The document summarizes the excavation costs for the Hamud Biulding underground project. It lists 4 items: excavating top soil down to 1m for 320 cu.m at $3 per cu.m costing $960; deep excavating soil and rock down to 4m for 1088 cu.m at $4.20 per cu.m costing $4,569.60; leveling and compacting the 108.8 cu.m basement area at $12 per cu.m costing $1,305.60; and disposing of 1408 cu.m of material off-site at $1 per cu.m costing $1,408. The total cost of the excav
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
71 views1 page
Excavtion of Hamud Building
The document summarizes the excavation costs for the Hamud Biulding underground project. It lists 4 items: excavating top soil down to 1m for 320 cu.m at $3 per cu.m costing $960; deep excavating soil and rock down to 4m for 1088 cu.m at $4.20 per cu.m costing $4,569.60; leveling and compacting the 108.8 cu.m basement area at $12 per cu.m costing $1,305.60; and disposing of 1408 cu.m of material off-site at $1 per cu.m costing $1,408. The total cost of the excav