PHASE II - Construction Supervision and Contract Management PHASE I - Design and Preparation of Tender Documents Defect Liability Period (12 Months)
PHASE II - Construction Supervision and Contract Management PHASE I - Design and Preparation of Tender Documents Defect Liability Period (12 Months)
Professional Staf
Support Staf
KEY
Total
Home Field Home Field
18.00 ###
THE PROVISION OF PONSULTANCY SERVICES FOR PROPOSED DESIGN OF INTAKE AND ITS INFRASTRUCTURES INCLUDING MAIN WATER PIPELINE FROM INTAKE TO INDUSTRY AREA (30KM)
Duration Design and Preparation of Tender Documents Construction Supervision and Contract Management
Defect
Liability
No. Name of Staf Position Period (12
Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Months)
Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
Professional Staf
Support Staf
KEY
Total
Home Field Home Field
#VALUE!###
5.25