08 Petosea Presen 2008 - English - Final

PT Petrosea Tbk held a public presentation on June 19, 2008 to discuss the company's operations and financial results. The presentation was scheduled for 30 minutes with a 30-minute Q&A session to follow. It covered an overview of the company including its shareholders and history in Indonesia, financial results for 2007-2006 which showed increased revenue and profits, current mining, engineering, and service operations, and the company's outlook and goals to double its business by 2010.

Uploaded by

Jastin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views33 pages

08 Petosea Presen 2008 - English - Final

PT Petrosea Tbk held a public presentation on June 19, 2008 to discuss the company's operations and financial results. The presentation was scheduled for 30 minutes with a 30-minute Q&A session to follow. It covered an overview of the company including its shareholders and history in Indonesia, financial results for 2007-2006 which showed increased revenue and profits, current mining, engineering, and service operations, and the company's outlook and goals to double its business by 2010.

Uploaded by

Jastin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 33

PT Petrosea Tbk

Public Expose
19 June 2008
Your Kind Attention Please

• This presentation will last for approximately 30 minutes, and will


be followed by Q&A session for 30 minutes
• We will not distribute hard copy of this presentation, it can be
accessed at Petrosea’s website: www.petrosea.com
• Please refrain from using cellular phones during the presentation
• During the Q&A session, each person can only ask a maximum
of two questions

PT Petrosea Tbk – Public Expose – 19 June 2008 2


Contents
• Overview
• Financial Results
• Current Operations
• Health, Safety, Environment and Quality Assurance
• Outlook and Summary

PT Petrosea Tbk – Public Expose – 19 June 2008 3


Overview

“Petrosea shall be an Indonesian mining house


which, with its partners, will provide a complete
mining solution from feasibility study, engineering,
construction contract mining and mine services
construction,
(“from Pit to Port - PTP”) delivering enhanced
margin
g and return on assets through g integrated
g
capability.”

PT Petrosea Tbk – Public Expose – 19 June 2008 4


Overview
Major Shareholders

Murray & Roberts Holdings Limited


• 55.97%* shareholder of Clough Limited (ASX: CLO)

Clough Limited
• 80.37%** shareholder of PT Petrosea Tbk (IDX: PTRO)

PT Petrosea Tbk
• 50%* shareholder
h h ld off PT S Santan
t BBatubara
t b
• 47%* shareholder of PT Tirta Kencana Cahaya Mandiri

*As of 31 May 2008


**As of 3 June 2008

PT Petrosea Tbk – Public Expose – 19 June 2008 5


Overview
History in Indonesia
• 1972 - Incorporated in Jakarta, Indonesia as PT Petrosea International
Indonesia
• 1984 - Acquired by Clough Limited
• 1990 - Listed on the Jakarta and Surabaya Stock Exchange (now
g )
Indonesia Stock Exchange)
• The first publicly listed Indonesian engineering and construction
company
• The name was changed to PT Petrosea Tbk

…36 years continuous experience in operating in Indonesia

PT Petrosea Tbk – Public Expose – 19 June 2008 6


Overview
Current Business Operations
Engineering and Petrosea PT Tirta
Mining Construction
Contract Mining
Offshore PT Santan Kencana
Minerals
Mi l & IInfrastructure
f t t
Mine Services Offshore Marine Construction Supply Batubara Cahaya
Mine Partnering Oil and Gas Asset Support Base Mandiri
Engineering

Business Lines Partnering


• Goal - To grow and double our business by 2010 and achieve satisfactory return on equity
• Average annual turnover over the last 5 years1 - US$108.1 million
• Total number of employees2 - 2,095
2 095 people
• Turnover per Business Operations3:
• Mining - 60% of Total Turnover
• E i
Engineering
i and
dCConstruction
i - 25%
2 % off T
Totall T
Turnover
• Services (incl Petrosea Offshore Supply Base, PT Tirta Kencana Cahaya Mandiri) -
15% of Total Turnover
1Based on Annual Turnover for the Years Ended 31 December 2003 - 2007
2As of 31 May 2008
3Based on Annual Turnover for the Years Ended 31 December 2007

