This document contains a table that lists project management processes, inputs, tools/techniques, and outputs. It includes 4 processes: Develop Project Charter, Develop Project Management Plan, Direct and Manage Project Work, and Manage Project Knowledge. For each process, it identifies relevant inputs, tools/techniques, and outputs and indicates whether they are included or not.

Uploaded by

Gilliani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views16 pages

ITTO Matrix 6thed All

This document contains a table that lists project management processes, inputs, tools/techniques, and outputs. It includes 4 processes: Develop Project Charter, Develop Project Management Plan, Direct and Manage Project Work, and Manage Project Knowledge. For each process, it identifies relevant inputs, tools/techniques, and outputs and indicates whether they are included or not.

Uploaded by

Gilliani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

664 100% 0%

No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

4 Integration 1 Develop Project Charter 1 Inputs 1 Business Documents TRUE 1 Business Case TRUE
4 Integration 1 Develop Project Charter 1 Inputs 2 Benefits Management Plan TRUE
4 Integration 1 Develop Project Charter 1 Inputs 2 Agreements TRUE 0
4 Integration 1 Develop Project Charter 1 Inputs 3 Enterprise Environmental Factors TRUE 0
4 Integration 1 Develop Project Charter 1 Inputs 4 Organizational Process Assets TRUE 0
4 Integration 1 Develop Project Charter 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 1 Develop Project Charter 2 Tools/Techs 2 Data Gathering TRUE 1 Brainstorming TRUE
4 Integration 1 Develop Project Charter 2 Tools/Techs 2 Focus Groups TRUE
4 Integration 1 Develop Project Charter 2 Tools/Techs 3 Interviews TRUE
4 Integration 1 Develop Project Charter 2 Tools/Techs 3 Interpersonal And Team Skills TRUE 1 Conflict Management TRUE
4 Integration 1 Develop Project Charter 2 Tools/Techs 2 Facilitation TRUE
4 Integration 1 Develop Project Charter 2 Tools/Techs 3 Meeting Management TRUE
4 Integration 1 Develop Project Charter 2 Tools/Techs 4 Meetings TRUE 0
4 Integration 1 Develop Project Charter 3 Outputs 1 Project Charter TRUE 0
4 Integration 1 Develop Project Charter 3 Outputs 2 Assumption Log TRUE 0
4 Integration 2 Develop Project Management Plan 1 Inputs 1 Project Charter TRUE 0
4 Integration 2 Develop Project Management Plan 1 Inputs 2 Outputs From Other Processes TRUE 0
4 Integration 2 Develop Project Management Plan 1 Inputs 3 Enterprise Environmental Factors TRUE 0
4 Integration 2 Develop Project Management Plan 1 Inputs 4 Organizational Process Assets TRUE 0
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 2 Data Gathering TRUE 1 Brainstorming TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 2 Checklists TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 3 Focus Groups TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 4 Interviews TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 3 Interpersonal And Team Skills TRUE 1 Conflict Management TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 2 Facilitation TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 3 Meeting Management TRUE
4 Integration 2 Develop Project Management Plan 2 Tools/Techs 4 Meetings TRUE 0
4 Integration 2 Develop Project Management Plan 3 Outputs 1 Project Management Plan TRUE 0
4 Integration 3 Direct and Manage Project Work 1 Inputs 1 Project Management Plan TRUE 1 Any Component TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 2 Project Documents TRUE 1 Change Log TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 2 Lessons Learned Register TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 3 Milestone List TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 4 Project Communications TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 5 Project Schedule TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 6 Requirements Traceability Matrix TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 7 Risk Register TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 8 Risk Report TRUE
4 Integration 3 Direct and Manage Project Work 1 Inputs 3 Approved Change Requests TRUE 0
4 Integration 3 Direct and Manage Project Work 1 Inputs 4 Enterprise Environmental Factors TRUE 0
4 Integration 3 Direct and Manage Project Work 1 Inputs 5 Organizational Process Assets TRUE 0
4 Integration 3 Direct and Manage Project Work 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 3 Direct and Manage Project Work 2 Tools/Techs 2 Project Management Information Systems TRUE 0
4 Integration 3 Direct and Manage Project Work 2 Tools/Techs 3 Meetings TRUE 0
4 Integration 3 Direct and Manage Project Work 3 Outputs 1 Deliverables TRUE 0
4 Integration 3 Direct and Manage Project Work 3 Outputs 2 Work Performance Data TRUE 0
4 Integration 3 Direct and Manage Project Work 3 Outputs 3 Issue Log TRUE 0
4 Integration 3 Direct and Manage Project Work 3 Outputs 4 Change Requests TRUE 0
4 Integration 3 Direct and Manage Project Work 3 Outputs 5 Project Management Plan Updates TRUE 1 Any Component TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 6 Project Documents Updates TRUE 1 Activity List TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 2 Assumption Log TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 3 Lessons Learned Register TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 4 Requirements Documentation TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 5 Risk Register TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 6 Stakeholder Register TRUE
4 Integration 3 Direct and Manage Project Work 3 Outputs 7 Organizational Process Assets Updates TRUE 0
4 Integration 4 Manage Project Knowledge 1 Inputs 1 Project Management Plan TRUE 1 All Components TRUE
4 Integration 4 Manage Project Knowledge 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
4 Integration 4 Manage Project Knowledge 1 Inputs 2 Project Team Assignments TRUE
4 Integration 4 Manage Project Knowledge 1 Inputs 3 Resource Breakdown Structure TRUE
4 Integration 4 Manage Project Knowledge 1 Inputs 4 Source Selection Criteria TRUE
4 Integration 4 Manage Project Knowledge 1 Inputs 5 Stakeholder Register TRUE
4 Integration 4 Manage Project Knowledge 1 Inputs 3 Deliverables TRUE 0
4 Integration 4 Manage Project Knowledge 1 Inputs 4 Enterprise Environmental Factors TRUE 0
4 Integration 4 Manage Project Knowledge 1 Inputs 5 Organizational Process Assets TRUE 0
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 2 Knowledge Management TRUE 0
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 3 Information Management Systems TRUE 0
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 4 Interpersonal And Team Skills TRUE 1 Active Listening TRUE
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 2 Facilitation TRUE
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 3 Leadership TRUE
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 4 Networking TRUE
4 Integration 4 Manage Project Knowledge 2 Tools/Techs 5 Political Awareness TRUE
4 Integration 4 Manage Project Knowledge 3 Outputs 1 Lesson Learned Register TRUE 0
4 Integration 4 Manage Project Knowledge 3 Outputs 2 Project Management Plan Updates TRUE 1 Any Component TRUE
4 Integration 4 Manage Project Knowledge 3 Outputs 3 Organizational Process Assets Updates TRUE 0

