RESUME
SHAHBAZAHMED
WELDING,PIPING,NDT,PAINTING,
REFRACTORY INSPECTOR
Mobile: +92345-8665955 /+92304-5025311
Email: [email protected]
Objective:
To get a chance of working in a dynamic organization, where my education, Strong aptitude for learning,
Presentation & analytical problem solving, Technical skills & ability would be utilized & I shall have an
opportunity to improve on it.
Qualification:
D.A.E (Mechanical) Govt Polytechnic Institute Sargodha ( P.B.T.E LAHORE )
Computer Skills:
Engineering Software: PWMS, Navis Works, AutoCAD
Operating Systems: Windows 98/2000/XP
Others: MS Office (Word, Excel, Power Point)
Professional Qualification:
1 Level - II Radiography Testing (SNT-TC-1A)
2 Level - II Penetrant Testing (SNT-TC-1A)
3 Level - II Magnetic Particle Testing (SNT-TC-1A)
4 Level- ll Ultrasonic Testing (SNT-TC-1A)
5 Level- ll Visual Testing (SNT-TC-1A)
WORK EXPERIENCE / DUTIES
In General
0. Over 14 years of experience in inspection field in the Oil-Gas
Refining, Petrochemical, Power Plant and Heavy Industrial sectors
1. Ensure that the quality plan is implemented and the activities
meet contractual requirements, applicable codes, specification and
standards.
2. Liaison with Company, Contractors, and Construction
supervision staff to ensure project quality objectives are attained.
1
RESUME
3. Review of Contractor quality procedures including welding
procedure specifications.
4. Experienced in inspection of piping fabrication, installation,
welding and testing and walkthrough in compliance with applicable
ASME Codes and Project Specification.
5. Experienced in interpretation of radiograph, PWHT chart and
pressure test graph.
6. Extensive experience in inspection of field installation, leveling
and alignment of centrifugal/positive displacement pumps,
compressors, steam and gas turbines and blowers.
7. Experienced in inspection of steel structure installation and bolt
tightening.
8. To participate in Progress / Construction, Punch list and Quality
Control meetings.
9. Preparation of daily/weekly inspection reports, monitoring of
submission of inspection reports system wise to certification.
10. Take part in Quality Control audits and preparation of
finding/reports.
11. Well versed with international codes and standards such
as of ASTM, ASME and API and Client Specifications.
In Piping/ Welding Discipline
12. Witness / conduct Welder Qualification Test in plate and
pipes in accordance with Welding
Procedure Specification (WPS) / ASME IX, review performance test
certificate and monitor their continuity records.
13. Surveillance over storage, handling, fit-up and welding of
pipe spools in fabrication shop and at field to ensure compliance of
materials, dimensions and welding parameters (joint fit-up, welding
preheat and inter-pass temperature, welding consumables) to
applicable Drawings, WPS and project specification.
14. Inspection of installation of piping and piping components
with reference to isometric drawing, plot plan and P&ID. Verifying
valves, orifice, strainers for correct type, rating, installation and
direction.
2
RESUME
15. Inspection of flanged connection for alignment, correct
gasket / bolt material and torque.
16. Monitor weld repairs to ensure its compliance with
approved repair procedure.
17. Review of test packs to ensure QCP/ITP compliance and
completion of welding and testing as required. Punching of
outstanding/non-conforming items.
18. Carry out walk down/line check prior to pressure testing of
piping circuit and punch the line as required. To verify the completed
punch list items and signing off.
19. Witnessing of Hydrostatic pressure test and Pneumatic
test of piping circuit test pack wise.
20. Witnessing of pre-commissioning activity for cleanliness,
drying, dew point verification and lay-up of piping system after
testing.
21. Conducting final walkthrough for piping system and
entering incomplete items is Mechanical performance and close out
system.
22.Issuing of violations (discrepancy report) or NCR, if non-
conformance with applicable specification/document found.
In Static Equipment Discipline
23.Inspection of static equipment's such as Columns, Drums, Heat
Exchangers, Reactors, Filters, Packaged skids fabrication,
Installation, Orientation, Alignment, Leveling, Verticality and Final
closure/ Box-up Inspection.