PT Petrosea Tbk – Public Expose – 19 June 2008 7


Overview
O
Operations
ti Map
M

PT Petrosea Tbk – Public Expose – 19 June 2008 8


Overview
Key Clients - Past and Present
• Mining - Coal, Gold, Nickel, Granite, Tin
• Freeport • KPC
• Newmont • Inco
• Indominco Mandiri (Banpu) • Gunungbayan Pratama Coal
• BHP Billiton Indonesia • Ilthabi Bara Utama
• Kelian
K li Equatorial
E t i l Mining
Mi i • Indo
I d Muro
M K
Kencana
• Sanga Coal Indonesia (Noble Group) • Cibaliung Sumber Daya (Austindo Resources)

• Oil and
d Gas
G

• BP • ConocoPhillips
• Chevron • Total Indonesie
• ExxonMobil • Santos
• ENI Bukat • Star Energy
• Kodeco Energy • Premier Oil
• Halliburton • MISwaco

PT Petrosea Tbk – Public Expose – 19 June 2008 9


Contents
• Overview
• Financial Results
• Current Operations
• Health, Safety, Environment and Quality Assurance
• Outlook and Summary

PT Petrosea Tbk – Public Expose – 19 June 2008 10


Financial Results*
(in Thousand US$, unless otherwise stated ) 2007 2006
Operating Revenue 125,962 105,724
Operating Income 12,622 8,106
Net Income 7,097 6,438
Earning per Share (US$) 0 0704
0.0704 0 0638
0.0638
Dividend per Share (US$) 0.0297 0.0149
Cash and Cash Equivalents 21,582 14,327
Working Capital 37,607 42,105
Capital Expenditure 25,684 16,581
Total Assets 148,638 119,993
Debt (Finance Leases) 24,226 14,354
q y
Total Equity 76,411
, 74,874
,
Operating Income / Operating Revenue (%) 10.02% 7.67%
Net Income / Operating Revenue (%) 5.64% 6.09%
Net Income / Total Assets (%) 4.78% 5.37%
Net Income / Total Equity (%) 9.29% 8.60%
Debt to Equity Ratio (Ratio) 0.32 0.19
Dividend Payout (%) 42.19% 23.36%
Current Ratio ((Ratio)) 1.71 2.27
*For the Years Ended 31 December

PT Petrosea Tbk – Public Expose – 19 June 2008 11


Financial Results*
Strong Operating Performance
132.94 125.96 • Operating Revenue × by 19.15% to US$125.96 million
105.72
• Significant
g g
growth of E&C Revenue - Pakar coal
development, Bontang coal terminal expansion
stage 1
2005 2006 2007 • Strong growth of Services Revenue – Petrosea
Op e r a t i n g R e v e n u e
( U S $ M i l l i on)
Offshore Supply Base (POSB)
• Stable Mining Revenue – GBP coal mining, Sanga-
125.96
2006
105.72
Sanga coal mining
2007
75.55
74.62

31.59 18.43
16.81 14.06

E&C Mining Services Total


Operating Revenue
(US$ Million)

*For the Years Ended 31 December

PT Petrosea Tbk – Public Expose – 19 June 2008 12


Financial Results*
Strong Operating Performance
6.44
7.10 • Net Income × by 10.24% to US$7.10 million
4.57
• Significant
g g
growth of Mining
g Net Income – Sanga-
g
Sanga coal mining
• Strong growth of Services Net Income – Petrosea
2005 2006 2007 Offshore Supply Base
N e t I nc o m e
( U S $ M i l l i on)

459

• Work in Hand × by
b 139
139.06%
06% to US$459 million as a res
result
lt
239
192
of Pakar coal mining contracts secured at the end of 2007
• Pakar coal contract mining - US$145 million
• Pakar coal hauling, processing and port handling
2005 2006 2007
Wo r k I n H a n d
services - US$197 million
( U S $ M i l l i on)

*For the Years Ended 31 December

PT Petrosea Tbk – Public Expose – 19 June 2008 13


Financial Results*
Strong Balance Sheet Position
Cash
• Cash Ending Balance × by 50.64%
21.58
Ending Balance
14 33
14.33
to US$21.58 million

7.26
• Cash flow from Operating
Net Increase
5.79 Activities of US$24.09 million
Fi
Financing
i A
((12.18))
Activities
ti iti • Cash flow from Investing
(5.85)
2006 2007 Activities of (US$4.65 million)
(4.65)
Investing Activities
(11.98) • Cash flow from Financing
Activities of ((US$12.18 million))
24.09
Operating Activities
23.62