Page 1/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

4 Integration 5 Monitor and Control Project Work 1 Inputs 1 Project Management Plan TRUE 1 Any Component TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 2 Project Documents TRUE 1 Assumption Log TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 2 Basis of Estimates TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 3 Cost Forecasts TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 4 Issue Log TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 5 Lessons Learned Register TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 6 Milestone List TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 7 Quality Reports TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 8 Risk Register TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 9 Risk Report TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 10 Schedule Forecast TRUE
4 Integration 5 Monitor and Control Project Work 1 Inputs 3 Work Performance Information TRUE 0
4 Integration 5 Monitor and Control Project Work 1 Inputs 4 Agreements TRUE 0
4 Integration 5 Monitor and Control Project Work 1 Inputs 5 Enterprise Environmental Factors TRUE 0
4 Integration 5 Monitor and Control Project Work 1 Inputs 6 Organizational Process Assets TRUE 0
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 2 Decision Making TRUE 0
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 3 Data Analysis TRUE 1 Alternative Analysis TRUE
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 2 Cost-Benefit Analysis2 TRUE
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 3 Earned Value Analysis TRUE
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 4 Root Cause Analysis TRUE
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 5 Trend Analysis TRUE
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 6 Variance Analysis TRUE
4 Integration 5 Monitor and Control Project Work 2 Tools/Techs 4 Meetings TRUE 0
4 Integration 5 Monitor and Control Project Work 3 Outputs 1 Work Performance Reports TRUE 0
4 Integration 5 Monitor and Control Project Work 3 Outputs 2 Change Requests TRUE 0
4 Integration 5 Monitor and Control Project Work 3 Outputs 3 Project Management Plan Updates TRUE 1 Any Component TRUE
4 Integration 5 Monitor and Control Project Work 3 Outputs 4 Project Documents Updates TRUE 1 Cost Forecasts TRUE
4 Integration 5 Monitor and Control Project Work 3 Outputs 2 Issue Log TRUE
4 Integration 5 Monitor and Control Project Work 3 Outputs 3 Lessons Learned Register TRUE
4 Integration 5 Monitor and Control Project Work 3 Outputs 4 Risk Register TRUE
4 Integration 5 Monitor and Control Project Work 3 Outputs 5 Schedule Forecast TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 1 Project Management Plan TRUE 1 Change Management Plan TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 2 Configuration Management Plan TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 3 Scope Baseline TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 4 Schedule Baseline TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 5 Cost Baseline TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 2 Project Documents TRUE 1 Basis of Estimates TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 2 Requirements Traceability Matrix TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 3 Risk Report TRUE
4 Integration 6 Perform Integrated Change Control 1 Inputs 3 Work Performance Reports TRUE 0
4 Integration 6 Perform Integrated Change Control 1 Inputs 4 Change Requests TRUE 0
4 Integration 6 Perform Integrated Change Control 1 Inputs 5 Enterprise Environmental Factors TRUE 0
4 Integration 6 Perform Integrated Change Control 1 Inputs 6 Organizational Process Assets TRUE 0
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 2 Change Control Tools TRUE 0
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 3 Data Analysis TRUE 1 Alternative Analysis TRUE
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 2 Cost-Benefit Analysis2 TRUE
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 4 Decision Making TRUE 1 Voting TRUE
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 2 Autocratic Decision Making TRUE
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 3 Multicriteria Decision Analysis TRUE
4 Integration 6 Perform Integrated Change Control 2 Tools/Techs 5 Meetings TRUE 0
4 Integration 6 Perform Integrated Change Control 3 Outputs 1 Approved Change Requests TRUE 0
4 Integration 6 Perform Integrated Change Control 3 Outputs 2 Project Management Plan Updates TRUE 1 Any Component TRUE
4 Integration 6 Perform Integrated Change Control 3 Outputs 3 Project Documents Updates TRUE 1 Change Log TRUE
4 Integration 7 Close Project or Phase 1 Inputs 1 Project Charter TRUE 0
4 Integration 7 Close Project or Phase 1 Inputs 2 Project Management Plan TRUE 1 All Components TRUE
4 Integration 7 Close Project or Phase 1 Inputs 3 Project Documents TRUE 1 Assumption Log TRUE
4 Integration 7 Close Project or Phase 1 Inputs 2 Basis of Estimates TRUE
4 Integration 7 Close Project or Phase 1 Inputs 3 Change Log TRUE
4 Integration 7 Close Project or Phase 1 Inputs 4 Issue Log TRUE
4 Integration 7 Close Project or Phase 1 Inputs 5 Lessons Learned Register TRUE
4 Integration 7 Close Project or Phase 1 Inputs 6 Milestone List TRUE
4 Integration 7 Close Project or Phase 1 Inputs 7 Project Communications TRUE
4 Integration 7 Close Project or Phase 1 Inputs 8 Quality Control Measurements TRUE
4 Integration 7 Close Project or Phase 1 Inputs 9 Quality Reports TRUE
4 Integration 7 Close Project or Phase 1 Inputs 10 Requirements Documentation TRUE
4 Integration 7 Close Project or Phase 1 Inputs 11 Risk Register TRUE
4 Integration 7 Close Project or Phase 1 Inputs 12 Risk Report TRUE
4 Integration 7 Close Project or Phase 1 Inputs 4 Accepted Deliverables TRUE 0
4 Integration 7 Close Project or Phase 1 Inputs 5 Business Documents TRUE 1 Business Case TRUE
4 Integration 7 Close Project or Phase 1 Inputs 2 Benefits Management Plan TRUE
4 Integration 7 Close Project or Phase 1 Inputs 6 Agreements TRUE 0
4 Integration 7 Close Project or Phase 1 Inputs 7 Procurement Documentation TRUE 0
4 Integration 7 Close Project or Phase 1 Inputs 8 Organizational Process Assets TRUE 0
4 Integration 7 Close Project or Phase 2 Tools/Techs 1 Expert Judgment TRUE 0
4 Integration 7 Close Project or Phase 2 Tools/Techs 2 Data Analysis TRUE 1 Document Analysis TRUE
4 Integration 7 Close Project or Phase 2 Tools/Techs 2 Regression Analysis TRUE
4 Integration 7 Close Project or Phase 2 Tools/Techs 3 Trend Analysis TRUE
4 Integration 7 Close Project or Phase 2 Tools/Techs 4 Variance Analysis TRUE
4 Integration 7 Close Project or Phase 2 Tools/Techs 3 Meetings TRUE 0
4 Integration 7 Close Project or Phase 3 Outputs 1 Final Product, Service Or Result Transition TRUE 0
4 Integration 7 Close Project or Phase 3 Outputs 2 Final Report TRUE 0
4 Integration 7 Close Project or Phase 3 Outputs 3 Organizational Process Assets Updates TRUE 0

Page 2/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

5 Scope 1 Plan Scope Management 1 Inputs 1 Project Charter TRUE 0


5 Scope 1 Plan Scope Management 1 Inputs 2 Project Management Plan TRUE 1 Quality Management Plan TRUE
5 Scope 1 Plan Scope Management 1 Inputs 2 Project Life Cycle Description TRUE
5 Scope 1 Plan Scope Management 1 Inputs 3 Development Approach TRUE
5 Scope 1 Plan Scope Management 1 Inputs 3 Enterprise Environmental Factors TRUE 0
5 Scope 1 Plan Scope Management 1 Inputs 4 Organizational Process Assets TRUE 0
5 Scope 1 Plan Scope Management 2 Tools/Techs 1 Expert Judgment TRUE 0
5 Scope 1 Plan Scope Management 2 Tools/Techs 2 Data Analysis TRUE 1 Alternative Analysis TRUE
5 Scope 1 Plan Scope Management 2 Tools/Techs 3 Meetings TRUE 0
5 Scope 1 Plan Scope Management 3 Outputs 1 Scope Management Plan TRUE 0
5 Scope 1 Plan Scope Management 3 Outputs 2 Requirements Management Plan TRUE 0
5 Scope 2 Collect Requirements 1 Inputs 1 Project Charter TRUE 0
5 Scope 2 Collect Requirements 1 Inputs 2 Project Management Plan TRUE 1 Scope Management Plan TRUE
5 Scope 2 Collect Requirements 1 Inputs 2 Requirements Management Plan TRUE
5 Scope 2 Collect Requirements 1 Inputs 3 Stakeholder Engagement Plan TRUE
5 Scope 2 Collect Requirements 1 Inputs 3 Project Documents TRUE 1 Assumption Log TRUE
5 Scope 2 Collect Requirements 1 Inputs 2 Lessons Learned Register TRUE
5 Scope 2 Collect Requirements 1 Inputs 3 Stakeholder Register TRUE
5 Scope 2 Collect Requirements 1 Inputs 4 Business Documents TRUE 1 Business Case TRUE
5 Scope 2 Collect Requirements 1 Inputs 5 Agreements TRUE 0
5 Scope 2 Collect Requirements 1 Inputs 6 Enterprise Environmental Factors TRUE 0
5 Scope 2 Collect Requirements 1 Inputs 7 Organizational Process Assets TRUE 0
5 Scope 2 Collect Requirements 2 Tools/Techs 1 Expert Judgment TRUE 0
5 Scope 2 Collect Requirements 2 Tools/Techs 2 Data Gathering TRUE 1 Brainstorming TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 2 Interviews TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 3 Focus Groups TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 4 Questionnaires And Surveys TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 5 Benchmarking TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 3 Data Analysis TRUE 0
5 Scope 2 Collect Requirements 2 Tools/Techs 4 Decision Making TRUE 1 Voting TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 2 Multicriteria Decision Analysis TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 5 Data Representation TRUE 1 Affinity Diagrams TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 2 Mind-Mapping TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 6 Interpersonal And Team Skills TRUE 1 Nominal Group Technique TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 2 Observation/ Conversation TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 3 Facilitation TRUE
5 Scope 2 Collect Requirements 2 Tools/Techs 7 Context Diagrams TRUE 0
5 Scope 2 Collect Requirements 2 Tools/Techs 8 Prototypes TRUE 0
5 Scope 2 Collect Requirements 3 Outputs 1 Requirements Documentation TRUE 0
5 Scope 2 Collect Requirements 3 Outputs 2 Requirements Traceability Matrix TRUE 0
5 Scope 3 Define Scope 1 Inputs 1 Project Charter TRUE 0
5 Scope 3 Define Scope 1 Inputs 2 Project Management Plan TRUE 1 Scope Management Plan TRUE
5 Scope 3 Define Scope 1 Inputs 3 Project Documents TRUE 1 Assumption Log TRUE
5 Scope 3 Define Scope 1 Inputs 2 Requirements Documentation TRUE
5 Scope 3 Define Scope 1 Inputs 3 Risk Register TRUE
5 Scope 3 Define Scope 1 Inputs 4 Enterprise Environmental Factors TRUE 0
5 Scope 3 Define Scope 1 Inputs 5 Organizational Process Assets TRUE 0
5 Scope 3 Define Scope 2 Tools/Techs 1 Expert Judgment TRUE 0
5 Scope 3 Define Scope 2 Tools/Techs 2 Data Analysis TRUE 1 Alternative Analysis TRUE
5 Scope 3 Define Scope 2 Tools/Techs 3 Decision Making TRUE 1 Multicriteria Decision Analysis TRUE
5 Scope 3 Define Scope 2 Tools/Techs 4 Interpersonal And Team Skills TRUE 1 Facilitation TRUE
5 Scope 3 Define Scope 2 Tools/Techs 5 Product Analysis TRUE 0
5 Scope 3 Define Scope 3 Outputs 1 Project Scope Statement TRUE 0
5 Scope 3 Define Scope 3 Outputs 2 Project Documents Updates TRUE 1 Assumption Log TRUE
5 Scope 3 Define Scope 3 Outputs 2 Requirements Documentation TRUE
5 Scope 3 Define Scope 3 Outputs 3 Requirements Traceability Matrix TRUE
5 Scope 3 Define Scope 3 Outputs 4 Stakeholder Register TRUE
5 Scope 4 Create WBS 1 Inputs 1 Project Management Plan TRUE 1 Scope Management Plan TRUE
5 Scope 4 Create WBS 1 Inputs 2 Project Documents TRUE 1 Project Scope Statement TRUE
5 Scope 4 Create WBS 1 Inputs 2 Requirements Documentation TRUE
5 Scope 4 Create WBS 1 Inputs 3 Enterprise Environmental Factors TRUE 0
5 Scope 4 Create WBS 1 Inputs 4 Organizational Process Assets TRUE 0
5 Scope 4 Create WBS 2 Tools/Techs 1 Expert Judgment TRUE 0
5 Scope 4 Create WBS 2 Tools/Techs 2 Decomposition TRUE 0
5 Scope 4 Create WBS 3 Outputs 1 Scope Baseline TRUE 0
5 Scope 4 Create WBS 3 Outputs 2 Project Documents Updates TRUE 1 Assumption Log TRUE
5 Scope 4 Create WBS 3 Outputs 2 Requirements Documentation TRUE
5 Scope 5 Validate Scope 1 Inputs 1 Project Management Plan TRUE 1 Scope Management Plan TRUE
5 Scope 5 Validate Scope 1 Inputs 2 Requirements Management Plan TRUE
5 Scope 5 Validate Scope 1 Inputs 3 Scope Baseline TRUE
5 Scope 5 Validate Scope 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
5 Scope 5 Validate Scope 1 Inputs 2 Quality Reports TRUE
5 Scope 5 Validate Scope 1 Inputs 3 Requirement Documentation TRUE
5 Scope 5 Validate Scope 1 Inputs 4 Requirements Traceability Matrix TRUE
5 Scope 5 Validate Scope 1 Inputs 3 Verified Deliverables TRUE 0
5 Scope 5 Validate Scope 1 Inputs 4 Work Performance Data TRUE 0
5 Scope 5 Validate Scope 2 Tools/Techs 1 Inspection TRUE 0
5 Scope 5 Validate Scope 2 Tools/Techs 2 Decision Making TRUE 1 Voting TRUE
5 Scope 5 Validate Scope 3 Outputs 1 Accepted Deliverables TRUE 0
5 Scope 5 Validate Scope 3 Outputs 2 Work Performance Information TRUE 0
5 Scope 5 Validate Scope 3 Outputs 3 Change Requests TRUE 0
5 Scope 5 Validate Scope 3 Outputs 4 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
5 Scope 5 Validate Scope 3 Outputs 2 Requirements Documentation TRUE
5 Scope 5 Validate Scope 3 Outputs 3 Requirements Traceability Matrix TRUE