24. Inspection of internals such as internal trays, random/flexi
packing, demister, and distributors for material verification,
installation, leveling, alignment and bolt torque.
25. Inspection of Flare and Derrick structure for positioning,
alignment, Burner installation, bolt tightening check by torque and
direct tension indicator (DTI) method.
26. Inspection of field assembled and erected API Storage tanks for
material verification, installation, roundness, plumpness, and peaking,
banding, vacuum box testing of bottom plates, leak testing and final
closure.
3
RESUME
Professional Experience
ON BEHALF OF SGS (PAKISTAN)
CLIENT
PARCO Qasba Gujrat
PROJECT WHITE OIL MOGAS PROJECT
DESIGNATION TPI Inspector/ PIPING,WELDING INSPECTOR
DURATION FROM March 2018 To date
ON BEHALF OF TUV AUSTRIA (PAKISTAN)
CLIENT
UEP
PROJECT NAIMAT BISAL GAS PLANT
DESIGNATION TPI Inspector / PIPING,WELDING INSPECTOR
DURATION FROM Jan 2017 Feb 2018
ON BEHALF OF BYCO OIL REFINERY (PAKISTAN)
CLIENT
BYCO OIL REFINERY
PROJECT FURNACE OF BYCO OIL REFINERY
DESIGNATION Client Inspector / PIPING,WELDING INSPECTOR
DURATION FROM March 2016 TO Dec 2017
ON BEHALF OF SGS (PAKISTAN)
CLIENT
FAUJAI FERTILIZER BIN QASIM KARACHI
PROJECT FPCL
DESIGNATION TPI Inspector/ PIPING,WELDING INSPECTOR
DURATION FROM 11 July 2015 TO Feb 2016
ON BEHALF ATL (PAKISTAN)
CLIENT
HYUNDAI/ARL
PROJECT ARL UPGRADATION PROJECT
DESIGNATION PIPING,WELDING INSPECTOR
DURATION FROM 28 May 2014 TO 30 June 2014
ON BEHALF OF INSPECTEST INDUSTRIAL SOLUTION (U.A.E)
DESCON/ARABIAN GAS/SHAH GAS/PETROFAC
CLIENT
PROJECT DESCON/ARABIAN GAS/SHAH GAS/PETROFAC
DESIGNATION PIPING,WELDING INSPECTOR
4
RESUME
DURATION FROM 30 JUNE 2013 TO 20 May 2014
ON BEHALF OF SGS PAKISTAN
Shell Pakistan
CLIENT
PROJECT Shell Terminal Peshawer
DESIGNATION PIPING INSPECTOR
DURATION FROM 06 June -2013 to 12 june 2013
ON BEHALF OF EITMAAD ENGINEERING (QATAR)
DOLPHIN ENERGY
CLIENT
PROJECT RAS LAFAN INDUSTRIAL ESTATE
DESIGNATION WELDING INSPECTOR
DURATION FROM 29 NOV 2012 TO 26 May-2013
ON BEHALF OF JIACCO PAKISTAN
ENGRO
CLIENT
PROJECT ENGRO FERTELIZER DAHAI (SINDH) SHOUT DOWN
DESIGNATION PIPING INSPECTOR
DURATION FROM 04 Oct -2012 to 16 Oct 2012
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
Descon PUNJ LLOYD LIMITED / ADCO
CLIENT
PROJECT MIRFA ENGINEERING ,PROCUREMENT & CONSTRUCTION FOR TIE-IN WORKS AT SE
DESIGNATION PIPING/ WELING INSPECTOR
DURATION FROM Feb-2012 to 15 Aug 2012
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
CLIENT Descon DESCON / GASCO/JGC/TECNIMONT
PROJECT MIRFA Fabrication of piping for IGD Habshan-5 AMW(Abu Dhabi- Ruwais) UAE
DESIGNATION WELDING INSPECTOR
DURATION FROM Feb-2011 to Feb. 2012
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
CLIENT Descon DESCON / GASCO
PROJECT MIRFA BOROUGE III PRE PIPINGFABRICATIONS. AMW(Abu Dhabi- Ruwais) UAE
DESIGNATION PIPING INSPECTOR
DURATION FROM Jan-2011 to Feb. 2012
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
CLIENT Descon DESCON / CBI / GASCO
5
RESUME
PROJECT MIRFA GASCO TRAINS 4 PIPING FABRICATIONS. AMW(Abu Dhabi- Ruwais) UAE
DESIGNATION PIPING INSPECTOR
DURATION FROM FEB-2011to AUG- 2011.
