Inspector's Manual

The document outlines the roles and responsibilities of various inspectors involved in construction projects, including: 1. Third party inspectors who are independent from the contractor and project owner and provide quality assurance. 2. Project engineers who are responsible for work programming, monitoring progress, reviewing method statements, and more. 3. Inspectors who check that works conform to drawings, specifications and quality standards and submit inspection reports.

Uploaded by

Aung Ba Gyi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
132 views81 pages

Inspector's Manual

The document outlines the roles and responsibilities of various inspectors involved in construction projects, including: 1. Third party inspectors who are independent from the contractor and project owner and provide quality assurance. 2. Project engineers who are responsible for work programming, monitoring progress, reviewing method statements, and more. 3. Inspectors who check that works conform to drawings, specifications and quality standards and submit inspection reports.

Uploaded by

Aung Ba Gyi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 81

(Inspector’s Manual)

-၁-

(၁) Third Party Inspector


၁။ Third Party Inspectors ၁
၂။ Project Engineer ၆
၃။ Inspector ၆
၄။ Inspector ၇
၅။ Internal Inspector ၇
၆။ Internal Inspector ၈
၇။ External Inspector

၈။ External Inspector ၉
၉။ Local Authority Inspector ၉
၁ ။ Quality Controller ၉
၁၁။ ၉

(၂)
၁။ ၁၁
၂။ ၁၂
၃။ ၁၂
၄။ (Ordering) ၁၂
၅။ (Check List) ၁၃
၆။ Formwork Scaffolding ၁၃
၇။
(Planning for Concrete Work) ၁၄
-၂-

၈။ ၁၄
၉။ (Placing of Concrete) ၁၅
၁ ။ Concrete Test Report ၁၅

(၃)
၁။ ၁၇
၂။ (Transverse Reinforcement) ၁၈
၃။ (Main Bars Longitudinal Reiforcement) ၁၈
၄။ (Concrete Cover) ၁၉
၅။
(Dimensional Tolerance) ၂၁

(၄) (Formwork)
၁။ ၂၂
၂။ ၂၂
၃။ ၂၃

(၅) (Falsework)
၁။ ၂၆
၂။ ၂၆
၃။ ၂၈
-၃-

(၆) (Foundation)
၁။ (Excavation Works) ၂၉
၂။ ၂၉
၃။ ၂၉
၄။ (Pile Foundation) ၃
၅။ Bored Pile ၃၁
၆။ Bored Pile Concrete ၃၂
၇။ Bored Pile Pile Load Test
၃၃
၈။ ၃၄
၉။ Pile Load Test ၃၅

(၇) (SAFETY) ၃၆
(၈)
၁။ ( ) ၄
၂။ ( ) (Flemixh bond) ၄
၃။ ၄၁
၄။ ၄၁
၅။ ၄၁
၆။ ၄၁
၇။ ၄၁
၈။ ၄၂
၉။ ၄၂
၁ ။ ၄၂
၁၁။ ၄၂
-၄-

(၉)
၁။ (Cement Plastering) ၄၃
၂။ (Lime Plastering) ၄၅
၃။ (Composite Plastering) ၄၅
၄။ (Pointing) ၄၅
၅။ ၄၆

(၁ )
/
( )
၁။ ၄၉
၂။
၅၁

( )
၁။ ၆၆

( )
၁။ (Temporary Wiring)
၇၁

(၁၁) ( )
၇၃
-၁-

(၁)
Third Party Inspector
၁။ Third Party lnspectiors
၁-၁ Third Party Inspectors

၁-၁-၁ Third Party Inspectors Project

( )
( )
( )
(ဃ) Construction

( ) (Common Sense)
( )
(Inspector)


Subcontractor


Subcontractor Site Engineer



-၂-

။ Inspector
Superrvisor Site Ingineer




( )


( )

Inspector ။ Drawing
Shop Drawing


(ဃ) Construction


Inspector ။


-၃-


( ) (Common Sense)


၁-၁-၂ Third Party Inspectors
Inspector Quality Controller
Supervisor ။

-၄-

(Site Engineer)
(Delivery
Point) Inspector Indent form
။ Inspector (Supervisor)

Inspector

Supervisor (Site Engineer)
Inspector


Project Engineer, Site Engineer, Supervisor

Inspector
Supervisor


Supervisor ။
Inspector


Inspector


၁-၁-၂ Third Party Inspector ။
Inspector
-၅-

Report ။
Report Report


(Standard) (Specification)


Inspection Report
(Request For Information RFIS and Request For Confirmation
RFCS) /
။ Inspector
Contractor