Page 3/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

5 Scope 6 Control Scope 1 Inputs 1 Project Management Plan TRUE 1 Scope Management Plan TRUE
5 Scope 6 Control Scope 1 Inputs 2 Requirements Management Plan TRUE
5 Scope 6 Control Scope 1 Inputs 3 Change Management Plan TRUE
5 Scope 6 Control Scope 1 Inputs 4 Configuration Management Plan TRUE
5 Scope 6 Control Scope 1 Inputs 5 Scope Baseline TRUE
5 Scope 6 Control Scope 1 Inputs 6 Performance Measurement Baseline TRUE
5 Scope 6 Control Scope 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
5 Scope 6 Control Scope 1 Inputs 2 Requirements Documentation TRUE
5 Scope 6 Control Scope 1 Inputs 3 Requirements Traceability Matrix TRUE
5 Scope 6 Control Scope 1 Inputs 3 Work Performance Data TRUE 0
5 Scope 6 Control Scope 1 Inputs 4 Organizational Process Assets TRUE 0
5 Scope 6 Control Scope 2 Tools/Techs 1 Data Analysis TRUE 1 Variance Analysis TRUE
5 Scope 6 Control Scope 2 Tools/Techs 2 Trend Analysis TRUE
5 Scope 6 Control Scope 3 Outputs 1 Work Performance Information TRUE 0
5 Scope 6 Control Scope 3 Outputs 2 Change Requests TRUE 0
5 Scope 6 Control Scope 3 Outputs 3 Project Management Plan Updates TRUE 1 Scope Management Plan TRUE
5 Scope 6 Control Scope 3 Outputs 2 Scope Baseline TRUE
5 Scope 6 Control Scope 3 Outputs 3 Schedule Baseline TRUE
5 Scope 6 Control Scope 3 Outputs 4 Cost Baseline TRUE
5 Scope 6 Control Scope 3 Outputs 5 Performance Baseline TRUE
5 Scope 6 Control Scope 3 Outputs 4 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
5 Scope 6 Control Scope 3 Outputs 2 Requirements Documentation TRUE
5 Scope 6 Control Scope 3 Outputs 3 Requirements Traceability Matrix TRUE
6 Schedule 1 Plan Schedule Management 1 Inputs 1 Project Charter TRUE 0
6 Schedule 1 Plan Schedule Management 1 Inputs 2 Project Management Plan TRUE 1 Scope Management Plan TRUE
6 Schedule 1 Plan Schedule Management 1 Inputs 2 Development Approach TRUE
6 Schedule 1 Plan Schedule Management 1 Inputs 3 Enterprise Environmental Factors TRUE 0
6 Schedule 1 Plan Schedule Management 1 Inputs 4 Organizational Process Assets TRUE 0
6 Schedule 1 Plan Schedule Management 2 Tools/Techs 1 Expert Judgment TRUE 0
6 Schedule 1 Plan Schedule Management 2 Tools/Techs 2 Data Analysis TRUE 0
6 Schedule 1 Plan Schedule Management 2 Tools/Techs 3 Meetings TRUE 0
6 Schedule 1 Plan Schedule Management 3 Outputs 1 Schedule Management Plan TRUE 0
6 Schedule 2 Define Activities 1 Inputs 1 Project Management Plan TRUE 1 Schedule Management Plan TRUE
6 Schedule 2 Define Activities 1 Inputs 2 Scope Baseline TRUE
6 Schedule 2 Define Activities 1 Inputs 2 Enterprise Environmental Factors TRUE 0
6 Schedule 2 Define Activities 1 Inputs 3 Organizational Process Assets TRUE 0
6 Schedule 2 Define Activities 2 Tools/Techs 1 Expert Judgment TRUE 0
6 Schedule 2 Define Activities 2 Tools/Techs 2 Decomposition TRUE 0
6 Schedule 2 Define Activities 2 Tools/Techs 3 Rolling Wave Planning TRUE 0
6 Schedule 2 Define Activities 2 Tools/Techs 4 Meetings TRUE 0
6 Schedule 2 Define Activities 3 Outputs 1 Activity List TRUE 0
6 Schedule 2 Define Activities 3 Outputs 2 Activity Attributes TRUE 0
6 Schedule 2 Define Activities 3 Outputs 3 Milestone List TRUE 0
6 Schedule 2 Define Activities 3 Outputs 4 Change Requests TRUE 0
6 Schedule 2 Define Activities 3 Outputs 5 Project Management Plan Updates TRUE 1 Schedule Baseline TRUE
6 Schedule 2 Define Activities 3 Outputs 2 Cost Baseline TRUE
6 Schedule 3 Sequence Activities 1 Inputs 1 Project Management Plan TRUE 1 Schedule Management Plan TRUE
6 Schedule 3 Sequence Activities 1 Inputs 2 Scope Baseline TRUE
6 Schedule 3 Sequence Activities 1 Inputs 2 Project Documents TRUE 1 Activity Attributes TRUE
6 Schedule 3 Sequence Activities 1 Inputs 2 Activity List TRUE
6 Schedule 3 Sequence Activities 1 Inputs 3 Assumption Log TRUE
6 Schedule 3 Sequence Activities 1 Inputs 4 Milestone List TRUE
6 Schedule 3 Sequence Activities 1 Inputs 3 Enterprise Environmental Factors TRUE 0
6 Schedule 3 Sequence Activities 1 Inputs 4 Organizational Process Assets TRUE 0
6 Schedule 3 Sequence Activities 2 Tools/Techs 1 Precedence Diagramming Method TRUE 0
6 Schedule 3 Sequence Activities 2 Tools/Techs 2 Dependency Determination And Integration TRUE 0
6 Schedule 3 Sequence Activities 2 Tools/Techs 3 Leads And Lags TRUE 0
6 Schedule 3 Sequence Activities 2 Tools/Techs 4 Project Management Information Systems TRUE 0
6 Schedule 3 Sequence Activities 3 Outputs 1 Project Schedule Network Diagrams TRUE 0
6 Schedule 3 Sequence Activities 3 Outputs 2 Project Documents Updates TRUE 1 Activity Attributes TRUE
6 Schedule 3 Sequence Activities 3 Outputs 2 Activity List TRUE
6 Schedule 3 Sequence Activities 3 Outputs 3 Assumption Log TRUE
6 Schedule 3 Sequence Activities 3 Outputs 4 Milestone List TRUE