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
CLIENT Descon DESCON / ADCO
PROJECT MIRFA Bechtel HabshanFabrication of CS Piping AMW(Abu Dhabi- Ruwais) UAE
DESIGNATION WELDING / PIPING INSPECTOR
DURATION FROM NOV-2010to JAN- 2011.
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
CLIENT Descon DESCON / LINDE/ELIXIER/GASCO
PROJECT MIRFA-1 AIR SEPRATION PLANT FOR NITROGEN GENERATION Fabrication of CS Piping
AMW (Abu Dhabi- Ruwais) UAE
DESIGNATION
WELDING / PIPING INSPECTOR
DURATION FROM JAN-2010to NOV- 2010.
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
CLIENT Descon / Pun lioyd/Borough
PROJECT Fabrication of Stainless Steel & CS Piping AMW(Abu Dhabi- Ruwais
DESIGNATION WELDING / PIPING INSPECTOR
DURATION FROM Sep-2009 to Jan 2009.
ON BEHALF OF LONESTAR TECHNICAL SERVICES U.A.E
PROJECT EMAL (Emirates Aluminum)
CLIENT ETA STAR
DESIGNATION QC Inspector
DURATION FROM June-2009 to 25-Sep-2009
ON BEHALF OF NATIONAL SERVICES LTD ,PAKISTAN.
PROJECT KFGCS Project Pakistan.
CLIENT CPFCC China
DESIGNATION Site In charge
DURATION FROM March-2009 to 10-June-2009
PROJECT KAPCO Project Pakistan
CLIENT KAPCO Pakistan LTD
DESIGNATION Site In charge
DURATION FROM January-2009toMarch-2009.
PROJECT ENGRO FOOD PROJECT Pakistan
CLIENT Dyconex Engineering Ltd / ENGRO FOOD,S LTD
DESIGNATION Site In charge
DURATION FROM October-2008toDecemeb-2008.
6
RESUME
PROJECT DDFC Project Lahore, Pakistan
CLIENT DDFC Engineering Ltd Pakistan
DESIGNATION Site In charge
DURATION FROM August-2008toOctober-2008.
PROJECT Pak Arab Fertilizer Pvt, Ltd Multan (Pakistan)
CLIENT Dyconex Engineering Ltd
DESIGNATION Site In charge
DURATION FROM 03-July-2008toAugust-2008.
DESCON ENGINEERING LTD PAKISTAN
PROJECT DEW Lahore, Pakistan
CLIENT DESCON. Pakistan
DESIGNATION QC inspector
DURATION FROM Jan-2008 to Dec-2008
INSPECTEST PVT LTD , PAKISTAN .
PROJECT CHANDA Gas Field, UC H Power Plant, BHP ZAMZAMA Gas Plant Phase 2
CLIENT Siemens Pakistan Ltd
DESIGNATION NDT Inspector
DURATION FROM July-2007to 20-Jan-2008
INSPECTEST PVT LTD , PAKISTAN .
PROJECT DESCON Engineering Workshop Lahore Pakistan
CLIENT DESCON ENGG PAK Ltd
DESIGNATION NDT Inspector
DURATION FROM 11-Aug-2005 to July-2006
Personal information:
Father's name LAL KHAN
Date birth 04-04-1987
Place of birth SARGODHA
Nationality Pakistani
Identity card # 33203-2640244-3
7
RESUME
Passport # AD 8022441
Marital status Married
Sex Male
Current Position THIRD PARTY INSPECTOR SGS (PAKISTAN)
Postal Address New Settlite Town ,Sheraz park Street no,3 Sargodha Pakistan