Inspector


(Check List) Report



-၆-

၂။ Project Engineer
(၁) (Work Programming)
(၂) (Monitoring the progress on
program)
(၃) (Method Statement)
(၄) (Drawing
Keeping, registering & distribution)
(၅) (Able to know the discrepancy of
drawing)
(၆) (To Know the basic principle &
practice of work)
(၇) (Under-
standing the finishing works and ESM works)
(၈) (coordinating the different trades)
(၉) (Capable to design
simple parts and temporary works)
(၁ ) (Able to make alternative
proposal)
(၁၁) (Understanding the
construction and chemical materials)
(၁၂) (Having
knowledge of requirement and ability of machinery)
(၁၃) (To know the remedial and curing
works) ။

၃။ Inspector
Inspector Internal Inspector ( ) External Inspector
( ) Local Authority Inspector (
) ။ Inspector Quality Controller
Supervisor ။

။ Project Engineer
Site Engineer

-၇-

Inspector
။ Inspector Supervisor
Site Engineer ။ Inspector

Formworks
Scaffolding Supervisor Site Engineer

၄။ Inspector
(၁) (Able to read the drawings in conjunction
with other relevant drawings)
(၂) Specification, Code, Practice Manual
(၃) (Limit)
- Concrete cover size, spacing, member dimension, alignment
(allowable error)
(၄) (Understanding the importance
and precedence)
(၅) (Skilful in eye
inspection of dimensions, level and verticality)

၅။ Internal Inspector
(၁)

Structural Drawing Architectural Drawing


(၂)
Quality Controller

-၈-

(၃)


(၄)

(၅) Drawing

၆။ Internal Inspector

CATEGORY (A) B.E 6 Year


B Tech 9 Year
CATEGORY (B) B.E 3 Year
B Tech 6 Year
AGTI, EGTI, Dip Tech 9 Year
CATEGORY (C) B.E 2 Year
B Tech 4 Year
AGTI, EGTI, Dip Tech 6 Year

၇။ External Inspector
(၁)
(၂) Structure Drawing Architectural Drawing

(၃)
(၄)

(၅)
(၆)

(၇)
-၉-

(၈)

(၉) (Shop Drawing)


(Product Information and
Sample)
(၁ ) (As-built Drawing)

(၁၁)
Design

၈။ External Inspector

CATEGORY (A) M.E (Civil) 6 Year


B.E (Civil) 12 Year
CATEGORY (B) M.E (Civil) 4 Year
B.E (Civil) 9 Year
CATEGORY (C) M.E (Civil) 2 Year
B.E (Civil) 6 Year

၉။ Local Authority Inspector


Local Authority Inspector

၁ ။ Quality Controller

။ Test Manual

၁၁။
(၁) Project Engineer, Site Engineer
Inspection Engineer
-၁ -

(၂) ။
(၃)
Structural Drawing Architectural Drawing

(၄) Structural Drawing Architectural Drawing


Designer
Drawing

(၅) Drawing Inspector


(၆) Shop Drawing Shop Drawing
Drawing

(၇)
(Last revised drawing)
Project Engineer
(Method Statement)
Inspector ။ Method
Statement
Specification ။
(၈) Designer


(၉)

(၁ ) (Drawing List) Revision

(၁၁) Site Engineer Inspection Engineer


။ Site Engineer
(Inspection Request Form)
Inspection Engineer
(၁၂) Inspection Engineer Check
List
-၁၁-

(၂)

၁။
(၁)
Site

( )
( )
( )
(ဃ)
( )
( )
( ) ။


(၂) vibrator
vibrator ။
(၃) vibrator vibrator

(၄) Batching Plant Pump
Construction Joint

(၅) Foundation Slab
၁၈
vibrator ။
Slump Batching Plant


-၁၂-

(၆)

Site ( )

၂။
(၁) Grade

3
(၂) 50m ( )၆ ။
(၃) ၂ ။

၃။
(၁) ၇ ၂

။ ။
(၂) ၂၈ ၂

(၃) ၇
၇ ၁၄

(၄) ၂၈
(Field Test)

။ NDT Test

(၅)

၄။ (Ordering)

(Slump) (maximum nominal aggregate size)



-၁၃-

၅။ (Check List)
Internal Inspector

(၁) (Form Work)
( ) (Dimension)
( ) (Alignment)
( ) (Levelling)
(ဃ) (Stiffness)
(၂) (Reinforcing Work)
( ) (Size and Numbers)
( ) (Spacing)
( ) (Position)
(ဃ) (Lap Position)
( ) (Splice Length)
( ) (Cover)
( ) (Hook and Anchorage)
( ) (yield strength
tenile strength, unit mass, elongation )
(၃) (Construction Joint)

( )
(၄) (Cleaning)

(Check List)

