Equipment and Manpower Overview 2019-2020

The document outlines the monthly plan for equipment and manpower for a construction project from September 2019 to December 2020. It lists the equipment types and quantities needed each month, along with their operational activities. It also lists the required manpower each month by role, including management, operations, and general labor roles. The plan has 12 pieces of equipment and between 33-51 workers needed each month to complete excavation, hauling, and embankment activities at the open pit, water treatment facility, and other areas of the construction site.

Uploaded by

Harold de Mesa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
294 views16 pages

Equipment and Manpower Overview 2019-2020

The document outlines the monthly plan for equipment and manpower for a construction project from September 2019 to December 2020. It lists the equipment types and quantities needed each month, along with their operational activities. It also lists the required manpower each month by role, including management, operations, and general labor roles. The plan has 12 pieces of equipment and between 33-51 workers needed each month to complete excavation, hauling, and embankment activities at the open pit, water treatment facility, and other areas of the construction site.

Uploaded by

Harold de Mesa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Monthly Plan: Equipment: Details the equipment required for monthly operations, including specifications for each type.
  • Monthly Plan: Manpower: Covers the manpower allocation for each month with a focus on different roles and responsibilities.
  • Operation Schedule 2019: Outlines the operation schedule for the year 2019, detailing tasks and timelines for different projects.
  • Operation Schedule 2020: Continues the scheduling of operations into 2020, showcasing project timelines and task allocations.

▣ Monthly Plan

1. Equipment

Operation 2019
Equipment Name Capacity
Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May

Caterpillar 1.0 cu.m Excavation 1 1 1 1 1 1 1 1 1

BackHoe Volvo 1.0 cu.m Hauling 1 1 1 1 1 1 1 1 1

Embankment/
Luigong 1.0 cu.m 1 1 1 1 1 1 1 1 1
Ditching

Sinotruck 20 cu.m (Howo) Hauling (Open Pit) 1 1 1 1 1 1 1 1 1

Chenglong 20 cu.m Hauling (Open Pit) 1 1 1 1 1 1 1 1 1

Dump Truck
Hauling
Hongyan 20 cu.m 1 1 1 1 1 1 1 1 1
(Embankment)

JAC 20 cu. M Hauling (Ditching) 1 1 1 1 1 1 1 1 1


Liugong 175HP 17 tons
Bulldozer operating weight Blade Excavation 1 1 1 1 1 1 1 1 1
capacity 4.5 cu.m

Liugong 10 tons operating


Compactor General 1 1 1 1 1 1 1 1 1
weight

Liugong 135 HP 13.5


Grader General 1 1 1 1 1 1 1 1 1
operating weight

Service Vehicle Ford Ranger/JAC General 1 1 1 1 1 1 1 1 1

Fuel Truck Isuzu General 1 1 1 1 1 1 1 1 1

Total 12 12 12 12 12 12 12 12 12

2. Manpower

Operational 2019
Manpower
Activities Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May
Management

Nic Solomon/ Nestor


Project Manager General 1 1 1 1 1 1 1 1 1
Matias

Mining Engineer Rizal Fabros General 1 1 1 1 1 1 1 1 1

Civil Engineer/Survey Aid Albon Gabiason General 1 1 1 1 1 1 1 1 1

Rose Parentila/ Noel John


HR General 1 1 1 1 1 1 1 1 1
Simpas

Accounting/Cashier Reyna Maximo General 1 1 1 1 1 1 1 1 1

Supervisor Lyslie Artillero General 1 1 1 1 1 1 1 1 1

Safety Officer Jerwin Cayangan General 1 1 1 1 1 1 1 1 1

Civil Foreman Harold de Mesa General 1 1 1 1 1 1 1 1 1

Operational Foreman Lino Joven General 1 1 1 1 1 1 1 1 1

Warehouseman Carl Sueno General 1 1 1 1 1 1 1 1 1

BH Operator 3 3 3 3 3 3 3 3 3
Dump Truck Driver 4 4 4 4 4 4 4 4 4

Compactor Operator 1 1 1 1 1 1 1 1 1

Grader Operator 1 1 1 1 1 1 1 1 1

Bulldozer Driver 1 1 1 1 1 1 1 1 1

Service Vehicle Driver 1 1 1 1 1 1 1 1 1

Mechanic General 2 2 2 2 2 2 2 2

Tireman General 1 1 1 1 1 1 1 1

Electrician General 1 1 1 1 1 1 1 1 1

Spotter 4 4 4 4 4 4 4 4

Mason/Carp/Steelman 6 6 6 6 6 6 6 6 6

Laborer (Local) 4 15 15 15 15 15 15 15 15

Cook General 1 1 1 1 1 1 1 1 1
Total 33 51 51 51 51 51 51 51 51
2020
Remark
Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 1

