PHASE II - Construction Supervision and Contract Management PHASE I - Design and Preparation of Tender Documents Defect Liability Period (12 Months)

1) The document outlines a proposal for consultancy services to design an intake and 30km water pipeline infrastructure including staff assignments over two phases. 2) Phase I involves design and preparation of tender documents over 6 months with 5 professional and 2 support staff assigned on a part-time basis. 3) Phase II involves 12 months of construction supervision and contract management with staff assigned on a combination of home and field work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

PHASE II - Construction Supervision and Contract Management PHASE I - Design and Preparation of Tender Documents Defect Liability Period (12 Months)

1) The document outlines a proposal for consultancy services to design an intake and 30km water pipeline infrastructure including staff assignments over two phases. 2) Phase I involves design and preparation of tender documents over 6 months with 5 professional and 2 support staff assigned on a part-time basis. 3) Phase II involves 12 months of construction supervision and contract management with staff assigned on a combination of home and field work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

THE PROVISION OF PONSULTANCY SERVICES FOR PROPOSED DESIGN OF INTAKE AND ITS INFRASTRUCTURES INCLUDING MAIN WATER PIPELINE

FROM INTAKE TO INDUSTRY AREA (30KM)

PHASE I - Design and Preparation of Tender


Duration PHASE II - Construction Supervision and Contract Management
Documents
Defect
Liability
No. Name of Staf Position Period (12
Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Months)
Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

Professional Staf

1 Eng.Thomas Mhando Team Leader/Senior Water Engineer

2 Eng. Joshua Tahani Civil/Water Engineer

3 Eng. Meck Candidus Structural Engineer

4 Eng. Haruna Maulidi Environmental Expert

5 Eng. Selemani Hamduni Geotechnical/Materials Engineer

6 Eng. Moses E. Rajabu Hydrologist

7 Mr. John Kisimba Senior Topographical Surveyor

8 Eng. Haji Mkinga Mechanical Engineer

9 Eng. Raphael Ngeve Electrical Engineer

Support Staf

3 To be nominated Assistant Surveyor

5 To be nominated Draftsman/CAD Specialist

KEY

Full Time Input

Part Time Input


KM)

Total Staff-Month Input

PHASE I PHASE II Total

Total
Home Field Home Field

2.75 0.25 3.00 ###

1.50 0.50 2.00 ###

2.30 0.20 2.50 ###

1.25 0.25 1.50 ###

1.00 0.50 1.50 ###

0.25 0.75 1.00 ###

0.75 0.25 1.00 ###

0.75 0.25 1.00 ###

0.75 0.25 1.00 ###

0.00 1.00 1.00 ###

2.50 0.00 2.50 ###

18.00 ###
THE PROVISION OF PONSULTANCY SERVICES FOR PROPOSED DESIGN OF INTAKE AND ITS INFRASTRUCTURES INCLUDING MAIN WATER PIPELINE FROM INTAKE TO INDUSTRY AREA (30KM)

Duration Design and Preparation of Tender Documents Construction Supervision and Contract Management
Defect
Liability
No. Name of Staf Position Period (12
Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Months)
Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

Professional Staf

1 Eng.Thomas Mhando Team Leader/Senior Water Engineer

2 Eng. Joshua Tahani Civil/Water Engineer

3 Eng. Meck Candidus Structural Engineer

4 Eng. Haruna Maulidi Environmental Expert

5 Eng. Selemani Hamduni Geotechnical/Materials Engineer

6 Eng. Moses E. Rajabu Hydrologist

7 Mr. John Kisimba Senior Topographical Surveyor

8 Eng. Haji Mkinga Mechanical Engineer

9 Eng. Raphael Ngeve Electrical Engineer

Support Staf

3 To be nominated Assistant Surveyor

5 To be nominated Draftsman/CAD Specialist

KEY

Full Time Input

Part Time Input


KM)

Total Staff-Month Input

PHASE I PHASE II Total

Total
Home Field Home Field

2.00 1.00 1.00 13.00 17.00 ###

2.50 0.50 0.00 12.00 15.00 ###

1.00 1.00 0.00 11.00 13.00 ###

0.25 0.25 0.00 6.00 6.50 ###

1.00 0.50 0.00 8.00 9.50 ###

0.25 0.75 0.00 8.00 9.00 ###

0.75 0.25 0.00 2.00 3.00 ###

1.00 0.50 0.00 2.00 3.50 ###

1.00 0.50 0.00 2.00 3.50 ###

0.00 0.00 0.00 12.00 12.00 ###

2.50 0.00 2.50 6.00 11.00 ###

#VALUE!###

5.25