Test Plan-Online Library System.
Test Plan-Online Library System.
Doc.No. : LMN/01
Version No.: 01
Date : 25/11/2014
Q.1. Write a test plan with scope of testing risks and contingencies,
strategy, schedule, staffing and training, deliverables, item pass/fail
criteria for Online Library System
(20 marks)
5) Assumptions:
a) Is it possible to invoke each menu function using
logical assumptions that if all parts of the system are
correct?
b) System will support more than 1000 simultaneous
users
1|P a g e s u n i l k h i l a r i @ h o t m a i l . c o m 9 8 5 0 9 7 9 6 5 5
Software Quality Assurance (SQA)Plan
Doc.No. : LMN/01
Version No.: 01
Date : 25/11/2014
i. External
ii. Internal
iii. Operational
2|P a g e s u n i l k h i l a r i @ h o t m a i l . c o m 9 8 5 0 9 7 9 6 5 5
Software Quality Assurance (SQA)Plan
Doc.No. : LMN/01
Version No.: 01
Date : 25/11/2014
f. Less error
g. More Storage Capacity
h. Search facility
i. Look and Feel Environment
j. Quick transaction
k. Tolerance for 10% less book storage capacity
The users will have to be trained upon the new system such
as the screen flows and screen design type of
help on the screen.
Type of errors while entering the data, the corresponding
validation check at each entry and the way to correct the
data entered.
It should then cover information needed by the specific user
or group to use the system.
Sr.N Module Start Date End Date
o. Name
1 Book 01/02/2013 09/02/2013
2 Publisher 10/02/2013 19/02/2013
3 Journal 20/02/2013 28/02/2013
4 Magazines 29/02/2013 03/03/2013
14) Responsibilities:
3|P a g e s u n i l k h i l a r i @ h o t m a i l . c o m 9 8 5 0 9 7 9 6 5 5
Software Quality Assurance (SQA)Plan
Doc.No. : LMN/01
Version No.: 01
Date : 25/11/2014
15) Staffing & Training : Specify the number of testers required and
indicate the skills
they should have. Specify what training is required, both in
the system
under test and any test tools -For functional testing require
special
SQA group of having –
a) QA Lead – 1 No.
b) QA Team Member(Tester) -2 Nos.
c) Developers - modulewise –who has written the code
4|P a g e s u n i l k h i l a r i @ h o t m a i l . c o m 9 8 5 0 9 7 9 6 5 5
Software Quality Assurance (SQA)Plan
Doc.No. : LMN/01
Version No.: 01
Date : 25/11/2014
ct r
Nam
e
LMS Books Puja Ajit 04/03/201
3
LMS Journals. Maruti Arun 05/03/201
3
LMS Magazines Rohit Shruti 06/03/201
3
LMS Instant Messaging Yogesh Vikas 07/03/201
3
LMS User Interface(UI) Nitin Ashu 08/03/201
3
LMS Search Opt. Apurva Ajit 09/03/201
3
19) Approvals:
Test Plan – -- get prepared by Mr.Arun ,QA Lead
-- get approved by Ms.Supriya ,QA Member
DFD --prepared By –Mr.Yogesh ,QA Memer
--Submitted to Ms.Puja ,QA Lead
Audit Report : Submitted to Ms.Priyanka,Chief Moderator
5|P a g e s u n i l k h i l a r i @ h o t m a i l . c o m 9 8 5 0 9 7 9 6 5 5