(Min. of 0.33qc or 30kg/cm ) : Calculation of Rock Socketing Length

This document calculates the pile capacity for abutments A1 and A2 according to IRC:78-2014 Section 9.2. It determines the rock socketing length is 2.4 meters, which meets the minimum requirement of 2 meters. Stress along the socket length is calculated to be 155.6 tonnes/m2, which is less than the permitted 300 tonnes/m2. The resistance force at the top of the socket is determined to be 161.7 tonnes/m. Rotation at the socket top is calculated to be 0.00007 radians, which is less than the allowed 0.0002124 radians.

Uploaded by

vivek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
337 views1 page

(Min. of 0.33qc or 30kg/cm ) : Calculation of Rock Socketing Length

This document calculates the pile capacity for abutments A1 and A2 according to IRC:78-2014 Section 9.2. It determines the rock socketing length is 2.4 meters, which meets the minimum requirement of 2 meters. Stress along the socket length is calculated to be 155.6 tonnes/m2, which is less than the permitted 300 tonnes/m2. The resistance force at the top of the socket is determined to be 161.7 tonnes/m. Rotation at the socket top is calculated to be 0.00007 radians, which is less than the allowed 0.0002124 radians.

Uploaded by

vivek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CALCULATION OF PILE CAPACITY AS PER IRC:78-2014 Cl 9.

2 ABUTMENT A1 and A2
CALCULATION OF ROCK SOCKETING LENGTH

Dia.of Pile (B) = 1.2 m


Thikness of Pile cap = 1.8 m
Length of Pile m
(from rock lvl to pilecap
9.650
center) (L) =
Grade of Concrete 35 Mpa
= (Eq. A2-5, IRC-112:2011)

Elastic Modulus of Concrete (Ec)


3230825
=
Moment of Inertia of Pile (Ip) = 0.1018 m4
Unconfined Compressive t/m² (as per geotech report)
1000.00
strength of Rock (qc) = (considering 10 Mpa for safer side)
Perm. Comp. strength of the t/m² (min. of 0.33qc or 30kg/cm²)
= 300.0
intact rock
Max. axial Load (Qmax) = 550.00 t (at top of rock level)
Lateral Force per pile (H) = 30.00 t (at top of rock level)
Moment at the socket top (M) = 131.25 tm (at top of rock level)

H
(As per IRC amendment march'11, pile is assumed as pinned at top of socket to find
allowable rotation)

HL² / (2E I )
θ = c p
= 30X9.65^2/2X3230825X0.101787601976309
= 0.004248 radians
Permissible Rotation is 5% of 0.004248 radians
= 0.0002124 radians
Calculation of Socket Length
L = ( 2 H / σ D ) + [ ( 4 H² / σ ² D² ) + ( 6 M / σD ) ] ½

= (2X30/300X1.2)+[(4X30^2/300^2X1.2^2)+(6X131.25/300X1.2)]^1/2
= 1.65505 m
Provided Ls = 2.4000 m 2D (min) OK
Stresses along socket length
σmax = [H/(LsD)] + [6M / (Ls²D)] + [6H (Ls/2) / (Ls²D)]

= [30/(2.4X1.2)] + [6X131.25/(2.4^2X1.2)] + [6X30X(2.4/2)/(2.4^2X1.2)]


= 155.599 t/m2 < 300.0 t/m2 HENCE OK

σmin = [H/(LsD)] - [6M / (Ls²D)] - [6H (Ls/2) / (Ls²D)]

= [30/(2.4X1.2)] - [6X131.25/(2.4^2X1.2)] - [6X30X(2.4/2)/(2.4^2X1.2)]


= -134.766 t/m2 M

Resistance along socket length 155.599 186.7188


h= 1.3

Pmax = σmax D 0.172


A A
Socket length of pile

2.4000

= 155.598958333333X1.2 -161.7188
= 186.71875 t/m -134.766 FORCE
Pmin = σmin D pile stress
= -134.765625X1.2
= -161.71875 t/m
h = 1.29
Shear force is ZERO at section A-A
(1/2) * (Pmax * (h-x)/h + Pmax) * x = H

x = 0.172

Resistance or Force at A-A = 161.71880 t/m

Rotation (θ) at top of socket under fixed condition:


θ = ML/EI + PL²/2EI
= 0.000070078 radians
< 0.0002124 radians HENCE OK
Length of pile upto fixity= L +h

= 9.65 + 1.28609865470852
= 10.936 m