes of operation of pb land transportation series provided by motorznd vehicles voa: WHEREAS, on 16 July 2019 the Board issued Memeorandum Crear Ne 219. (ented "Route Amendarnt Of Cerf OF Public Convenience Of Al Prove ‘Bases Originating From The Noth Arc South with Terminals Along EDSA Of Metro ‘Mana, Wide Provsioaly Arendig Alo The Rote OFA Gi Buses, WHEREAS anders Memorindu Cc lhe oto Prove ase ‘coming fom the Nor with terminals along EDSA are teporay amended tend st ‘elena Intron Ter and thre coming fen the South Lazon, Vises and Mecano with terminals along EDSA In Cutoo, Quezon iy wil nd a Si. Rosh Teer Terminal: WHEREAS pecracords of thsi, thre no exiting PUVe autor ply interconnect om SR Inerin Terminal and Valreula Invern Tern ‘ter nerfed Tena ‘WHEREAS, in the eigercy of service and in onder to fully implemen the ‘tte ofthe goverment aol pb tity terials foe along EDSA, ‘in mppor to the program of Meo Man Development Astherty (MDA) 49 mci them to accrodld Itern Terminals sulicent pull transportation servis srerecesay to cater passenger demand a desigrated Ine Temas WHEREAS, the DOT hs given LIFRB the suthocy to delat and take appre acon on proposed new/ addons routes pursuant 9 Pable Uity ‘Vebice Modernization Progra PUVMP = NOM THEREFORE, in ine with the ote of Executive Onder No.6 sees of 22 ented “Providing forthe Exabishnent ofthe verted Transp Sytc", to prorde elective irtreonacons beeen diferent tanejert moe ad servi, cin order t aren the demand of PUY at wil ery the pages from ce ‘ermal to another, the Board afer due delteratioe hereby APPROVES the opening ofthe fwing routes fr issuance of CPC sujet © the folowing guidlines and specications mot |macion| sour” | vom | PARSEIOG| cnsnca | fe t oi co = a & Rowton] Go RoaeNa2 | com | = Rot No.3 | cae p= co owt Na | emt Roce No6 | Go| Roden. | cmt Only existing City and Provincial Bas Operators alee by Meee CGrelar No, S461 ae elie to submit applation onthe Pacags/Routes smertined above ich Route wil be avaned to ony ow) quid Applicant and mbergoenly promed for the gant of CPC flowing the provisions of ‘Mennrandum Croat No 219.019 so known a the Coste Gusies 02 ‘he Proce of Insane of Crit of Pblie Convene (CP) and Provisional -Anhrity PAYSpecl Pent (5) sider the Onno Fanchisng Gatelines & ‘Public Ubity Veil Modersiztion Progam (UVM) dated 15 March 219. ‘a Germs Ee eta a eee o0lbaes ot pean ecanents hl ea OUPM of 5 Angst 09 be sabe at the Office fhe Becaive Dinca Cea Offs. Opening of the gle dane wi Imada flow a ipmetitenenedate In coe of file on theft qulifetin proc tre eplans sta been to) woking das rom the atewhen he nl rea acre ‘sare fle thes Left nd qulifition camer ‘This Memorandam Cicular shall ie elect immediatly flowing ts pobliton newpaper ener csation ad he ig f thes)

You might also like