၆။ Formwork Scaffolding
Site Engineer ( ) Project Engineer

-၁၄-

၇။ (Planning For Concrete Work)

(၁) (Volume of Casting)


(၂) (Concrete grade)
(၃) (Pump or Bucket or Skip)
(၄) vibrator
(၅) (Manpower)
(၆) (Machinery)
(၇) (Initial casting point)
(၈) (Casting sequence)
(၉) (Traffic route)

၈။
(၁) Slump Test
(၂) Slump 50 mm (2 in)
Slump Slump + 15mm ( ½ in) ။
Slump (50 to 100mm) 2 to 4 in Slump
Slump +25mm (1 in) ။
(၃) /

(၄)
( ) ။
(၅) pump

(၆) ASTM ( ) BS

(၇) (Sample Batch No)
(Specimen No) ။
(၈) (၂၄)


-၁၅-

(၉) Pump Pump


(initial - motor) ။

၉။ (Placing of concrete)
(၁)

(၂) ။
(၃) (construction joint)

။ ။
(၄) 500mm (20 in)
vibrator ။
(၅)
Set vibrator

(၆) ၂

(၇) ၂

(၈) Vibrator ။
(၉) Tie
Vibrator
vibrator ။( vibrator
vibrator

(၁ ) Curing (၂ )

၁ ။ CONCRETE TEST REPORT


(၁) Concrete Test Minimum
Strength, Standard Deviation, Mean Strength


-၁၆-

(၂) Test result Test result

method/statement

(၃) Concrete Strength Concrete Test Results
၃ Concrete Strength (fc)

(၄) Concrete Test Strength
Concrete Strength (fc) fc
500 psi ။
(၅) Concrete Test Result

(၆) Non Destructive Test
Method Rebound Hammer, Ultrasonic Pulse Velocity

-၁၇-

(၃)

၁။


(Tension Force)
(Shear Force) (Torsion Force)
Structural member

(Ductility)

(Lateral Force) ။

(Static Force) Dynamic Force


။ Dynamic Force
(Ductility)
။ (Ductility)

Ductility Framing System
(Plastic Hinge)
။ ။
-၁၈-

(Brittle) ။
Ductility
Transverse Reinforcement (Stirrups and Ties)
(Confinemen
t) ။ Ductility

၂။ (Transverse Reinforcement)

(Confinement)

၁။ ၁၃၅˚
( ၃ ) ။
၂။
။ Code
။ Code
(2h) d/4 ။

၃။ (Main Bars Longitudinal Reinforcement)


၁။


၁။ ၁

၂။ ၂

၃။
Vibrator ။
-၁၉-

။ ၃
၁၈ ။

၁။ Moment ။
၂။ 30%, 50%

၃။
၂ ။

၁၆


(Defromed Bars)

၄။ (Concrete Cover)

။ (Nominal Cover
Thickness)


(၁)
( )

( )
( )
(ဃ) ။
-၂ -

( )

(၁) ( ) 3"

(၂)

(၁) ¾" ᶲ 2"


(၂) ⅝” ᶲ 1½"
(၃)

- (Slabs, Walls, Joists)


(၁) ¾" ᶲ 1½"
(၂) ⅝” ᶲ ¾"
- (Beams, Column)
(၁) 1½"
-
(၁) ¾" ᶲ ¾"
(၂) ⅝” ᶲ ½"
( )


-၂၁-

Nominalcover
Fire Beams Floors Ribs
Resistance Simply Continuo Simply Continuo Simply Continuo Columns
Supported us Supported us Supported us
H mm mm mm mm mm mm mm
0.5 20 20 20 20 20 20 20
1 20 20 20 20 20 20 20
1.5 20 20 25 20 35 20 20
2 40 30 35 25 45 35 25
3 60 40 45 35 55 45 25
4 70 50 55 45 65 55 25

။ (Designer)
(Drawing) ။
(Cover
Thickness) (Cover Thickness) ¼"
5mm ။

၅။ (Dimensional Tolerance)
(Effective Depth)
(Concrete Cover)

။ ACI 318-99, Table 3-5


Effective Depth d Tolerance on d Tolerance on min-Cover
d 8 in 3/8 in 3/8 in
d > 8 in 1/2 in 1/2 in

1/2 in ။
(Discontinuous end) 1/2 in ။
-၂၂-

(၄)
(Formwork)

-
/ ။

။ ။
။ (


formwork

(Spacer Block)


၁။




၂။


( ) (Strength of the Concrete)
( )
(stress on the concrete during construction period)
-၂၃-

( ) (Curing)
(ဃ) (subsequent surface treatment
requirements)
( ) Formwork
(Presence of re-entrant
angles)


၃။

fcu-10N/mm2 (1450 psi)


