INTRODUCTION TO
SCAFFOLDING
WITH
KHALID FAROOQ KHATTAK
INTRODUCTION
OSHA DEFINITION
ANY TEMPORARY ELEVATED PLATFORM & ITS
SUPPORTING STRUCTURE USED FOR SUPPORTING
WORKMEN OR MATERIALS OR BOTH.
95,00 Workers injured and 80 killed each year in scaffolding related
accidents.
BASIC COMPONENTS
5 6
1 Column Upright
8
2 Ties
7
3 Bracing Faced
4 Cross Bracing
5 Hand Rail 4
6 Mid Rail
1
7 Toe Board 9
8 Platform
3
9 Fixed Coupler (90
Degree)
10 Swivel Coupler (360 Degree) 2
10
11 Base Plate
19
12 Bearer or Ledger 12
13 Tie Back
13
14 Joint Pin
14
15 Rest Deck 15
16 Ladder
17 Out Riggers 16
18 Binding Wires
19 Chain
11
17
CLASSIFICATION
CLASSIFICATION BASED ON TYPE
SCAFFOLDING
FIXED SCAFFOLD
SWINGING/SUSPENDED SCAFFOLD
MOBILE SCAFFOLD
ALLOY STEEL
CLASSIFICATION BASED ON LOAD
SCAFFOLDING
LIGHT DUTY 25 lb/SFT
MEDIUM DUTY 50 lb/SFT
HEAVY DUTY 75 lb/SFT
ALLOY STEEL
TUBE & COUPLER SCAFFOLDING
TUBE AND COUPLER SCAFFOLDS ARE SO-NAMED BECAUSE THEY
ARE BUILT FROM TUBING / PIPING CONNECTED BY COUPLING
DEVICES.
USAGE
For heavy loads
where multiple platforms must reach several stories high.
Their versatility, which enables them to be assembled in
multiple directions in a variety of settings, also makes them
hard to build correctly.
TUBE & COUPLER SCAFFOLDING
COUPLING DEVICES
FIXED COUPLER
Always use fixed coupler (90 coupler) for joining two
pipes together at right angles.
The fixed couplers are load bearing couplers.
SWIVEL COUPLER
Use swivel coupler (360 coupler) for joining two pipes
together at any angle through 360 degrees.
Never use swivel coupler for making a load bearing joint,
it is not designed for the purpose.
COUPLING DEVICES
JOINT PIN
Always use coupling pins (joint pins) to join scaffold
frames together in the vertical plane.
TOE-BOARD CLAMP
COUPLING DEVICES
BASE PLATE
Base plates are used to provide a flat bearing surface for
load distribution from column.
Two Types
Fixed
Adjustable
SCAFFOLDING GUIDELINES
GUIDELINES (BEFORE ERECTION)
Weight of worker, tools, material & equipment
Site conditions (Interior, Exterior, Floor/ Ground)
Anchorage Point
Height
Type of work
Duration
Weather condition including wind.
Pedestrian traffic through & under S/F
Access Means
Equipment / Structure configuration
Special erection / dismantling
GUIDELINES (FOUNDATION & SUPPORTS)
Scaffolds must be erected on surfaces, which can adequately
support all loads applied by the scaffold.
Compaction and Leveling
Replace soft soil with compacted gravel or crushed stone
Don’t use block / packing (bricks, short pieces of lumber or
scrape material) below base plate.
GUIDELINES (ERECTION & DISMANTLING)
Scaffolding material should be healthy and available.
Check for plumbing and leveling of platform
Ensure Bracing on vertical as well as horizontal plan
-Keeps the Frame Plumb and square
-Increase stability and Full Load carrying capacity
Coupling Devices
Base Plates
Hoisting Material
Dismantling
SCAFFOLDING ACCESS
FALL PROTECTION
Proper system for fall protection during assembling & dismantling
The lifeline can also be connected to the scaffolding ties, but this is a
compromising arrangement, because in erection / dismantling work, overhead
anchorage is not always available
SCAFFOLDING ACCESS Contd.