Page 4/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

6 Schedule 4 Estimate Activity Durations 1 Inputs 1 Project Management Plan TRUE 1 Schedule Management Plan TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 2 Scope Baseline TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 2 Project Documents TRUE 1 Activity Attributes TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 2 Activity List TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 3 Assumption Log TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 4 Lessons Learned Register TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 5 Milestone List TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 6 Project Team Assignments TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 7 Resource Breakdown Structure TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 8 Resource Calendars TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 9 Resource Requirements TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 10 Risk Register TRUE
6 Schedule 4 Estimate Activity Durations 1 Inputs 3 Enterprise Environmental Factors TRUE 0
6 Schedule 4 Estimate Activity Durations 1 Inputs 4 Organizational Process Assets TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 1 Expert Judgment TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 2 Analogous Estimating TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 3 Parametric Estimating TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 4 Three-Point Estimating TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 5 Bottom-Up Estimating TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 6 Data Analysis TRUE 1 Alternative Analysis TRUE
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 2 Reserve Analysis TRUE
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 7 Decision Making TRUE 0
6 Schedule 4 Estimate Activity Durations 2 Tools/Techs 8 Meetings TRUE 0
6 Schedule 4 Estimate Activity Durations 3 Outputs 1 Duration Estimates TRUE 0
6 Schedule 4 Estimate Activity Durations 3 Outputs 2 Basis Of Estimates TRUE 0
6 Schedule 4 Estimate Activity Durations 3 Outputs 3 Project Documents Updates TRUE 1 Activity Attributes TRUE
6 Schedule 4 Estimate Activity Durations 3 Outputs 2 Assumption Log TRUE
6 Schedule 4 Estimate Activity Durations 3 Outputs 3 Lessons Learned Register TRUE
6 Schedule 5 Develop Schedule 1 Inputs 1 Project Management Plan TRUE 1 Schedule Management Plan TRUE
6 Schedule 5 Develop Schedule 1 Inputs 2 Scope Management Plan TRUE
6 Schedule 5 Develop Schedule 1 Inputs 2 Project Documents TRUE 1 Activity Attributes TRUE
6 Schedule 5 Develop Schedule 1 Inputs 2 Activity List TRUE
6 Schedule 5 Develop Schedule 1 Inputs 3 Assumption Log TRUE
6 Schedule 5 Develop Schedule 1 Inputs 4 Basis of Estimates TRUE
6 Schedule 5 Develop Schedule 1 Inputs 5 Duration Estimates TRUE
6 Schedule 5 Develop Schedule 1 Inputs 6 Lessons Learned Register TRUE
6 Schedule 5 Develop Schedule 1 Inputs 7 Milestone List TRUE
6 Schedule 5 Develop Schedule 1 Inputs 8 Project Schedule Network Diagrams TRUE
6 Schedule 5 Develop Schedule 1 Inputs 9 Project Team Assignments TRUE
6 Schedule 5 Develop Schedule 1 Inputs 10 Resource Calendars TRUE
6 Schedule 5 Develop Schedule 1 Inputs 11 Resource Requirements TRUE
6 Schedule 5 Develop Schedule 1 Inputs 12 Risk Register TRUE
6 Schedule 5 Develop Schedule 1 Inputs 3 Agreements TRUE 0
6 Schedule 5 Develop Schedule 1 Inputs 4 Enterprise Environmental Factors TRUE 0
6 Schedule 5 Develop Schedule 1 Inputs 5 Organizational Process Assets TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 1 Schedule Network Analysis TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 2 Critical Path Method TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 3 Resource Optimization TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 4 Data Analysis TRUE 1 What-If Scenario Analysis TRUE
6 Schedule 5 Develop Schedule 2 Tools/Techs 2 Simulation TRUE
6 Schedule 5 Develop Schedule 2 Tools/Techs 5 Leads And Lags TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 6 Schedule Compression TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 7 Project Management Information Systems TRUE 0
6 Schedule 5 Develop Schedule 2 Tools/Techs 8 Agile Release Planning TRUE 0
6 Schedule 5 Develop Schedule 3 Outputs 1 Schedule Baseline TRUE 0
6 Schedule 5 Develop Schedule 3 Outputs 2 Project Schedule TRUE 0
6 Schedule 5 Develop Schedule 3 Outputs 3 Schedule Data TRUE 0
6 Schedule 5 Develop Schedule 3 Outputs 4 Project Calendars TRUE 0
6 Schedule 5 Develop Schedule 3 Outputs 5 Change Requests TRUE 0
6 Schedule 5 Develop Schedule 3 Outputs 6 Project Management Plan Updates TRUE 1 Schedule Management Plan TRUE
6 Schedule 5 Develop Schedule 3 Outputs 2 Cost Baseline TRUE
6 Schedule 5 Develop Schedule 3 Outputs 7 Project Documents Updates TRUE 1 Activity Attributes TRUE
6 Schedule 5 Develop Schedule 3 Outputs 2 Assumption Log TRUE
6 Schedule 5 Develop Schedule 3 Outputs 3 Duration Estimates TRUE
6 Schedule 5 Develop Schedule 3 Outputs 4 Lessons Learned Register TRUE
6 Schedule 5 Develop Schedule 3 Outputs 5 Resource Requirements TRUE
6 Schedule 5 Develop Schedule 3 Outputs 6 Risk Register TRUE

Page 5/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

6 Schedule 6 Control Schedule 1 Inputs 1 Project Management Plan TRUE 1 Schedule Management Plan TRUE
6 Schedule 6 Control Schedule 1 Inputs 2 Schedule Baseline TRUE
6 Schedule 6 Control Schedule 1 Inputs 3 Scope Baseline TRUE
6 Schedule 6 Control Schedule 1 Inputs 4 Performance Measurement Baseline TRUE
6 Schedule 6 Control Schedule 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
6 Schedule 6 Control Schedule 1 Inputs 2 Project Calendars TRUE
6 Schedule 6 Control Schedule 1 Inputs 3 Project Schedule TRUE
6 Schedule 6 Control Schedule 1 Inputs 4 Resource Calendars TRUE
6 Schedule 6 Control Schedule 1 Inputs 5 Schedule Data TRUE
6 Schedule 6 Control Schedule 1 Inputs 3 Work Performance Data TRUE 0
6 Schedule 6 Control Schedule 1 Inputs 4 Organizational Process Assets TRUE 0
6 Schedule 6 Control Schedule 2 Tools/Techs 1 Data Analysis TRUE 1 Earned Value Analysis TRUE
6 Schedule 6 Control Schedule 2 Tools/Techs 2 Iteration Burndown Chart TRUE
6 Schedule 6 Control Schedule 2 Tools/Techs 3 Performance Reviews TRUE
6 Schedule 6 Control Schedule 2 Tools/Techs 4 Trend Analysis TRUE
6 Schedule 6 Control Schedule 2 Tools/Techs 5 Variance Analysis TRUE
6 Schedule 6 Control Schedule 2 Tools/Techs 6 What-If Scenario Analysis TRUE
6 Schedule 6 Control Schedule 2 Tools/Techs 2 Critical Path Method TRUE 0
6 Schedule 6 Control Schedule 2 Tools/Techs 3 Project Management Information Systems TRUE 0
6 Schedule 6 Control Schedule 2 Tools/Techs 4 Resource Optimization TRUE 0
6 Schedule 6 Control Schedule 2 Tools/Techs 5 Leads And Lags TRUE 0
6 Schedule 6 Control Schedule 2 Tools/Techs 6 Schedule Compression TRUE 0
6 Schedule 6 Control Schedule 3 Outputs 1 Work Performance Information TRUE 0
6 Schedule 6 Control Schedule 3 Outputs 2 Schedule Forecasts TRUE 0
6 Schedule 6 Control Schedule 3 Outputs 3 Change Requests TRUE 0
6 Schedule 6 Control Schedule 3 Outputs 4 Project Management Plan Updates TRUE 1 Schedule Management Plan TRUE
6 Schedule 6 Control Schedule 3 Outputs 2 Schedule Baseline TRUE
6 Schedule 6 Control Schedule 3 Outputs 3 Cost Baseline TRUE
6 Schedule 6 Control Schedule 3 Outputs 4 Performance Measurement Baseline TRUE
6 Schedule 6 Control Schedule 3 Outputs 5 Project Documents Updates TRUE 1 Assumption Log TRUE
6 Schedule 6 Control Schedule 3 Outputs 2 Basis of Estimates TRUE
6 Schedule 6 Control Schedule 3 Outputs 3 Lessons Learned Register TRUE
6 Schedule 6 Control Schedule 3 Outputs 4 Project Schedule TRUE
6 Schedule 6 Control Schedule 3 Outputs 5 Resource Calendars TRUE
6 Schedule 6 Control Schedule 3 Outputs 6 Risk Register TRUE
6 Schedule 6 Control Schedule 3 Outputs 7 Schedule Data TRUE
7 Cost 1 Plan Cost Management 1 Inputs 1 Project Charter TRUE 0
7 Cost 1 Plan Cost Management 1 Inputs 2 Project Management Plan TRUE 1 Schedule Management Plan TRUE
7 Cost 1 Plan Cost Management 1 Inputs 2 Risk Management Plan TRUE
7 Cost 1 Plan Cost Management 1 Inputs 3 Enterprise Environmental Factors TRUE 0
7 Cost 1 Plan Cost Management 1 Inputs 4 Organizational Process Assets TRUE 0
7 Cost 1 Plan Cost Management 2 Tools/Techs 1 Expert Judgment TRUE 0
7 Cost 1 Plan Cost Management 2 Tools/Techs 2 Data Analysis TRUE 0
7 Cost 1 Plan Cost Management 2 Tools/Techs 3 Meetings TRUE 0
7 Cost 1 Plan Cost Management 3 Outputs 1 Cost Management Plan TRUE 0
7 Cost 2 Estimate Costs 1 Inputs 1 Project Management Plan TRUE 1 Cost Management Plan TRUE
7 Cost 2 Estimate Costs 1 Inputs 2 Quality Management Plan TRUE
7 Cost 2 Estimate Costs 1 Inputs 3 Scope Baseline TRUE
7 Cost 2 Estimate Costs 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
7 Cost 2 Estimate Costs 1 Inputs 2 Project Schedule TRUE
7 Cost 2 Estimate Costs 1 Inputs 3 Resource Requirements TRUE
7 Cost 2 Estimate Costs 1 Inputs 4 Risk Register TRUE
7 Cost 2 Estimate Costs 1 Inputs 3 Enterprise Environmental Factors TRUE 0
7 Cost 2 Estimate Costs 1 Inputs 4 Organizational Process Assets TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 1 Expert Judgment TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 2 Analogous Estimating TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 3 Parametric Estimating TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 4 Bottom-Up Estimating TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 5 Three-Point Estimating TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 6 Data Analysis TRUE 1 Alternative Analysis TRUE
7 Cost 2 Estimate Costs 2 Tools/Techs 2 Reserve Analysis TRUE
7 Cost 2 Estimate Costs 2 Tools/Techs 3 Cost Of Quality2 TRUE
7 Cost 2 Estimate Costs 2 Tools/Techs 7 Project Management Information Systems TRUE 0
7 Cost 2 Estimate Costs 2 Tools/Techs 8 Decision Making TRUE 1 Voting TRUE
7 Cost 2 Estimate Costs 3 Outputs 1 Cost Estimates TRUE 0
7 Cost 2 Estimate Costs 3 Outputs 2 Basis Of Estimates TRUE 0
7 Cost 2 Estimate Costs 3 Outputs 3 Project Documents Updates TRUE 1 Assumption Log TRUE
7 Cost 2 Estimate Costs 3 Outputs 2 Lessons Learned Register TRUE
7 Cost 2 Estimate Costs 3 Outputs 3 Risk Register TRUE