1 1

1 1

1
1

1 1

1 1

1 1

1 1

12 7 - - - - -

2020
Remark
Jun. Jul. Aug. Sep. Oct. Nov. Dec.
1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

3 3
4 4

1 1

1 1

1 1

2 2

1 1

1 1

4 4

6 6

15 15

1 1
51 50 - - - - -
▣ Monthly Plan
1. Equipment

Equipment Name Capacity

Caterpillar 1.0 cu.m

BackHoe Volvo 1.0 cu.m

Luigong 1.0 cu.m

Sinotruck 20 cu.m (Howo)

Chenglong 20 cu.m

Hongyan 20 cu.m

Dump Truck

JAC 20 cu. M
JAC 20 cu. M

Liugong 175HP 17 tons


Bulldozer operating weight Blade
capacity 4.5 cu.m
Liugong 10 tons operating
Compactor
weight
Liugong 135 HP 13.5
Grader
operating weight

Service Vehicle Ford Ranger/JAC

Fuel Truck Isuzu

Total
Operation 2019
Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr.
Ripping Rock Excavation and
1 1 1 1 1 1
Embankment(Open Pit)

Soil Excavation and Embankment (Open Pit) 1

Ditch Excavation and Removal of Surplus


Soil/Rock (Open Pit)

Excavation (WTF) 1 1

Ditch Excavation and Removal of Surplus


1
Soil/Rock(WTF AND LTSF)

Excavation of Soil (LTSF) 1 1

Ditch Excavation and Removal of Surplus


1
Soil/Rock(UTSF)

Embankment (Open Pit and Plant Area) 1

Embankment (LTSF) 1 1 1 1 1

Excavation (Clay Source to UTSF) 1

Excavation (Clay Source to Open Pit and


1
Plant Area)

Hauling (Open Pit) 1 1 1 1 1 1 1

Hauling (Open Pit) 1 1 1 1 1 1 1

Haulage of Excavated Soil (WTF to LTSF) 1 1 1

Haulage of Excavated Soil (LTSF) 1 1

Hauling (UTSF) 1

Hailage of Soil (From Clay Source) 1

Haulage of Excavated Soil (WTF to LTSF) 1 1 1

Haulage of Excavated Soil (LTSF) 1 1

Haulage of Excavated Soil (Clay Source to


1
UTSF)
Hailage of Soil (From Clay Source) 1

Excavation and Embankment 1 1 1 1 1 1 1

General 1 1 1 1 1 1 1

General 1 1 1 1 1 1 1

General 1 1 1 1 1 1 1

General 1 1 1 1 1 1 1

- 12 12 12 12 12 12 12
2020
Remark
May Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1
1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

12 12 12 - - - - -

1. Equipment 
Equipment Name
Capacity
Operation
2019
Sep.
Oct.
Nov.
Dec.
Jan.
Feb.
Mar.
Apr.
May
 BackHoe 
Caterpillar 1.0
Bulldozer 
Excavation
1
1
1
1
1
1
1
1
1
 Compactor 
General
1
1
1
1
1
1
1
1
1
 Grader 
General
1
1
1
1
1
1
1
1
1
 Service Ve
Management 
 Project Manager 
General
1
1
1
1
1
1
1
1
1
 Mining Engineer Rizal Fabros
General
1
1
1
1
1
1
1
1
1
 Civil Engin
Dump Truck Driver 
4
4
4
4
4
4
4
4
4
 Compactor Operator 
1
1
1
1
1
1
1
1
1
 Grader Operator 
1
1
1
1
1
1
1
1
1
 Bulldozer D
 Total 
     33      51      51      51      51      51      51      51      51
2020
Remark
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
     12        7         -         -         -         -                                         - 
2020
Re
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
4
4
1
1
1
1
1
1
1
2
2
1
1
1
1
4
4
6
6
15
15
1
1
     51      50         -         -         -         -                                         -