US$ Million

2006 2007 • Reduced


R d dWWorking
ki C Capital
it l
37.61
Working Capital
42.11

US$ Milli
Million

*For the Years Ended 31 December

PT Petrosea Tbk – Public Expose – 19 June 2008 14


Financial Results*
Strong Balance Sheet Position
• Increase in Debt (Finance Leases)
24.23
Debt
14.35
2007
to US$24.23
$ million along
g with
US$ Million
2006 Increased Capex to US$25.68
Capital Expenditure million
(US$ Million)
25.68
• Mining
Mi i C Capex – Sanga-Sanga
S S
2006
2007
19.54
16.58
coal mining fleet, Rebuilds
10.90 • Services Capex
p - Continuing
g
5.62 5.90
expansion and development of
POSB
E&C Mining Services Total

• But
B t still maintaining relati
relatively
el lo
low
Debt to Equity Ratio - 0.32
0.32
Debt to Equity Ratio
0.19

2006 2007

*For the Years Ended 31 December

PT Petrosea Tbk – Public Expose – 19 June 2008 15


Contents
• Overview
• Financial Results
• Current Operations
• Health, Safety, Environment and Quality Assurance
• Outlook and Summary

PT Petrosea Tbk – Public Expose – 19 June 2008 16


Current Operations*

Gunungbayan Pratama Sanga Coal Indonesia – Ilthabi Bara Utama - Pakar Total Indonesie, ENI Bukat, Chevron,
Coal - GBP Coal Mining Sanga-Sanga Coal Mining Coal Mining Halliburton, MISwaco, ExxonMobil
US$175 million US$137 million US$342 million US$52.5 million

Indominco Mandiri - Bontang Cibaliung Sumber Daya – Coal Mining


Ilthabi Bara Utama - Pakar
Coal Terminal Expansion Cibaliung Gold Project
Coal Development
Stage 1 and 2 Stage 1 and 2
US$48 million
US$30.1 million US$9.7 million

BHP Billiton Indonesia - Tekno Orbit Persada - TOP Thermal Bumi Modern Sejahtera - Modern
Bumbun Exploration Camp Coal Bankable Feasibility Study Nickel Pre-Feasibility Study Water Treatment Plant
US$3.5 million US$2.1 million US$0.06 million US$7.8 million
*As of 31 May 2008

PT Petrosea Tbk – Public Expose – 19 June 2008 17


Current Operations*
Mining Business Line
• GBP Coal Mining
• Contract Value : US$175 million
• Contract Duration : 2005-2008
• Location : Muara Pahu,, East Kalimantan
• Client : PT Gunungbayan Pratama Coal
• Scope of Work : Excavation and cartage to dump areas
from multiple pits of approximately 37
million bcm per annum
• Production Fleet : Nine large excavators and dump truck
fleets

• Sanga-Sanga Coal Mining


• Contract Value : US$137 million
• Contract Duration : 2005 2009
2005-2009
• Location : Sanga-Sanga, East Kalimantan
• Client : PT Sanga Coal Indonesia (Noble Group)
• Scope of Work : All overburden, coal loading and hauling
operations, with approximately 17 million
bcm per annum and 1.9 million ton of
coal per annum
• Production Fleet : Seven large and two small
excavators, and dump truck fleets

*As of 31 May 2008

PT Petrosea Tbk – Public Expose – 19 June 2008 18


Current Operations*
Mining Business Line
• Pakar Coal Mining
• Contract Value : US$342 million
• Contract Duration : 2008-2013
• Location : Muai and Senyiur,
y East Kalimantan
• Client : PT Ilthabi Bara Utama
• Scope of Work : Operate and manage all mining, coal
processing, haulage (approximately 37 km
from mine to port) and barge loading
activities at a production rate of
activities,
approximately 5 million ton per annum
• Production Fleet : Large excavators, large push dozers, dump
truck fleets, and truck/trailer fleets

*As of 31 May 2008

PT Petrosea Tbk – Public Expose – 19 June 2008 19


Current Operations*
Engineering & Construction (E&C) Business Line
• Bontang Coal Terminal Expansion Stage 1 & 2
• Contract Value : US$30.1 million
• Contract Duration : 2007-2009
• Location : Bontang East Kalimantan
Bontang,
• Partner : Laing O’Rourke
• Client : PT Indominco Mandiri (Banpu)
• Scope of Work : Stage 1 - Expansion of the stockyard
facilities
Stage 2 - Capacity upgrade of the
shiploading stream, a new barge
unloading stream, and the addition of
barge outloading facilities