Page 6/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

7 Cost 3 Determine Budget 1 Inputs 1 Project Management Plan TRUE 1 Cost Management Plan TRUE
7 Cost 3 Determine Budget 1 Inputs 2 Resource Management Plan TRUE
7 Cost 3 Determine Budget 1 Inputs 3 Scope Baseline TRUE
7 Cost 3 Determine Budget 1 Inputs 2 Project Documents TRUE 1 Basis of Estimates TRUE
7 Cost 3 Determine Budget 1 Inputs 2 Cost Estimates TRUE
7 Cost 3 Determine Budget 1 Inputs 3 Project Schedule TRUE
7 Cost 3 Determine Budget 1 Inputs 4 Risk Register TRUE
7 Cost 3 Determine Budget 1 Inputs 3 Business Documents TRUE 1 Business Case TRUE
7 Cost 3 Determine Budget 1 Inputs 2 Benefits Management Plan TRUE
7 Cost 3 Determine Budget 1 Inputs 4 Agreements TRUE 0
7 Cost 3 Determine Budget 1 Inputs 5 Enterprise Environmental Factors TRUE 0
7 Cost 3 Determine Budget 1 Inputs 6 Organizational Process Assets TRUE 0
7 Cost 3 Determine Budget 2 Tools/Techs 1 Expert Judgment TRUE 0
7 Cost 3 Determine Budget 2 Tools/Techs 2 Cost Aggregation TRUE 0
7 Cost 3 Determine Budget 2 Tools/Techs 3 Data Analysis TRUE 1 Reserve Analysis TRUE
7 Cost 3 Determine Budget 2 Tools/Techs 4 Historical Information Review TRUE 0
7 Cost 3 Determine Budget 2 Tools/Techs 5 Funding Limit Reconciliation TRUE 0
7 Cost 3 Determine Budget 2 Tools/Techs 6 Financing TRUE 0
7 Cost 3 Determine Budget 3 Outputs 1 Cost Baseline TRUE 0
7 Cost 3 Determine Budget 3 Outputs 2 Project Funding Requirements TRUE 0
7 Cost 3 Determine Budget 3 Outputs 3 Project Documents Updates TRUE 1 Cost Estimates TRUE
7 Cost 3 Determine Budget 3 Outputs 2 Project Schedule TRUE
7 Cost 3 Determine Budget 3 Outputs 3 Risk Register TRUE
7 Cost 4 Control Costs 1 Inputs 1 Project Management Plan TRUE 1 Cost Management Plan TRUE
7 Cost 4 Control Costs 1 Inputs 2 Cost Baseline TRUE
7 Cost 4 Control Costs 1 Inputs 3 Performance Measurement Baseline TRUE
7 Cost 4 Control Costs 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
7 Cost 4 Control Costs 1 Inputs 3 Project Funding Requirements TRUE 0
7 Cost 4 Control Costs 1 Inputs 4 Work Performance Data TRUE 0
7 Cost 4 Control Costs 1 Inputs 5 Organizational Process Assets TRUE 0
7 Cost 4 Control Costs 2 Tools/Techs 1 Expert Judgment TRUE 0
7 Cost 4 Control Costs 2 Tools/Techs 2 Data Analysis TRUE 1 Earned Value Analysis TRUE
7 Cost 4 Control Costs 2 Tools/Techs 2 Variance Analysis TRUE
7 Cost 4 Control Costs 2 Tools/Techs 3 Trend Analysis TRUE
7 Cost 4 Control Costs 2 Tools/Techs 4 Reserve Analysis TRUE
7 Cost 4 Control Costs 2 Tools/Techs 3 To-Complete Performance Index TRUE 0
7 Cost 4 Control Costs 2 Tools/Techs 4 Project Management Information Systems TRUE 0
7 Cost 4 Control Costs 3 Outputs 1 Work Performance Information TRUE 0
7 Cost 4 Control Costs 3 Outputs 2 Costs Forecasts TRUE 0
7 Cost 4 Control Costs 3 Outputs 3 Change Requests TRUE 0
7 Cost 4 Control Costs 3 Outputs 4 Project Management Plan Updates TRUE 1 Cost Management Plan TRUE
7 Cost 4 Control Costs 3 Outputs 2 Cost Baseline TRUE
7 Cost 4 Control Costs 3 Outputs 3 Performance Measurement Baseline TRUE
7 Cost 4 Control Costs 3 Outputs 5 Project Documents Updates TRUE 1 Assumption Log TRUE
7 Cost 4 Control Costs 3 Outputs 2 Basis of Estimates TRUE
7 Cost 4 Control Costs 3 Outputs 3 Cost Estimates TRUE
7 Cost 4 Control Costs 3 Outputs 4 Lessons Learned Register TRUE
7 Cost 4 Control Costs 3 Outputs 5 Risk Register TRUE
8 Quality 1 Plan Quality Management 1 Inputs 1 Project Charter TRUE 0
8 Quality 1 Plan Quality Management 1 Inputs 2 Project Management Plan TRUE 1 Requirements Management Plan TRUE
8 Quality 1 Plan Quality Management 1 Inputs 2 Risk Management Plan TRUE
8 Quality 1 Plan Quality Management 1 Inputs 3 Stakeholder Engagement Plan TRUE
8 Quality 1 Plan Quality Management 1 Inputs 4 Scope Baseline TRUE
8 Quality 1 Plan Quality Management 1 Inputs 3 Project Documents TRUE 1 Assumption Log TRUE
8 Quality 1 Plan Quality Management 1 Inputs 2 Requirements Documentation TRUE
8 Quality 1 Plan Quality Management 1 Inputs 3 Requirements Traceability Matrix TRUE
8 Quality 1 Plan Quality Management 1 Inputs 4 Risk Register TRUE
8 Quality 1 Plan Quality Management 1 Inputs 5 Stakeholder Register TRUE
8 Quality 1 Plan Quality Management 1 Inputs 4 Enterprise Environmental Factors TRUE 0
8 Quality 1 Plan Quality Management 1 Inputs 5 Organizational Process Assets TRUE 0
8 Quality 1 Plan Quality Management 2 Tools/Techs 1 Expert Judgment TRUE 0
8 Quality 1 Plan Quality Management 2 Tools/Techs 2 Data Gathering TRUE 1 Benchmarking TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 2 Brainstorming TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 3 Interviews TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 3 Data Analysis TRUE 1 Cost-Benefit Analysis2 TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 2 Cost Of Quality2 TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 4 Decision Making TRUE 1 Multicriteria Decision Analysis TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 5 Data Representation TRUE 1 Flowcharts TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 2 Logical Data Model TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 3 Matrix Diagrams TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 4 Mind-Mapping TRUE
8 Quality 1 Plan Quality Management 2 Tools/Techs 6 Test And Inspection Planning TRUE 0
8 Quality 1 Plan Quality Management 2 Tools/Techs 7 Meetings TRUE 0
8 Quality 1 Plan Quality Management 3 Outputs 1 Quality Management Plan TRUE 0
8 Quality 1 Plan Quality Management 3 Outputs 2 Quality Metrics TRUE 0
8 Quality 1 Plan Quality Management 3 Outputs 3 Project Management Plan Updates TRUE 1 Risk Management Plan TRUE
8 Quality 1 Plan Quality Management 3 Outputs 2 Scope Baseline TRUE
8 Quality 1 Plan Quality Management 3 Outputs 4 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
8 Quality 1 Plan Quality Management 3 Outputs 2 Requirements Traceability Matrix TRUE
8 Quality 1 Plan Quality Management 3 Outputs 3 Risk Register TRUE
8 Quality 1 Plan Quality Management 3 Outputs 4 Stakeholder Register TRUE

