SAIC-A-1014 - Preweld Qualification of HDPE Welder

This document is a Saudi Aramco inspection checklist for preweld qualification of HDPE welders. It contains 3 acceptance criteria that must be passed: [1] Welds must be done by personnel trained in proper handling and usage of materials and equipment; [2] A training log must be maintained to document welder training; [3] Welders can only perform welds for which they received training and certification. The checklist will be used to inspect these criteria and ensure all requirements are met before welding begins.

Uploaded by

walid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
242 views1 page

SAIC-A-1014 - Preweld Qualification of HDPE Welder

This document is a Saudi Aramco inspection checklist for preweld qualification of HDPE welders. It contains 3 acceptance criteria that must be passed: [1] Welds must be done by personnel trained in proper handling and usage of materials and equipment; [2] A training log must be maintained to document welder training; [3] Welders can only perform welds for which they received training and certification. The checklist will be used to inspect these criteria and ensure all requirements are met before welding begins.

Uploaded by

walid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SAUDI ARAMCO ID/PID - 17-Mar-2016 - REV. 2015.07.00 (Standards Cutoff - July 2015) Rev. 2015.07.

00 31-Jul-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Preweld Qualification of HDPE Welder SAIC-A-1014 17-Mar-16 CIVIL -
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Preweld Qualification of Welder

Welds shall be done by personnel trained in the proper handling and Method
A1
usage of applicable materials and equipment Statement

A Training Log shall be maintained by the installation organization to


indicate the name(s) of the trained induviduals, the date of instruction, Method
A2
the instructor, product and the manufacturers name who issued the Statement
training certificate

Welders shall only perform welds on the material on which they received Method
A3
training and certificates. Statement

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-104 -- Wastewater Treatment, Reuse and Disposal, 28 December 2011

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use

You might also like