Architecture. Engineering. Consulting.: HWP Company Profile Focus On Health Care
Architecture. Engineering. Consulting.: HWP Company Profile Focus On Health Care
2013
.
Company Profile
Short Introduction
Multidisciplinary Since the foundation of HWP in 1970, HWP has identified the growing
holistic approach complexity of architectural and planning topics. Due to this the fast changing
requirements of its customers deriving from macro-environmental factors e.g.
economy, society, culture, technology, environment, politics and legal aspects.
Establishing an innovative, multidisciplinary approach since its foundation,
HWP has always anticipated and provided highly customer-oriented solutions
with a competitive advantage for the customers.
Regional focus: HWP started to act internationally early in 1970s: Today, the foreign business
- Europe accounts for approximately 40 percent of HWP's turnover. The regional focus of
- Middle East North the international business concentrates on Europe, the Middle East North
Africa Africa and Asia and is symbolised by subsidiary companies in Turkey, Egypt
- China and Libya as well as by a long-standing local partnership in China.
Staff as success factor HWP's 170 employees are highly qualified with extraordinary professional and
practical backgrounds deriving from many different professions: architects,
engineers, project managers, natural scientists, medical doctors and medical
staff, IT specialists, experts in economics, public administration and sociology.
Furthermore, every employee is characterized by an open mindset and cultural
sensitivity, often developed by professional experiences abroad. Our employees
come from more than 15 countries and speak 20 languages.
Company Profile
Short Introduction
Core competencies HWP's expertise is grouped in the following four divisions offering bundled
bundled in four services along the whole project lifecyle or single services corresponding to the
divisions project requirements:
- Architecture and Engineering
- Project Management
- Management Consultancy and Operational Planning
- Medical and Laboratory Engineering
Assignments HWP handles planning and construction projects from all over the globe, with a
focus on clients in:
- Health care
- Education and research
- High-tech industrial construction and plant engineering
- Logistics
- Commerce
- Public authorities and service providers
- Leisure, sport, housing
Focus customer Due to the four complementary structured divisions, we are highly specialized
industries and typical in planning and realizing complex projects in: health care, education and
HWP projects research as well as in high-tech industries. The HWP Group offers outstanding
international experience in planning and realizing of university hospitals,
special clinics, rehabilitation clinics, research institutions, universities as well
as plants for the biotechnological and pharmaceutical industry.
Company Profile
Commitment to sustainability
Active membership at Due to the four complementary structured divisions and to the interdis-
German Sustainable ciplinary approach, HWP offers holistic and sustainable planning solutions.
Building Council
To underline HWP's commitment to sustainable planning, HWP is an active
member at German Sustainable Building Council (German: Deutsche
Gesellschaft für Nachhaltiges Bauen e.V., short: DGNB). This sustainability
approach has more than an ecological or "green" facet:
1. Environmental quality
2. Economic quality
3. Sociocultural and functional quality
4. Technical quality
5. Process quality
6. Site quality
We can call on software tools for project management which have been deve-
loped by ourselves in-house. We offer sound branch-specific knowledge, above
all in the fields of health care, higher education, construction of industrial and
office buildings as well as department stores.
Medical and Laboratory Engineering
At HWP the planning for medical and laboratory equipment takes place in close
multidisciplinary cooperation between our experts for operational and organisational
planning, doctors, medical staff, architects and engineers from our own company.
The use of sophisticated IT tools provides certainty in terms of planning, programme
and costs at an early stage in the project.