(Stress) ။
(Curing)

(Ordinary or Sulphate - Resisting Portland Cement)

Minimum period before stripping formwork (Concrete made with ordinary or


sulphate resisting Portland Cement)
Minimum period before stripping
Surface Temperature of Concrete
Type of Formwork
t(any temperature
16°C and above 7°C
Between 0° and 25°C)
Vertical formwork to columns, 12h 18h 300/t+10h
walls and large beams
Soffit formwork to slabs 4 days 6 days 100/(t+10)days
Soffit formwork to beams and 10 days 15 days 250/(t+10)days
Props to slabs
Props to beam 14 days 21 days 360/(t+10)days
-၂၄-

(၅)
(Falsework)
- (Falsework)


- (Falsework)

Designer

- Design

(၁) (၂)
၁။ Falsework
/
၂။
/
၃။
/
၄။ /
၅။
/
၆။
/
၇။ Falsework /
၈။ Falsework
Falsework
/
-၂၅-

(၁) (၂)
၉။ Falsework

( - )
၁ ။ ၆

၁၁။ Falsework
/
၁၂။ Falsework
/
။ ။ (၁) Falsework

(၂) Falsework Designer

-
(၁)

(၂)
Falsework Designer Detailer’s

(၃) Falsework

(၄)

-၂၆-

(၅)


(၆)


(၇) ( -
) ။
(၈)

(၉)


(၁ )

၁။


၂။


-၂၇-
၂.၁။


၂.၂။
၄ (Cross Section)

၃။


-၂၈-

(၆)
(Foundation)

။ (Shallow Foundation)
(Deep Foundation) ။

3m(10') (Strip
Foundation) (Pad Foundation)
(Raft Foundation) (Shallow Foundation)
။ ၁ '
D/B
၁ '
D/B ။
၁။ (Excavation Works)


-
(၁) -

(၂)
(၃)
(၄)
Foundation

(၅)
(၆)
(၇) (Overall Construction Programme)

(၈)
-၂၉-

(၉)

(၁ )
(၁၁)

(၂) ။

၂။

၃။


{ Constructor (or) Developer}

။ Secant
Pile System Diaphragm Wall System ။

(Anchoring) ။
Anchoring


-၃ -

၄။ (Pile Foundation)
(Shallow

Deep Foundation (Pile Foundation)



(Friction Pile) (Bearing Pile)

(Driven Pile) (Pushed Pile)
(Bored Pile) ။
(Displacement Pile)
(Replacement Pile) ။
(Displacement Pile)
Driven Pile Pushed Pile ။ Displacement Pile


Displacement Pile (Driving Method)

Replacement Pile
(Bored Pile)


Driven Pile

။ Safety Factor

(Silty Soil) (Compressible Soil)

(Load Test) ။
-၃၁-

Pushed Pile
Jack ။
F=PxA

( Cohesive Soil ) ။ Pushed Pile

။ Pushed Pile

၅။ Bored Pile
Bored Pile Casing ( ) Lining
Tubes ။
Sand Pocket

Casing ( ) Lining Tubes ။


Casing ( ) Lining Tubes Bentonite Slurry
Casing Lining Tubes ။
၁ ၁၅ ၄ Guideline ။
Bentonite Clay
Bentonite Bentonite
Gel
။ Bentonite

Bentonite ။ Granular Soil


Bentonite

Filter- Cake ( )

Bentonite
1.04

-၃၂-

( )Grab Bentonite

( )
Bentonite ။
Bentonite Soil- Particle

Soil- Particle Bentonite


Mechanical ။ Bentonite

Bentonite Slurry

၆။ Bored Pile Concrete


Bored Pile Hole Pile
။ Lining Tube


Pipe (Tremie Pipe) ။
Tremie Pipe (Pressure head)
Bentonite Slurry( )
(Friction Loss) ။
Tremie Pipe

-၃၃-



။ Bentonite
Bentonite

Tremie- Pipe Tremie- Pipe
(၁၂) Slump (၁၅ ) (၆ )

1.35
။ Tremie- Pipe

Tremie- Pipe

Workability Plasticizer
Retarder Workability ။ Tremie- Pipe

။ ။

၇။ Bored Pile Pile Load Test


Bored Pile Pile (Bearing Resistnace)
Pile
(Frictional Resistance) Pile
C, , α ။
Bored Pile

Bentonite Slurry
Bentonite
Pile Adhesion Factor (α) ။

။ Pile
-၃၄-

Pile Pile
။ Pile Bentonite
Pile
။ Bored Pile

။ Bored Pile
Pile
(Continuity Test)

၈။

။ ။
ACI Recommendation

Pile 3” 6” ။ Pile
Pile Pile 10%
Pile Pile 2% ။
Pile Cap 4% ။
Pile
Pile
။ 10%
Pile Ground Beam