LADDERS
The ladders must be properly erected, with 1-1/2 foot
maximum distance between rungs.
Three-point contact should always be used when
climbing ladders. This means using two hands and one
foot or two feet and one hand to maintain contact with
the ladder at all times.
SCAFFOLDING ACCESS Contd.
LADDERS
Do not carry tools or materials by hand when climbing
ladders. Wear a tool belt and pouch and move materials up
or down by rope.
Rest stations should be decked in on scaffold towers
at intervals no greater than every 5 meters.
Debris, extension cords, and tools should be
cleared away from areas around the top and
bottom of ladders.
SCAFFOLD STABILITY
THREE TO ONE RULE
The ratio of unsupported height to least lateral dimensions on a
scaffold should not exceed 3 to 1, unless the scaffold is:
- Tied-back to the structure at proper horizontal and vertical
intervals.
- Equipped with outriggers to maintain the ratio of 3 to 1.
- Equipped with a properly designed
anchored guy wire system.
SCAFFOLD STABILITY
HOARDS
Scaffolds enclosed (hoarded) for welding jobs or sand blasting will
be subjected to significant wind loads. All the hoarded scaffolds
greater than 7.5 MR in height be designed by an engineer.
SCAFFOLD CHECKS
CHECKS BEFORE S/F ERECTION
Estimated load on the scaffold.
Sketch with dimensions.
List of scaffolding material required.
Inspection of the required material.
Safe transportation of scaffolding material.
Ground conditions.
Type of work done from scaffolding platform.
Live wires, hot pipes electrical / instrument lines / switches / panels
at scaffolding location.
Weather conditions (wind loading condition, rain etc.).
Tie-in locations and methods.
Site obstructions.
Valid work permit.
SCAFFOLD CHECKS
CHECKS DURING S/F ERECTION
Availability and use of personal protectives.
Availability and use of fall protection gear.
Plumbness of columns.
Ties inside the columns.
Bracing outside the columns.
Provide bracings on all sides.
Length, width and height of scaffolding frames according to the
standard.
LENGTH 8' MAX.
WIDTH 6' MAX.
HEIGHT 6'-6" (Between ties)
SCAFFOLD CHECKS
CHECKS DURING S/F ERECTION
Lowest tie 6" max. Above ground.
Ties extension outside the columns (4"-8").
Wooden planks extension outside the ties (9"-18").
Use of proper spanners.
Use of proper clamps / couplings on joints.
Tightening of all threaded joints.
Provide anchoring support (for scaffolds higher than 24').
Working platform closely boarded with planks.
All planks tied together and with ties using binding
wire/scaffolding pipes.
Provide handrail and mid rail.
Provide toe board.
SCAFFOLD CHECKS
CHECKS DURING S/F DISMANTLING
Availability and use of personal protectives.
Availability and use of fall protection gear.
Ensure proper sequence in dismantling (reverse of erection
method) to maintain stability of scaffold structure.
Safe lowering of material to ground.
Segregation of all fittings, pipes and planks.
Inspection of dismantled material & segregation of defective
material.
Proper stacking of sound material in salvage yard.
Housekeeping of the area.
FFC CHECKLIST
SCAFFOLDING CHECKLIST
(TO BE FILLED AFTER INSTALLATION OF SCAFFOLDING)
Date : Section:
Description of job :
YES NO N/A
1 All scaffolding columns are on base plate/wooden planks (for soft ground).
2 All ties provided. Distance between two ties is 6 ft. Lowest tie point is 6" above
ground.