Diagnostic-Internal-Neurological Centre
of University Hospital Carl-Gustav-Carus
of Technical University Dresden
Involved divisions:
Architecture and
Engineering
Architectural services:
st
Competition (1 prize)
Planning
Tendering for general
contractors
Accompanying
construction planning
Project supervision
Involved divisions:
Management Consultancy
and Operational Planning
Review and consultancy of
functional design structure
Architecture and
Engineering
Architectural and
engineering services -
conceptual study,
preliminary design,
architectural and interior
design
(Joint Venture with HOK
Architects, New York)
Involved divisions:
Architecture and
Engineering
Architectural services:
Planning
Tendering
Project supervision
Management Consultancy
and Operational Planning
Operational planning
services
Involved divisions:
Architecture and
Engineering
Architectural and
engineering services
Planning
Tendering
Project supervision
Project Management
Project management
services
Management Consultancy
and Operational Planning
Site study
Functional and single room
program
Involved divisions:
Architecture and
Engineering
Architectural and
engineering services:
Planning
Tendering
Project supervision
Involved divisions:
Architecture and
Engineering
Architectural services:
Planning
Tendering
Project supervision
Project Management
Project management
services
Management Consultancy
and Operational Planning
Operational and
architectural development
planning
Functional and single room
program
Involved divisions:
Architecture and
Engineering
Planning
Tendering
Project supervision
Health and safety coordi-
nation
Involved division:
Architecture and
Engineering
Competition (1st prize)
Planning
Tendering
Project supervision
Projektmanagement
Project management
Involved divisions:
Architecture and
Engineering
Architectural services:
Planning
Tendering
Project supervision
Project Management
Project management
services
Client's Representative
Management Consultancy
and Operational Planning
Operational planning
services
Involved divisions:
Project Management
Project management
services (in cooperation
with Drees & Sommer
GmbH, lead management:
HWP)
Management Consultancy
and Operational Planning
Operational planning
services
Feasibility study incl. site
study
Planning of resources
Space programming
Cost estimation
Functional and single room
program
Logistics concept
Organisation of
architectural competition
Client ............................................................................................... The regional capital of Stuttgart
Location ................................................................................................................ Stuttgart, Germany
Duration ........................................................................................................................... 2000 to 2012
Function .......... Paediatric-surgical high density health care service provider, amalgamation
........................ of the gynaecological hospital with paediatric healthcare facilities in a Centre
................................ of Perinatal Medicine, physiotherapy and ergotherapy facilities, centre of
............................................. socio-paediatric medicine, paediatric radiology, central laboratory
Figures .............................................................................................. 7 operating theatres, 400 beds
Costs .............................................................................................................. approx. 268.5 Mill. EUR
GFA ......................................................................................................................................... 93,000 m²
Reference . Mr. Klenk, Dir. of Municipal Building Department, Phone +49(0)711 216-89822
................................ Prof. Dr. Krier, Director, Klinikum Stuttgart, Phone +49(0)711 2783-2007
Schwarzwald-Baar Hospital Villingen-Schwenningen,
New Building of a Hospital for Central Medical Care
Involved divisions:
Project Management
Project management
services
(in cooperation with
Drees & Sommer GmbH)
Involved divisions:
Management consultancy
and operational planning
Preparation and processing
of the architectural
competition;
Operational planning and
consulting on the central
operation unit and
laboratories
Involved divisions:
Involved divisions:
Architecture and
Engineering
Master plan
Consulting on architectural
and mechanical
engineering services
(design and execution
drawings)
Management Consultancy
and Operational Planning
Operational planning
services
Assistance in functional
and single room program
Involved divisions:
Architecture and
Engineering
International competition
th
(4 prize)
Involved divisions:
Architecture and
Engineering
International competition
st
(1 prize)
Architectural services
(planning)
Management Consultancy
and Operational Planning
Operational planning
services
Involved divisions:
Architecture and
Mechanical Services
Master plan and opera-
tional and architectural
development planning incl.
infrastructure for the
whole university
st
1 realisation phase:
Architectural and engi-
neering services
(planning)
Management Consultancy
and Operational Planning
Participation in the
conception of the whole
university in cooperation
with the University of
Maastricht
Strategic consulting
Operational conception Client .................................. Sulaiman Bin Abdul Aziz Al Rajhi Charitable Foundation, Riyadh
Functional and single room Location ............................................................................ Al Bukairiyah, Al Qassim, Saudi Arabia
st
program Duration ...................................................................................... 1 realisation phase 2007 to 2011
st
Function ............................................... 1 building phase: Medical University (6,000 students)
.................................................................. with teaching hospital (1000 beds) incl. infrastructure,
Medical and Laboratory .......................................................................................................central facilities and housing area;
Engineering .......................................................................................... non-medical university (10,000 students)
Planning of medical and Figures ........................................................................................................... 16,000 students totally
laboratory equipment GFA ...................................................................................................................................... 750,000 m²
Reference ........................................................................... Prof. Al-Damegh, Al Qassim University
.............................................................................................................. Phone +966 (0)66 555000994
Centres of Excellence
Involved divisions:
Architecture and
Engineering
Master plan
Architectural and
engineering services
(planning)
Quality and quantity
specifications
Quality control
Management Consultancy
and Operational Planning
Operational planning
services
Functional and single room
program
Involved divisions: .