(Tolerance) ။

-၃၅-

၉။ Pile Load Test

(Pile Load Test) ။

(၁) Foundation Design


(Pre- engineering work)

(၂) (Foundation) Pile

(၂) ။


Pile
Pile (Electronic Sensor)

(Instrumented Test) ။
(Load platform)
Pile Pile
Pile
Pile (Static Load Test)
Pile Pile
(Electronic Sensor) Dyanamic Load Test

Test ။

Types of
Types of Test
Pile
Bored 2% Static Working Load Test + 50% Integrity Test - -
Pile 1% Static Working Load Test + 5% Dynamic Load Test + 50% Integrity
Test
Driven
1% Static Working Load Test + 50% Integrity Test (Minimum 2 Piles)
Pile
Pushed
1% Static Working Load Test (Minimum 2 Piles) + 25% Integrity Test
Pile
-၃၆-

(၇)
(SAFETY)

Inspector

Safety Director Safety Engineer

Inspector


(၁)


(၂)

(၃)
( -
)

(၄)

-
-
-


-၃၇-


(၁) ( -
)
(၂)

(၃)

(၄) Ground Fault Circuit Interrupters (GFI)


(၅)

(၆)

(၇)

(၈)

(၉) Car ramp ၆


Floor

(၁ ) ၁ -

(၁၁)

GFI
(၁၂)

(၁၃)
-၃၈-

(၁၄)

(၁၅)

(၁၆)

(၁၇)

(၁၈)

(၁၉)

(၂ ) ၃

(၂၁)

(၂၂)

(၂၃)

(၂၄)
outlet box bush

(၂၅)

(၂၆)

-၃၉-

(၈)

( )


။ ၂ ။



။ ၄


၂ ။
၃ ၁
။ ။
၈ ၄
၁ ။


(၇)






၂ ၁ ။


-၄ -

-
၁။ ( )
၂။ ( ) (Flemish bond)
၃။
၄။
၅။
၆။
၇။
၈။
၉။

၁။ ( )


-

။ ။

၂။ ( ) (Flemish bond)




-၄၁-

၃။



၄။

။ ၂ ၁၄



။ ။
၅။


၂ ၄


၆။





၃ ။
၇။

။ ၃


-၄၂-

၈။


၉။
၄၅



၁ ။

။ ( ) ။
၁၂

၁၂ ။
၁၁။



။ ။
၃ ၃ ၄

( ) ။
( )
။ ၃ ၄
။ ။

၆ ၁၂ ။ ၁
။ ။


-၄၃-

(၉)


၁၂ ။



။ Concrete Mixer ။
( )

၁။ (Cement Plastering)


၁ ၃

၁ ၂
၁၂ ။





-၄၄-


။ (၇) ။

၃ ။


၄ ။






။ ၈






။ ၂
။ (Pudlo)
၅% ။ (Impermo)
၂% ။
-၄၅-

၂။ (Lime Plastering)

။ ၁၁၁ ။
၂ ၃ ၁ ၂၃၁
။ ။ ၁၂
။ ။

၃။ (Composite Plastering)
(၁ ၁ ၆) (၁ ၂ ၆) ။

။ ။
၉၄ ။
၉၄
၁၂ ၁၄ ။
၁၁၃ ။

၄။ (Pointing)

(Pionting)


၁/၂
(၆)


-၄၆-

(၁ ၂)



၅။

( ) ( )
(Flat or Flush Pointing)

၄ ။

( )

။ ။

( ) (Horizontal Pointing)



-၄၇-

(ဃ) (Curved Recessed Pointing)

( ) (Square Recessed Pointing)

။ ။

၁/၄

( ) (Truck Pointing)
၁/၈ ၁/၄


( ) (Projecting Joint)





-၄၈-

။ ။

(၇) ။
-၄၉-

(၁ )

( )
၁။
(၁) Structural Drawing Architectural Drawing

(၂) Design Drawing

(၃) foundation ။
( - Strip Footing, Isolated Footing, Combined Footing, Bored Pile,
Pressure Pile, Raft Footing, Mat Footing)
(၄) Bored Pile Bored Pile SIT Result
Pile Cap ။
(၅) Design
Drawing
/ ။ ( Concrete Cover, Splice
Length, Development Length, Spacing of reinforcement bar, no of
reinforcement bar, size of reinforcement bar)
(၆) (formwork)
/

(၇) Mix Design
/ ။
(၈) slump test

(၉) (Agitator)
Slump Test ( ) ။ Mix Design
Slump

(၁ ) 3 days strength, 7 days strength 28
days strength (၆)