3 Cross bracing provided properly.
4 Max. span and width of all distances on scaffolding structure is 8' x 6'.
5 Tie points extended 4" (minimum) outsitde the scaffolding structure.
6 All boards are extended 9"-10" (Minimum) outside the ties.
7 Scaffolding higher than 24' is properly supported with external structure or vessel.
8 Platforms properly close boarded & tied.
9 Hand railing and mid railing provided. (toe board provided, where required)
10 Wooden planks are in healthy condition.
11 Joint pins (Spigots) are provided for tightening of vertical pipes.
12 Precautions taken against fire if scaffolding is situated near some heat source.
Contractor Supervisor :
Area Engr. / End User :
SCAFFOLD CHECKS
STORING TECHNIQUE
SCAFFOLD ERECTION
The bearer is the name for the tube goes across the scaffold that the boards
rest on. The runner goes down the length of the scaffold. Lay these out and
stand up the first post. Clamp the runner to the post close to the base.
Clamp the bearer on at 90 degrees on top of the runner.
The bearer always goes on top of the runner for a safety
clamp backup effect.
After all four posts are attached, measure the scaffold from inside to
inside to insure the corner angles are at 90 degrees (square).
It is a good idea to attach a horizontal diagonal at this time to ensure that the
scaffold remains square. Make sure the legs are level and plumb as you go.
After insuring the first level or "wrap" is properly spaced, square, plumb, and
level, you may begin the second level. Do not exceed 6'6" to this second
level.
Attach the second level bearers and runners. Next, attach the diagonals. Swivel
clamps are used to attach these at an approximate 45 degree angle from level
to level. All four sides should have diagonal bracing attached.
Next put the planks for the second level on the bearers. Once the erector
climbs to the second level, he will be exposed to a fall hazard and should
take additional Precautions and use fall protection equipment.
Attach a ladder for access to the second level. Install the guardrails,
midrails, and toeboards. Secure the planks to the bearer.
A view of the planks secured by the toeboard being wired to the
bearer.
UNSAFE WORK PRACTICES
UNSAFE WORK PRACTICES
Do not work from a scaffold
if it is not been inspected
that workshift and is tagged
as "Approved, Ready To
Use".
Do a visual inspection for
the obvious requirements
such as ladder access, full
planking, guardrails,
plumbness, rigidity, etc.
UNSAFE WORK PRACTICES Contd.
Do not use a scaffold if it
does not have a proper
ladder or other equivalent
safe means of access.
Do not climb the scaffold
itself.
UNSAFE WORK PRACTICES Contd.
Do not use a scaffold if
the working platform is
not planked all the way
across.
Do not use a scaffold if
only one or two planks
are placed where there
should be more.
UNSAFE WORK PRACTICES Contd.
Do not use a scaffold if
the planks are not scaffold
grade, bearing the proper
grade stamp.
If the planks are man
made, make sure they are
in good condition.
UNSAFE WORK PRACTICES Contd.
Do not use a scaffold if the
planks are bowing more
than 1/60 of their span.
UNSAFE WORK PRACTICES Contd.
Do not use a scaffold if it is
not plumb, square, and rigid..
UNSAFE WORK PRACTICES Contd.
Do not use a scaffold taller
than 4 times it's minimum
base unless it is tied, guyed,
or braced to prevent tipping.
UNSAFE WORK PRACTICES Contd.
Do not climb the scaffold
other than by the safe
means of access provided.
Never climb guardrails.
UNSAFE WORK PRACTICES Contd.
Do not work if you feel
weak, sick, or dizzy.
Never use drugs or
alcohol on a scaffold.
UNSAFE WORK PRACTICES Contd.
Do not climb with
slippery shoes.
UNSAFE WORK PRACTICES Contd.
Do not carry materials
as you climb.
Keep both hands on
the siderails.
UNSAFE WORK PRACTICES Contd.
Do not jump on to
planks or platforms.
UNSAFE WORK PRACTICES Contd.
Do not use scaffolds during
storms, rain, or high wind
(25 MPH and above).
UNSAFE WORK PRACTICES Contd.
Do not work on ice or
snow covered platforms.
UNSAFE WORK PRACTICES Contd.
Do not allow tools, material,
or debris to accumulate on
the platforms and cause a
hazard.