Architecture and
Engineering
Conceptual study
Master plan
Design Planning
Execution drawings
Building permission
application
Tendering
Management Consultancy
and Operational Planning
Planning of resources
Organisational structure
and process planning
Functional and single room
program
Healthcare logistics
Dynamic process
simulation and
optimisation
Medical and Laboratory Client ............................................................................. Istanbul Project Coordination Unit (IPCU)
Engineering Location ..................................................................................................................... Istanbul, Turkey
Planning and tendering of Duration ........................................................................................................................... 2010 to 2011
medical and laboratory Function ........................... Functional diagnostics, 27 operation theatres, intensive care unit,
equipment .......................... central sterilisation, inpatient departments, oncological centre of excellence,
IT Solutions ....................... teaching areas, logistics, underground parking (capacity approx. for 990 cars)
Figures ..................................................................................................................................... 866 beds
Costs .................................................................................................................................... confidential
GFA ...................................................................................................................................... 235.000 m²
Reference ........................................................ Mr. Tüfekci, BCE , MSC, Project coordinator IPCU
....................................................................................................... Phone (0090 212) 518 55 00 -254
Göztepe Training and Research Hospital
Involved divisions:
Architecture and
Engineering
Conceptual study
Master plan
Design Planning
Execution drawings
Building permission
application
Tendering
Management Consultancy
and Operational Planning
Planning of resources
Organisational structure
and process planning
Functional and single room
program
Healthcare logistics
Dynamic process
simulation and
optimisation
Managing directors:
Rose-Marie Vogt, Dipl.-Kfm.
Norbert Leopold, Dr.-Ing. Dipl.-Kfm.
Frank Wachholz, Dipl.-Ing., Architect
Matthias Kammer, Dipl.-Ing.
Supervisory board:
Hartmut Katherey, Dipl.-Ing., Architect
Extraction of project list:
Health sector
2009 2009
El Araby Institute for Nursing and Applied Medical Heart centre Bad Krozingen, new building of a centre
Sciences, Menoufia, Egypt for cardiovascular surgery
Technical feasibility study and operational conception Operational planning services and conceptual study
for the nursing institute Heart centre Bad Krozingen
El Araby Association for Social Development, Cairo
2009
2009 - 2011 Konstanz Hospital, reconstruction and extension of
University Hospital of Ernst Moritz Arndt University of Konstanz Hospital and Vincentius-Hospital
Greifswald, 6th ward tower Review of design planning and cost estimation
Architectural services; Planning, tendering and project Konstanz Hospital
supervision of medical, laboratory and
mechanical/electrical equipment (in cooperation with 2009 - 2010
GTB Berlin) Klinikum Stuttgart, Sana Clinic for Cardiac Surgery,
Federal State of Mecklenburg-West Pomerania heightening of an intensive care ward, a ward and a
hybrid operating theatre
2009 - 2010 Project controlling
Klinikum Stuttgart
Extraction of project list:
Health sector
2007 - 2008 for the cafeteria and central kitchen (in cooperation
Deaconess Hospital Stuttgart, urological outpatient with Drees & Sommer GmbH, Stuttgart)
department Klinikum Stuttgart
Construction drawings, tendering and project
supervision of medical and laboratory equipment 2007 - 2008
Diakonie-Klinikum Stuttgart, Hospitals of the District of Esslingen
Diakonissenkrankenhaus und Paulinenhilfe gGmbH, Analysis and assessment of strategic development
Stuttgart potentials
Hospitals of the District of Esslingen
2007
New building and renovation of Deaconess Foundation 2007 - 2013
Hospital Speyer New building "Paulinenpark Stuttgart"
Functional and single room program Architectural and engineering services; Project
Diakonissen-Stiftungs-Krankenhaus Speyer gGmbH management
Foundation Heilanstalt Paulinenhilfe für orthopädisch
2007 Kranke, Stuttgart
Public health service facilities in Libya
Organisational, technical and architectural review and 2007
assessment Neurological rehabilitation centre, Wiesbaden
Organization for Development & Administrative Examination of two possibilities for the extension of
Centers (ODAC), Tripolis the outpatient day clinic
NRW Neurologisches Reha-Zentrum Wiesbaden GmbH
2007 - 2008
Ludwigsburg Hospital, reconstruction of ward building 2007 - 2008
floor No. 14, 15/16 and of central air-conditioning Paracelsus-Hospital, Ruit, Ostfildern, reconstruction of
equipment laboratory for cytostatics and of CT
Project management and client's representative Conceptual design
Kliniken Ludwigsburg-Bietigheim gGmbH Paracelsus-Hospital Ruit, Ostfildern