-၅ -

(၁၁)
(Fine
Aggregate) (Coarse Aggregate) Physical Properties
(Admixture) Specifications

(၁၂) Ready Mixed Concrete
Mix Design ။
Concrete Mix Design

(၁၃) Grade Mix Design

Mix Design ။
Batching Plant

(၁၄)
Non Destructive Test (NDT)
Schmidt Rebound Hammer (SRH) Ultrasonic Pulse
Velocity (UPV)

(၁၅) Physical Properties


(၁၆) Design Drawing
Designer
Designer

(၁၇)

(၁၈) Test Result Minimum Strength, Standard Deviation
Mean Strength

-၅၁-
1. Driving Piles ( )
General

1. Pile ( )
/
2. Pile Steel /
3. Tubular Steel Pile Driving Shoe /
4. Precast Concrete Piles Driving Shoe /
5. Pile /
6. Pile Pile
/
7. Pile ၄ Point Pile 1%
( 75mm) /

Installation

1. RC Pile 1/5th /
2. PC Pile Pile 3/10th /
3. RC Pile 28days
4. Pile Pile /
5. Pile /
6. ( ) Pile (၄၈)
/
7. Pile Driving Equipment List
/
8. Steel H- Piles Water Jetting /
9. Pile Hammer /
10. Follower Pile /
11. Water Jet low 20mm nozzle 700Mpa /
12. /
13. Pile Foundation Level /
14. Pile 500mm
/
15. Pile
Engineer /
16. PC Pile Steel Cut Level /
-၅၂-

2. Bored Pile
General

1. ( )
/
2. Pile Location Point Pile Length 1% ( ) ( 75mm)
/

Installation

1. Pile /
2. Pile Equipment
/
3. Pile (၃)
/
4. Pile /
5.
/
6.
/
7. /
8. Pile Level
/
9. Pile /
10. Pile
/
11. ( ) /
12. Pile Load Test
(၇)
/
13. Load Test Result
(၇) /
-၅၃-
3. Steel Reinforcement
Materials

1. Steel

/
2. Designer Specification / Site
Bath
/
- Yield Strength
- Tensile Strength
- Elongation
- Unit Mass
- Nominal Diameter

Protection

1. Reinforcement Steel
/
2. Steel
( )
/
-၅၄-
Placing and Fixing

1. Steel /
(a) (Shape)
(b) (Diameter)
(c) (Length)
(d) (Number)
(e) (Spacing)
2. Steel /
3. 1.25mm /
4. Steel Concrete Cover /
5. Cover precast ( )
/
6. Block
/
7. Bar Bar Chair
/
8.
/
9. Reinforcement
/

Splicing ( )
1. Bar ( )
/
2. (Size and Numbers) /
3. (Spacing) /
4. (Position) /
5. (Lap Position) /
6. (Splice Length) /
7. (Cover) /
8. (Hook and Anchorage) /
9. ၃ % ၅ %( )
Designer /
10. (Deformed Bars)
/
11. Tie Spacing /
-၅၅-

4. Formwork For Concrete


General

1.
/
2. /
3.
/
4.
/
5.
/
6. Red Oxide
/
7.

/
8.
/ (

။)
-၅၆-
Construction

1. Formwork
/
2. Formwork
/
3. Mild Steel Formwork Design
/
4. Mild Steel Formwork Bolt & Nut

/
5.
/
6. Block-out
/
7. Bolts
/
8. bolt
/
9. Formwork
Corner Filled /
10. Formwork release agent /
11. release
agent /
12. ၄
/
-၅၇-

Beam & Slab Formwork

1. Floor Beams and Slabs Formwork


/
2. /
3. /
4. /
5. /
6. /
7. /
8. Floor Beam Side Formwork Survey Line
/
9. Floor Slab Formwork Level
/
10. Red Oxide /
11. 1’C/C 4”C/C I 4’ C/C
T 18”C/C T I 4’
/
12. Beam Depth ၂ Beam
/
13. Architecutre /
14. Column Beam Formwork Column
Formwork /
15. Parameter Beam
/
-၅၈-

Column Formwork

1. /
2. /
3.
/
4. Column Survey Line /
5. ၈ Column /
6. Cover Block /
7. T Shape L Shape Column
/
8. Column Rebar Center 3” x 1”
/
-၅၉-

5. Concrete Work
Material & Mix Design

1.
Designer Design Concrete Mix Design
/
2.

/
3. Concrete Mix Design Slump Values, Maximum
water content, minium and maximum cement content
/
4. Cement,
Fine Aggregate, Coarse Aggregate
/
5.
Mould Sample /
6. Grout Compressive Strength Designer
Design Strength /
-၆ -
Placement & Finishing

1. Formwork
/
2. Formwork
Casting Level
/
3. (G 15-30 33˚C G 40 30˚C)
temperature /
4. Formwork Steel Reinforcement Bar Temperature
35˚C /
5. Mix Design
Slump Test Concrete Mix Design
/
6. Construction Joints
(i) /
(ii)
/
(iii) /
(iv) Cement Grout /
7. Segregation
2m
Tremie Pump
/
8. Vibrator
Vibrator
/
9. /
10.
Red Oxide /
11. Concrete Pump /
12.