• Cibaliung Gold Project Stage 1 & 2


• Contract Value : US$9.7 million
• Contract Duration : 2006 – 2008
• Location : Cibaliung Banten
Cibaliung,
• Client : PT Cibaliung Sumber Daya (Austindo
Resources Corporation NL)
• Scope of Work : Detail engineering, re-erection and re-
installation (construction) of the gold
*As of 31 May 2008 processing plant

PT Petrosea Tbk – Public Expose – 19 June 2008 20


Current Operations*
Engineering & Construction (E&C) Business Line
• Pakar Coal Development
• Contract Value : US$48 million
• Contract Duration : 2007-2008
• Location : Muai and Senyiur,
Senyiur East Kalimantan
• Client : PT Ilthabi Bara Utama
• Scope of Work : Infrastructure development for a
greenfield coal mine, which incorporates
the full coal handling chain from lump
coal stockpiles, crushing, stacking,
reclaiming and haulage to a river
stockpile and barge loading system

• Bumbun Exploration Camp


• Contract Value : US$3.5 million
• Contract Duration : 2007-2008
• Location : Puruk Cahu, Central Kalimantan
• ClientCli t : PT BHP Billiton
Billit IIndonesia
d i
• Scope of Work : Design, construction and commissioning
of the exploration camp and supporting
infrastructure including helicopter hangar,
landing pads
pads, clinic
clinic, accommodation and
*As of 31 May 2008 fuel facilities

PT Petrosea Tbk – Public Expose – 19 June 2008 21


Current Operations*
Engineering & Construction (E&C) Business Line
• TOP Thermal Coal Bankable Feasibility Study
• Contract Value : US$2.1 million
• Contract Duration : 2008
• Location : Kalimantan
• Client : PT Tekno Orbit Persada
• Scope of Work : Study of greenfield coal chain development
for approximately 10 million ton per annum
coal export,
p , which incorporates
p mining
g
options, infrastructure including stockpiling
and reclaiming systems, haul road, port
stockpiling and shiploading systems

• Modern Nickel Pre-Feasibility Study


S
• Contract Value : US$0.06 million
• Contract Duration : 2008
• Location : South East Sulawesi
• Client : PT Bumi Modern Sejahtera
• Scope of Work : Preliminary study of greenfield nickel ore
export development which incorporate all
support infrastructure including stockpiles
at ROM and port, materials handling and
*As of 31 May 2008
barge loading system

PT Petrosea Tbk – Public Expose – 19 June 2008 22


Current Operations*
Petrosea Offshore Supply Base (POSB) Business Line
• Location : Tanjung Batu, Balikpapan, East Kalimantan
• Land Area : 89 ha
• Purpose : World-class supply base facilities supporting
oilil and
d gas production
d ti and d exploration
l ti drilling
d illi
in the Makassar Strait and surrounding area
• Wharf Facilities : Deep water wharf of 200 metres outer quay
at a minimum water depth of 8 metres, with a
dedicated oiloil-spill
spill contingency facility
• Craneage Facilities : Extensive materials handling capacity to
receive large volume bulk material deliveries
• Storage Facilities : Extensive hard stand storage areas of over
100,000 square
q metres and undercover
storage areas of 13,500 square metres
• Contract Value : US$52.5 million
• Contract Duration : 2006-2010
• Clients : Total Indonesie, ENI Bukat, Chevron,
H llib
Halliburton, MIS
MISwaco, ExxonMobil
E M bil
• Remarks : Supported by machinery & workshop facilities,
POSB is also a logistics hub for supporting
Petrosea mining operations including fleet
management
*As of 31 May 2008

PT Petrosea Tbk – Public Expose – 19 June 2008 23


Current Operations*
PT Santan Batubara

• Concession Type
yp : Third g
generation Coal Contract of Work
(CCoW)
• Location : Kutai Kartanegara - Kutai Timur -Bontang,
East Kalimantan
• Area : 25,000 ha
• Ownership : 50% - PT Petrosea TbkTbk,
50% - PT Harum Energy
• Current Stages : Construction
• Operating Duration : 30 years (upon Operating Stage)
• Coal Resources : Final exploration drilling is currently being
completed to enable a JORC standard
resource report to be completed