Page 7/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

8 Quality 2 Manage Quality 1 Inputs 1 Project Management Plan TRUE 1 Quality Management Plan TRUE
8 Quality 2 Manage Quality 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
8 Quality 2 Manage Quality 1 Inputs 2 Quality Control Measurements TRUE
8 Quality 2 Manage Quality 1 Inputs 3 Quality Metrics TRUE
8 Quality 2 Manage Quality 1 Inputs 4 Risk Report TRUE
8 Quality 2 Manage Quality 1 Inputs 3 Organizational Process Assets TRUE 0
8 Quality 2 Manage Quality 2 Tools/Techs 1 Data Gathering TRUE 1 Checklists TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 2 Data Analysis TRUE 1 Alternative Analysis TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 2 Document Analysis TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 3 Process Analysis TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 4 Root Cause Analysis TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 3 Decision Making TRUE 1 Multicriteria Decision Analysis TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 4 Data Representation TRUE 1 Affinity Diagrams TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 2 Cause And Effect Diagrams TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 3 Flowcharts TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 4 Histograms TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 5 Matrix Diagrams TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 6 Scatter Diagrams TRUE
8 Quality 2 Manage Quality 2 Tools/Techs 5 Audits TRUE 0
8 Quality 2 Manage Quality 2 Tools/Techs 6 Design For X TRUE 0
8 Quality 2 Manage Quality 2 Tools/Techs 7 Problem Solving TRUE 0
8 Quality 2 Manage Quality 2 Tools/Techs 8 Quality Improvement Methods TRUE 0
8 Quality 2 Manage Quality 3 Outputs 1 Quality Reports TRUE 0
8 Quality 2 Manage Quality 3 Outputs 2 Test And Evaluation Documents TRUE 0
8 Quality 2 Manage Quality 3 Outputs 3 Change Requests TRUE 0
8 Quality 2 Manage Quality 3 Outputs 4 Project Management Plan Updates TRUE 1 Quality Management Plan TRUE
8 Quality 2 Manage Quality 3 Outputs 2 Scope Baseline TRUE
8 Quality 2 Manage Quality 3 Outputs 3 Schedule Baseline TRUE
8 Quality 2 Manage Quality 3 Outputs 4 Cost Baseline TRUE
8 Quality 2 Manage Quality 3 Outputs 5 Project Documents Updates TRUE 1 Issue Log TRUE
8 Quality 2 Manage Quality 3 Outputs 2 Lessons Learned Register TRUE
8 Quality 2 Manage Quality 3 Outputs 3 Risk Register TRUE
8 Quality 3 Control Quality 1 Inputs 1 Project Management Plan TRUE 1 Quality Management Plan TRUE
8 Quality 3 Control Quality 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
8 Quality 3 Control Quality 1 Inputs 2 Quality Metrics TRUE
8 Quality 3 Control Quality 1 Inputs 3 Test and Evaluation Documents TRUE
8 Quality 3 Control Quality 1 Inputs 3 Approved Change Requests TRUE 0
8 Quality 3 Control Quality 1 Inputs 4 Deliverables TRUE 0
8 Quality 3 Control Quality 1 Inputs 5 Work Performance Data TRUE 0
8 Quality 3 Control Quality 1 Inputs 6 Enterprise Environmental Factors TRUE 0
8 Quality 3 Control Quality 1 Inputs 7 Organizational Process Assets TRUE 0
8 Quality 3 Control Quality 2 Tools/Techs 1 Data Gathering TRUE 1 Checklists TRUE
8 Quality 3 Control Quality 2 Tools/Techs 2 Check Sheets TRUE
8 Quality 3 Control Quality 2 Tools/Techs 3 Statistical Sampling TRUE
8 Quality 3 Control Quality 2 Tools/Techs 4 Questionnaires And Surveys TRUE
8 Quality 3 Control Quality 2 Tools/Techs 2 Data Analysis TRUE 1 Performance Reviews TRUE
8 Quality 3 Control Quality 2 Tools/Techs 2 Root Cause Analysis TRUE
8 Quality 3 Control Quality 2 Tools/Techs 3 Inspection TRUE 0
8 Quality 3 Control Quality 2 Tools/Techs 4 Testing/ Product Evaluations TRUE 0
8 Quality 3 Control Quality 2 Tools/Techs 5 Data Representation TRUE 1 Cause And Effect Diagrams TRUE
8 Quality 3 Control Quality 2 Tools/Techs 2 Control Charts TRUE
8 Quality 3 Control Quality 2 Tools/Techs 3 Histograms TRUE
8 Quality 3 Control Quality 2 Tools/Techs 4 Scatter Diagrams TRUE
8 Quality 3 Control Quality 2 Tools/Techs 6 Meetings TRUE 0
8 Quality 3 Control Quality 3 Outputs 1 Quality Control Measurements TRUE 0
8 Quality 3 Control Quality 3 Outputs 2 Verified Deliverables TRUE 0
8 Quality 3 Control Quality 3 Outputs 3 Work Performance Information TRUE 0
8 Quality 3 Control Quality 3 Outputs 4 Change Requests TRUE 0
8 Quality 3 Control Quality 3 Outputs 5 Project Management Plan Updates TRUE 1 Quality Management Plan TRUE
8 Quality 3 Control Quality 3 Outputs 6 Project Documents Updates TRUE 1 Issue Log TRUE
8 Quality 3 Control Quality 3 Outputs 2 Lessons Learned Register TRUE
8 Quality 3 Control Quality 3 Outputs 3 Risk Register TRUE
8 Quality 3 Control Quality 3 Outputs 4 Test and Evaluation Documents TRUE
9 Resources 1 Plan Resources Management 1 Inputs 1 Project Charter TRUE 0
9 Resources 1 Plan Resources Management 1 Inputs 2 Project Management Plan TRUE 1 Quality Management Plan TRUE
9 Resources 1 Plan Resources Management 1 Inputs 2 Scope Baseline TRUE
9 Resources 1 Plan Resources Management 1 Inputs 3 Project Documents TRUE 1 Project Schedule TRUE
9 Resources 1 Plan Resources Management 1 Inputs 2 Requirements Documentation TRUE
9 Resources 1 Plan Resources Management 1 Inputs 3 Risk Register TRUE
9 Resources 1 Plan Resources Management 1 Inputs 4 Stakeholder Register TRUE
9 Resources 1 Plan Resources Management 1 Inputs 4 Enterprise Environmental Factors TRUE 0
9 Resources 1 Plan Resources Management 1 Inputs 5 Organizational Process Assets TRUE 0
9 Resources 1 Plan Resources Management 2 Tools/Techs 1 Expert Judgment TRUE 0
9 Resources 1 Plan Resources Management 2 Tools/Techs 2 Data Representation TRUE 1 Hierarchical Charts TRUE
9 Resources 1 Plan Resources Management 2 Tools/Techs 2 Responsibility Assignment Matrix TRUE
9 Resources 1 Plan Resources Management 2 Tools/Techs 3 Text Oriented Formats TRUE
9 Resources 1 Plan Resources Management 2 Tools/Techs 3 Organizational Theory TRUE 0
9 Resources 1 Plan Resources Management 2 Tools/Techs 4 Meetings TRUE 0
9 Resources 1 Plan Resources Management 3 Outputs 1 Resource Management Plan TRUE 0
9 Resources 1 Plan Resources Management 3 Outputs 2 Team Charter TRUE 0
9 Resources 1 Plan Resources Management 3 Outputs 3 Project Documents Updates TRUE 1 Assumption Log TRUE
9 Resources 1 Plan Resources Management 3 Outputs 2 Risk Register TRUE