/
3
13. (5m ) Vibrator
(၁) Vibrator
Vibrator (၁)
/
-၆၁-

14. Vibrator
(i) Vibrator 500mm
/
(ii) Vibrator
/
(iii) Vibrator Segregation
/
(iv) Vibrator Steel Reinforcement Bar
/
15. Concrete Block /
16. Block /
17. (3days,
7days, 28days) /
18. time limit /
19.
/
20. Curing (7)days
/
21. Curing (14)days /
-၆၂-

6. Brick Work

1.
/
2. /
3. ၄’- ” /
4. ၃/၈” - ၁/၂” /
5. ၄ X-met /
6. Vertical / Horizontal level /
Level /
7. /
8. /
9.
/
10. Structure Member (Column, Beam)
Cracking
Beam, Column
Bracket /
11. /
-၆၃-

7. Plastering Work

1. Plaster
၂၄ /
2. Plaster (3/8” -1”) /
3. Plaster
/
4. Plaster (7)days
/
5. Plaster (Sprit level)
/
6. /
-၆၄-
၂။

(၁) Structural Drawing Architectural


Drawing ။
(၂) Design


(၃) Design Drawing

(၄) foundation
Specifications ။
( - Strip Footing, Isolated Footing, Combined Footing, Bored Pile,
Pressure Pile, Raft Footing, Mat Footing)
(၅) Design Drawing

(၆) Formwork Scaffolding

(၇)


(၈)

(၉) vibrator
vibrator ။
(၁ ) vibrator vibrator

(၁၁) Batching Plant Pump
Construction
Joint ။
(၁၂) (Construction Joint)

။ ။
-၆၅-

(၁၃)

(၁၄) /

(၁၅) (၂၄)


(၁၆) Pump Pump
(initial - motar) ။
(၁၇) Curing (၂ )
(၃) (၇) ။
(၁၈) Test Result Test Result

method/statement


(၁၉)


(၂ ) ။
(၂၁)


(၂၂)


(၂၃)


-၆၆-
( )
၁။ QA/QC
၁.၁။
(၁) ။
(၂) ။
(၃)

(၄)

(၅) (Work Schedule) ။
(၆) ။
(၇) ( ) ။
(၈)

၁.၂။
(Bearing Capacity of Soil) For the Design
And Construction of Reservoirs, Water Treatment Plant and Waste Water Treatment
Plant) (Percolation Test)
( ) Report

၁.၃။
(၁) (A3 Size) (min) ။
(၂) Site Plan, Layout Plan, Detailed Drawing & Isometric Drawings

-၆၇-

(၃) Drawing

(၄)

(၅) Design

(၆)
MNBC, CQHP Guide Line

၁.၄။
(၁)

(၂) ။

(၃) ။
(၄) Designer
(Head, Discharge, Horse Power, Efficiency)

၁.၅။ (Water Demand)



-၆၈-

၁.၆။ (Water Sources)


(၁)


(၂) Tube Well Tube Well
၅ - ။
(၃) Tube Well
၅ - ။
(၄) ( Tip of the Deepest Pile) ( )
( Bottom of the Shallow Foundation) (Top
of the Aquifer from which Ground Water) ၁၅ -

(၅) (၃) Tube
Well

(၆) Pumping Hours ၁၂-

၁.၇။
(၁)
(One Day Storage) ။
(၂)
၃၅% (35% of one day storage) ။
(၃) ။
-၆၉-

၁.၈။


၁.၉။ ။
၁.၁ ။
Level Point (0.5 and 1.5)

၁.၁၁။ (Spent Water) (Soil Water) (Waste Water)
။ (Soil Water)
။ (Waste Water)

၁.၁၂။ (Soil Water)

၁.၁၃။
Effluent Quality ။
၁.၁၄။ Effluent Quality

၁.၁၅။ Horizontal Selt
Cleaning 3.0 ft/sec ။


၁.၁၆။
(Ventilation System) ။
၁.၁၇။ Sewer Line ( ) ( )
(Manhole) ။
-၇ -

၁.၁၈။ / ။

၁.၁၉။ (Rain Water Gutter)
(Outlet) (Rood Side
Drain) ။
၁.၂ ။ ။
-၇၁-

( )
၁။ ( Temporary Wiring )