*As of 31 May 2008


**Subject to a successful resource report

PT Petrosea Tbk – Public Expose – 19 June 2008 24


Current Operations*
PT Tirta Kencana Cahaya Mandiri (TKCM)

• Investment Value : US$7.8 million


• Investment Duration : 2004-2008
• Operating Duration : 2004-2019 (15 year)
• Location : Cikokol, Tangerang
g g Regency,
g y Banten
• Ownership : 47% - PT Petrosea Tbk,
28% - PT Enviro Nusantara,
25% - PT Quarta Desira
• Client : PDAM Tirta Kerta Raharja -Tangerang
Regency
• Cooperation Agreement : Rehabilitate, Operate and Transfer
(ROT) of Cikokol Water Treatment
Plant, from the initial treated water
capacity of 934 litres/second to 11,575
575
litres/second within three years

*As of 31 May 2008

PT Petrosea Tbk – Public Expose – 19 June 2008 25


Contents
• Overview
• Financial Results
• Current Operations
• Health, Safety, Environment and Quality Assurance
• Outlook and Summary

PT Petrosea Tbk – Public Expose – 19 June 2008 26


Health, Safety and Environment
Outstanding Safety Performance

• LTIFR (Lost Time Injury Frequency Rate) currently 0.14*


• Set a new record as the lowest recorded LTIFR in PT Petrosea Tbk
• Zero Accident Award during 2007
• Tanjung Batu Site (Asset Management) – More than 2 million hours
LTI free**
f **
• Petrosea Overburden Removal Project (Gunung Bayan Site) – More
than 6 million hours LTI free**
• Petrosea Bontang Coal Terminal Project (Indominco Site) - 335
thousand manhours LTI free***
• Working
g towards ISO 14001 compliance
p

*As of 31 May 2008 – Based on AS/NZ Standard


**from the Indonesian Government
***from PT Indominco Mandiri (Banpu)

PT Petrosea Tbk – Public Expose – 19 June 2008 27


Quality Assurance
ISO 9001:2000
• Holder of an ISO 9001:2000 certificate for almost a decade
• Petrosea’s Management
g System
y -ap proven business life-cycle
y
systems covering three business lines:
• Mining Operations
• Engineering & Construction
• Offshore Supply Base Operations

PT Petrosea Tbk – Public Expose – 19 June 2008 28


Contents
• Overview
• Financial Results
• Current Operations
• Health, Safety, Environment and Quality Assurance
• Outlook and Summary

PT Petrosea Tbk – Public Expose – 19 June 2008 29


Market Outlook
Mining and Mineral
Mineral*
• Mining and mineral market has driven the company growth during the year
in line with the high commodity prices , and we expect this market to remain
b
buoyant t iin th
the medium
di tterm, d
due tto hi
high
h energy prices
i

• Strong demands throughout Asia and supply disruptions in major coal


producing countries have tighten the coal supply in the global market

• y the world’s largest


Indonesia is currently g exporter
p of thermal coal
• Domestic demand is projected to drive Indonesian thermal coal production
in the medium term as the government rapidly builds coal-fired power plants

*Source: Barlow Jonker, Indonesian Coal Mining Association, Mitrais Mining News Report, Minister of Energy and Mineral Resources

PT Petrosea Tbk – Public Expose – 19 June 2008 30


Market Outlook
Oil and Gas*
• Oil and gas market has been a difficult market for the company during
the year, but we anticipate improving activity in this area in the medium
term for both onshore and offshore project opportunities

• Recent increases in exploration drilling and licensing activities should


also restore Indonesian oil production growth in the coming years

• The outlook for the Indonesian gas market is positive as Indonesian gas
production is expected to continue its historical growth trend and
projections of sustained growth

*Source: Indonesian Petroleum Association

PT Petrosea Tbk – Public Expose – 19 June 2008 31


Summary
• Strong operating performance through underlying Revenue
& Earning growth
• Work in Hand nearly US$0.5
US$0 5 billion*
billion
• Strong Balance Sheet position
• Shareholder value enhancement – significant increase in
Dividend per Share
• Outstanding safety performance
• Indonesia mining and mineral market remains buoyant
• Future Earning growth - driven by Mining Business Line
and PT Santan Batubara

*For the Years Ended 31 December 2007

PT Petrosea Tbk – Public Expose – 19 June 2008 32


Thank You
Questions?

PT Petrosea Tbk – Public Expose – 19 June 2008 33