Page 8/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

9 Resources 2 Estimate Activity Resources 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 2 Scope Baseline TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 2 Project Documents TRUE 1 Activity Attributes TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 2 Activity List TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 3 Assumption Log TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 4 Cost Estimates TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 5 Resource Calendars TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 6 Risk Register TRUE
9 Resources 2 Estimate Activity Resources 1 Inputs 3 Enterprise Environmental Factors TRUE 0
9 Resources 2 Estimate Activity Resources 1 Inputs 4 Organizational Process Assets TRUE 0
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 1 Expert Judgment TRUE 0
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 2 Bottom-Up Estimating TRUE 0
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 3 Analogous Estimating TRUE 0
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 4 Parametric Estimating TRUE 0
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 5 Data Analysis TRUE 1 Alternative Analysis TRUE
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 6 Project Management Information Systems TRUE 0
9 Resources 2 Estimate Activity Resources 2 Tools/Techs 7 Meetings TRUE 0
9 Resources 2 Estimate Activity Resources 3 Outputs 1 Resource Requirements TRUE 0
9 Resources 2 Estimate Activity Resources 3 Outputs 2 Basis Of Estimates TRUE 0
9 Resources 2 Estimate Activity Resources 3 Outputs 3 Resource Breakdown Structure TRUE 0
9 Resources 2 Estimate Activity Resources 3 Outputs 4 Project Documents Updates TRUE 1 Activity Attributes TRUE
9 Resources 2 Estimate Activity Resources 3 Outputs 2 Assumption Log TRUE
9 Resources 2 Estimate Activity Resources 3 Outputs 3 Lessons Learned Register TRUE
9 Resources 3 Acquire Resources 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
9 Resources 3 Acquire Resources 1 Inputs 2 Procurement Management Plan TRUE
9 Resources 3 Acquire Resources 1 Inputs 3 Cost Baseline TRUE
9 Resources 3 Acquire Resources 1 Inputs 2 Project Documents TRUE 1 Project Schedule TRUE
9 Resources 3 Acquire Resources 1 Inputs 2 Resource Calendars TRUE
9 Resources 3 Acquire Resources 1 Inputs 3 Resource Requirements TRUE
9 Resources 3 Acquire Resources 1 Inputs 4 Stakeholder Register TRUE
9 Resources 3 Acquire Resources 1 Inputs 3 Enterprise Environmental Factors TRUE 0
9 Resources 3 Acquire Resources 1 Inputs 4 Organizational Process Assets TRUE 0
9 Resources 3 Acquire Resources 2 Tools/Techs 1 Decision Making TRUE 1 Multicriteria Decision Analysis TRUE
9 Resources 3 Acquire Resources 2 Tools/Techs 2 Interpersonal And Team Skills TRUE 1 Negotiation TRUE
9 Resources 3 Acquire Resources 2 Tools/Techs 3 Pre-Assignment TRUE 0
9 Resources 3 Acquire Resources 2 Tools/Techs 4 Virtual Teams TRUE 0
9 Resources 3 Acquire Resources 3 Outputs 1 Physical Resource Assignments TRUE 0
9 Resources 3 Acquire Resources 3 Outputs 2 Project Team Requirements TRUE 0
9 Resources 3 Acquire Resources 3 Outputs 3 Resource Calendars TRUE 0
9 Resources 3 Acquire Resources 3 Outputs 4 Change Requests TRUE 0
9 Resources 3 Acquire Resources 3 Outputs 5 Project Management Plan Updates TRUE 1 Resource Management Plan TRUE
9 Resources 3 Acquire Resources 3 Outputs 2 Cost Baseline TRUE
9 Resources 3 Acquire Resources 3 Outputs 6 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
9 Resources 3 Acquire Resources 3 Outputs 2 Project Schedule TRUE
9 Resources 3 Acquire Resources 3 Outputs 3 Resource Breakdown Structure TRUE
9 Resources 3 Acquire Resources 3 Outputs 4 Resource Requirements TRUE
9 Resources 3 Acquire Resources 3 Outputs 5 Risk Register TRUE
9 Resources 3 Acquire Resources 3 Outputs 6 Stakeholder Register TRUE
9 Resources 3 Acquire Resources 3 Outputs 7 Enterprise Environmental Factors Updates TRUE 0
9 Resources 3 Acquire Resources 3 Outputs 8 Organizational Process Assets Updates TRUE 0
9 Resources 4 Develop Team 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
9 Resources 4 Develop Team 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
9 Resources 4 Develop Team 1 Inputs 2 Project Schedule TRUE
9 Resources 4 Develop Team 1 Inputs 3 Project Team Assignments TRUE
9 Resources 4 Develop Team 1 Inputs 4 Resource Calendars TRUE
9 Resources 4 Develop Team 1 Inputs 5 Team Charter TRUE
9 Resources 4 Develop Team 1 Inputs 3 Enterprise Environmental Factors TRUE 0
9 Resources 4 Develop Team 1 Inputs 4 Organizational Process Assets TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 1 Colocation TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 2 Virtual Teams TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 3 Communication Technology TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 4 Interpersonal And Team Skills TRUE 1 Conflict Management TRUE
9 Resources 4 Develop Team 2 Tools/Techs 2 Influencing TRUE
9 Resources 4 Develop Team 2 Tools/Techs 3 Motivation TRUE
9 Resources 4 Develop Team 2 Tools/Techs 4 Negotiation TRUE
9 Resources 4 Develop Team 2 Tools/Techs 5 Team Building TRUE
9 Resources 4 Develop Team 2 Tools/Techs 5 Recognition And Rewards TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 6 Training TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 7 Individual Team Assessments TRUE 0
9 Resources 4 Develop Team 2 Tools/Techs 8 Meetings TRUE 0
9 Resources 4 Develop Team 3 Outputs 1 Team Performance Assessments TRUE 0
9 Resources 4 Develop Team 3 Outputs 2 Change Requests TRUE 0
9 Resources 4 Develop Team 3 Outputs 3 Project Management Plan Updates TRUE 1 Resource Management Plan TRUE
9 Resources 4 Develop Team 3 Outputs 4 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
9 Resources 4 Develop Team 3 Outputs 2 Project Schedule TRUE
9 Resources 4 Develop Team 3 Outputs 3 Project Team Assignments TRUE
9 Resources 4 Develop Team 3 Outputs 4 Resource Calendars TRUE
9 Resources 4 Develop Team 3 Outputs 5 Team Charter TRUE
9 Resources 4 Develop Team 3 Outputs 5 Enterprise Environmental Factors Updates TRUE 0
9 Resources 4 Develop Team 3 Outputs 6 Organizational Process Assets Updates TRUE 0