(၁)


(၂)

(၃) ( Weather
proof insulation ) ။
(၄)
( insulation ) ။
(၅)

(၆) Flexible

(၇) ( Bare or open conductor )
( insulators ) ။
(၈) join box over current
Fuse ။
(၉) Earth leakage circuit breaker ( ELCB ) ။
Residual operating current 300mA ။
(၁ ) Circuit breaker


(၁၁) Socket ။

(၁၂) Industrial Type Weatheer proof ။
(၁၃) Portable socket ။
-၇၂-

(၁၄) Electric Control Panel Electric board


(Grounded) ။
(၁၅) Electric board ။
(၁၆) Main service conductors, Feeder conductors Branch circuit
conductors ။
(၁၇)

(၁၈)
။( -
........ )
(၁၉) ။
-၇၃-

(၁၁)
( )

QA / QC
Sr
Material Name of Testing Standard Specification
No.
1 Cement Air Content of mortar MOC 12%(max)
volume
Fineness, Specific surface MOC
(a) Turbidimeter Test 160m2/kg (min)
(b) Air permeability Test 280m2/kg (min)
Autoclave expansion MOC 0.8% (max)
Compressive Strength MOC
3days - 12.0Mpa
7days 19.0Mpa
Time of Setting (minutes) MOC
(a) Gillmore Method
(i) Initial Setting Time ≥ 60 minutes
(ii) Final Setting Time ≤ 600 minutes
(b) Vicat Method
(i) Initial Setting Time ≥45 minutes
(ii) Final Setting Time ≤ 375 minutes
2. Fine Grading (Sieve Analysis) ASTM 0.15mm in size
Aggregate C33-78 (2-10% in passing)
4.75mm in size
(95-100% in passing)
Specific Gravity ASTM 2.6-2.8
C128-88
Clay Lump B.S-812 1.0(maximum)
Fineness Modulus B.S-812 2-3.5
3
Loose Density (lb/ft ) B.S-812 65 - 85
3
Rodded Density (lb/ft ) B.S-812 85 - 95
Absorption B.S-812 6.0 (maximum)
-၇၄-

Sr
Material Name of Testing Standard Specification
No.
3. Coarse Grading (Sieve Analysis) ASTM 4.75mm in size
Aggregate C33-78 (0-5% in passing)
37.5mm in size
(95-100% in passing)
Specific Gravity ASTM 2.6
C127-88
Absorption (%) B.S-812 1.0 (maximum)
3
Loose Density (lb/ft ) B.S-812 85 -110
3
Rodded Density (lb/ft ) B.S-812 95 -120
Clay Lump (%) B.S-812 1.0 (maximum)
Crushing Value (%) B.S-812 40 (maximum)

Los- Angeles Abrasion Value - 50 (maximum)


(%)
4. Concrete Slump Test ASTM As per Mix Design
BS
Compressive Strength ASTM As per Mix Design
BS and Design Drawing
5. Brick Compressive - >1000Psi
Strength
6. Deformed Tensile Strength MOC
bar
Grade 40 420 MPa
Grade 60 620 MPa
Grade75 690 MPa

Grade 40 Yield Strength MOC 280 MPa


Grade 60 420 MPa
Grade75 520 MPa
-၇၅-

Specification for Elongation of Deformed Bar


Sr
, Bar Size Elongation (min:) (%)
No G-40 G-60 G-75
1 D10 11 9 -
2 D12 12 9 -
3 D 13 12 9 -
4 D 14 12 9 -
5 D 16 12 9 -
6 D 18 12 9 -
7 D 19 12 9 7
8 D 20 - 8 7
9 D 22 - 8 7
10 D 24 - 8 7
11 D 25 - 8 7
12 D 28 - 7 6
13 D 29 - 7 6
14 D 30 - 7 6
15 D 32 - 7 6
16 D 36 - 7 6
17 D 43 - 7 6
18 D 57 - 7 6
-၇၆-

Specification for Nominal Diameter and Unit Mass of Deformed bar

Nominal Diameter
Sr. No Bar Size Nominal Mass (kg/m)
(mm)
1. D 10 10 0.617
2. D 12 12 0.888
3. D 13 13 1.042
4. D 14 14 1.208
5. D 16 16 1.578
6. D 18 18 1.997
7. D 19 19 2.226
8. D 20 20 2.466
9. D 22 22 2.984
10 D 24 24 3.551
11 D 25 25 3.853
12 D 28 28 4.833
13 D 29 29 5.185
14 D 30 30 5.549
15 D 32 32 6.313
16 D 36 36 7.990
17 D 43 43 11.399
18 D 57 57 20.030

You might also like