UNSAFE WORK PRACTICES Contd.
Do not alter the scaffold.
Scaffold alterations may
only be performed by a
trained crew under the
supervision of a competent
person.
UNSAFE WORK PRACTICES Contd.
Do not use heat producing
activities such as welding or
insulation removal without
taking precautions to protect
the scaffold members.
UNSAFE WORK PRACTICES Contd.
Do not work if you notice
any components which are
damaged.
UNSAFE WORK PRACTICES Contd.
Do not attempt to extend
working heights by planking
guardrails or by the use of
boxes or ladders on
scaffold platforms.
UNSAFE WORK PRACTICES Contd.
Do not use scaffold as
material hoist towers or for
mounting derricks unless
the scaffold is designed for
such use.
UNSAFE WORK PRACTICES Contd.
Do not bridge between
towers with planks or
stages unless the
scaffold assembly has
been designed for this
use by a qualified
person.
UNSAFE WORK PRACTICES Contd.
Do not violate clearances
from electrical power lines
UNSAFE WORK PRACTICES Contd.
Do not overload the platform
by more than it's intended
uniform loading.
UNSAFE WORK PRACTICES Contd.
Do not overload the
scaffold by point
loading a plank above
it's capacity.
UNSAFE WORK PRACTICES Contd.
Do not bridge between
two scaffolds by stages
unless designed by a
qualified person.
UNSAFE WORK PRACTICES Contd.
Do not use the scaffold
unless the proper falling
object protection for the
users and workers below
has been provided.
UNSAFE WORK PRACTICES Contd.
Do not use rolling towers
unless the wheels are locked.
UNSAFE WORK PRACTICES Contd.
Do not ride rolling towers
while they are being moved.
UNSAFE WORK PRACTICES Contd.
Do not get up on a scaffold
unless you have successfully
completed this training.
BAD SCAFFOLD PRACTICES
BAD SCAFFOLDING PRACTICE
Bad planking: Lots of daylight is visible through the splits, cracks and gaps
BAD SCAFFOLDING PRACTICE
No guardrails on the open ends of this scaffold. (Note: The employee was stepping
backward at the time this photo was taken.)
BAD SCAFFOLDING PRACTICE
Gaps as big as three feet where the scaffold platform goes around the
column create fall hazards. There are also no midrails or toeboards.
BAD SCAFFOLDING PRACTICE
Safe access for mobile scaffolds? Note
the trip hazards caused by tools and
power cords.
This scaffold is inside a clarifier tank
at a water treatment plant under
construction, and is erected over an
approximately 4-foot x 10-foot floor
opening, which adds another 10 feet
to the fall height (6 feet + 10 feet = 16
feet)
BAD SCAFFOLDING PRACTICE
A contractor attempted to install these cross braces AFTER the scaffold was
erected. The cross braces did not fit, and so the contractor used Mason's String
to secure them. The braces did not fit because the scaffold legs bent/bowed
under pressure, and without the cross braces in place, they went out of
plumb!
BAD SCAFFOLDING PRACTICE
This is a great example of what can happen when construction workers fail to
investigate the site where their scaffold is being erected, and base plates are not
used. The workers failed to realize that the sidewalk was only made from blacktop,
and it had a basement under it. EXAMPLE OF POINT LOADING!!
BAD SCAFFOLDING PRACTICE
Erected on an uneven and
unstable surface (e.g., scrap and
debris),
without base plates
loaded with block! This scaffold
can collapse at any time and
strike any employees walking by!
BAD SCAFFOLDING PRACTICE
DEATH OF A SCAFFOLDER
BAD SCAFFOLDING PRACTICE
BAD SCAFFOLDING PRACTICE
BAD SCAFFOLDING PRACTICE
BAD SCAFFOLDING PRACTICE
SHORTCUT
COLLAPSED SCAFFOLDING
COLLAPSED SCAFFOLDING
COLLAPSED SCAFFOLDING
THE END