Page 9/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

9 Resources 5 Manage Team 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
9 Resources 5 Manage Team 1 Inputs 2 Project Documents TRUE 1 Issue Log TRUE
9 Resources 5 Manage Team 1 Inputs 2 Lessons Learned Register TRUE
9 Resources 5 Manage Team 1 Inputs 3 Project Team Assignments TRUE
9 Resources 5 Manage Team 1 Inputs 4 Team Charter TRUE
9 Resources 5 Manage Team 1 Inputs 3 Work Performance Reports TRUE 0
9 Resources 5 Manage Team 1 Inputs 4 Team Performance Assessments TRUE 0
9 Resources 5 Manage Team 1 Inputs 5 Enterprise Environmental Factors TRUE 0
9 Resources 5 Manage Team 1 Inputs 6 Organizational Process Assets TRUE 0
9 Resources 5 Manage Team 2 Tools/Techs 1 Interpersonal And Team Skills TRUE 1 Conflict Management TRUE
9 Resources 5 Manage Team 2 Tools/Techs 2 Decision Making TRUE
9 Resources 5 Manage Team 2 Tools/Techs 3 Emotional Intelligence TRUE
9 Resources 5 Manage Team 2 Tools/Techs 4 Influencing TRUE
9 Resources 5 Manage Team 2 Tools/Techs 5 Leadership TRUE
9 Resources 5 Manage Team 2 Tools/Techs 2 Project Management Information Systems TRUE 0
9 Resources 5 Manage Team 3 Outputs 1 Change Requests TRUE 0
9 Resources 5 Manage Team 3 Outputs 2 Project Management Plan Updates TRUE 1 Resource Management Plan TRUE
9 Resources 5 Manage Team 3 Outputs 2 Schedule Baseline TRUE
9 Resources 5 Manage Team 3 Outputs 3 Cost Baseline TRUE
9 Resources 5 Manage Team 3 Outputs 3 Project Documents Updates TRUE 1 Issue Log TRUE
9 Resources 5 Manage Team 3 Outputs 2 Lessons Learned Register TRUE
9 Resources 5 Manage Team 3 Outputs 3 Project Team Assignments TRUE
9 Resources 5 Manage Team 3 Outputs 4 Enterprise Environmental Factors Updates TRUE 0
9 Resources 6 Control Resources 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
9 Resources 6 Control Resources 1 Inputs 2 Project Documents TRUE 1 Issue Log TRUE
9 Resources 6 Control Resources 1 Inputs 2 Lessons Learned Register TRUE
9 Resources 6 Control Resources 1 Inputs 3 Physical Resource Assignments TRUE
9 Resources 6 Control Resources 1 Inputs 4 Project Schedule TRUE
9 Resources 6 Control Resources 1 Inputs 5 Resource Breakdown Structure TRUE
9 Resources 6 Control Resources 1 Inputs 6 Resource Requirements TRUE
9 Resources 6 Control Resources 1 Inputs 7 Risk Register TRUE
9 Resources 6 Control Resources 1 Inputs 3 Work Performance Data TRUE 0
9 Resources 6 Control Resources 1 Inputs 4 Agreements TRUE 0
9 Resources 6 Control Resources 1 Inputs 5 Organizational Process Assets TRUE 0
9 Resources 6 Control Resources 2 Tools/Techs 1 Data Analysis TRUE 1 Alternative Analysis TRUE
9 Resources 6 Control Resources 2 Tools/Techs 2 Cost-Benefit Analysis2 TRUE
9 Resources 6 Control Resources 2 Tools/Techs 3 Performance Reviews TRUE
9 Resources 6 Control Resources 2 Tools/Techs 4 Trend Analysis TRUE
9 Resources 6 Control Resources 2 Tools/Techs 2 Problem Solving TRUE 0
9 Resources 6 Control Resources 2 Tools/Techs 3 Interpersonal And Team Skills TRUE 1 Negotiation TRUE
9 Resources 6 Control Resources 2 Tools/Techs 2 Influencing TRUE
9 Resources 6 Control Resources 2 Tools/Techs 4 Project Management Information Systems TRUE 0
9 Resources 6 Control Resources 3 Outputs 1 Work Performance Information TRUE 0
9 Resources 6 Control Resources 3 Outputs 2 Change Requests TRUE 0
9 Resources 6 Control Resources 3 Outputs 3 Project Management Plan Updates TRUE 1 Resource Management Plan TRUE
9 Resources 6 Control Resources 3 Outputs 2 Schedule Baseline TRUE
9 Resources 6 Control Resources 3 Outputs 3 Cost Baseline TRUE
9 Resources 6 Control Resources 3 Outputs 4 Project Documents Updates TRUE 1 Assumption Log TRUE
9 Resources 6 Control Resources 3 Outputs 2 Issue Log TRUE
9 Resources 6 Control Resources 3 Outputs 3 Lessons Learned Register TRUE
9 Resources 6 Control Resources 3 Outputs 4 Physical Resource Assignments TRUE
9 Resources 6 Control Resources 3 Outputs 5 Resource Breakdown Structure TRUE
9 Resources 6 Control Resources 3 Outputs 6 Risk Register TRUE
10 Communications 1 Plan Communications Management 1 Inputs 1 Project Charter TRUE 0
10 Communications 1 Plan Communications Management 1 Inputs 2 Project Management Plan TRUE 1 Resource Management Plan TRUE
10 Communications 1 Plan Communications Management 1 Inputs 2 Stakeholder Engagement Plan TRUE
10 Communications 1 Plan Communications Management 1 Inputs 3 Project Documents TRUE 1 Requirements Documentation TRUE
10 Communications 1 Plan Communications Management 1 Inputs 2 Stakeholder Register TRUE
10 Communications 1 Plan Communications Management 1 Inputs 4 Enterprise Environmental Factors TRUE 0
10 Communications 1 Plan Communications Management 1 Inputs 5 Organizational Process Assets TRUE 0
10 Communications 1 Plan Communications Management 2 Tools/Techs 1 Expert Judgment TRUE 0
10 Communications 1 Plan Communications Management 2 Tools/Techs 2 Communication Requirement Analysis TRUE 0
10 Communications 1 Plan Communications Management 2 Tools/Techs 3 Communication Technology TRUE 0
10 Communications 1 Plan Communications Management 2 Tools/Techs 4 Communication Model TRUE 0
10 Communications 1 Plan Communications Management 2 Tools/Techs 5 Interpersonal And Team Skills TRUE 1 Communication Styles Assessment TRUE
10 Communications 1 Plan Communications Management 2 Tools/Techs 2 Political Awareness TRUE
10 Communications 1 Plan Communications Management 2 Tools/Techs 3 Cultural Awareness TRUE
10 Communications 1 Plan Communications Management 2 Tools/Techs 6 Data Representation TRUE 1 Stakeholder Engagement Assessment Matrix TRUE
10 Communications 1 Plan Communications Management 2 Tools/Techs 7 Meetings TRUE 0
10 Communications 1 Plan Communications Management 3 Outputs 1 Communication Management Plan TRUE 0
10 Communications 1 Plan Communications Management 3 Outputs 2 Project Management Plan Updates TRUE 1 Stakeholder Engagement Plan TRUE
10 Communications 1 Plan Communications Management 3 Outputs 3 Project Documents Updates TRUE 1 Project Schedule TRUE
10 Communications 1 Plan Communications Management 3 Outputs 2 Stakeholder Register TRUE

Page 10/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

10 Communications 2 Manage Communications 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
10 Communications 2 Manage Communications 1 Inputs 2 Communications Management Plan TRUE
10 Communications 2 Manage Communications 1 Inputs 3 Stakeholder Engagement Plan TRUE
10 Communications 2 Manage Communications 1 Inputs 2 Project Documents TRUE 1 Change Log TRUE
10 Communications 2 Manage Communications 1 Inputs 2 Issue Log TRUE
10 Communications 2 Manage Communications 1 Inputs 3 Lessons Learned Register TRUE
10 Communications 2 Manage Communications 1 Inputs 4 Quality Reports TRUE
10 Communications 2 Manage Communications 1 Inputs 5 Risk Report TRUE
10 Communications 2 Manage Communications 1 Inputs 6 Stakeholder Register TRUE
10 Communications 2 Manage Communications 1 Inputs 3 Work Performance Reports TRUE 0
10 Communications 2 Manage Communications 1 Inputs 4 Enterprise Environmental Factors TRUE 0
10 Communications 2 Manage Communications 1 Inputs 5 Organizational Process Assets TRUE 0
10 Communications 2 Manage Communications 2 Tools/Techs 1 Communication Technology TRUE 0
10 Communications 2 Manage Communications 2 Tools/Techs 2 Communication Methods TRUE 0
10 Communications 2 Manage Communications 2 Tools/Techs 3 Communication Skills TRUE 1 Communication Competence TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 2 Feedback TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 3 Nonverbal TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 4 Presentations TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 4 Project Management Information Systems TRUE 0
10 Communications 2 Manage Communications 2 Tools/Techs 5 Project Reporting TRUE 0
10 Communications 2 Manage Communications 2 Tools/Techs 6 Interpersonal And Team Skills TRUE 1 Active Listening TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 2 Conflict Management TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 3 Cultural Awareness TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 4 Meeting Management TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 5 Networking TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 6 Political Awareness TRUE
10 Communications 2 Manage Communications 2 Tools/Techs 7 Meetings TRUE 0
10 Communications 2 Manage Communications 3 Outputs 1 Project Communications TRUE 0
10 Communications 2 Manage Communications 3 Outputs 2 Project Management Plan Updates TRUE 1 Communications Management Plan TRUE
10 Communications 2 Manage Communications 3 Outputs 2 Stakeholder Engagement Plan TRUE
10 Communications 2 Manage Communications 3 Outputs 3 Project Documents Updates TRUE 1 Issue Log TRUE
10 Communications 2 Manage Communications 3 Outputs 2 Lessons Learned Register TRUE
10 Communications 2 Manage Communications 3 Outputs 3 Project Schedule TRUE
10 Communications 2 Manage Communications 3 Outputs 4 Risk Register TRUE
10 Communications 2 Manage Communications 3 Outputs 5 Stakeholder Register TRUE
10 Communications 2 Manage Communications 3 Outputs 4 Organizational Process Assets Updates TRUE 0
10 Communications 3 Monitor Communications 1 Inputs 1 Project Management Plan TRUE 1 Resource Management Plan TRUE
10 Communications 3 Monitor Communications 1 Inputs 2 Communications Management Plan TRUE
10 Communications 3 Monitor Communications 1 Inputs 3 Stakeholder Engagement Plan TRUE
10 Communications 3 Monitor Communications 1 Inputs 2 Project Documents TRUE 1 Issue Log TRUE
10 Communications 3 Monitor Communications 1 Inputs 2 Lessons Learned Register TRUE
10 Communications 3 Monitor Communications 1 Inputs 3 Project Communications TRUE
10 Communications 3 Monitor Communications 1 Inputs 3 Work Performance Data TRUE 0
10 Communications 3 Monitor Communications 1 Inputs 4 Enterprise Environmental Factors TRUE 0
10 Communications 3 Monitor Communications 1 Inputs 5 Organizational Process Assets TRUE 0
10 Communications 3 Monitor Communications 2 Tools/Techs 1 Expert Judgment TRUE 0
10 Communications 3 Monitor Communications 2 Tools/Techs 2 Project Management Information Systems TRUE 0
10 Communications 3 Monitor Communications 2 Tools/Techs 3 Data Representation TRUE 1 Stakeholder Engagement Assessment Matrix TRUE
10 Communications 3 Monitor Communications 2 Tools/Techs 4 Interpersonal And Team Skills TRUE 1 Observation/ Conversation TRUE
10 Communications 3 Monitor Communications 2 Tools/Techs 5 Meetings TRUE 0
10 Communications 3 Monitor Communications 3 Outputs 1 Work Performance Information TRUE 0
10 Communications 3 Monitor Communications 3 Outputs 2 Change Requests TRUE 0
10 Communications 3 Monitor Communications 3 Outputs 3 Project Management Plan Updates TRUE 1 Communications Management Plan TRUE
10 Communications 3 Monitor Communications 3 Outputs 2 Stakeholder Engagement Plan TRUE
10 Communications 3 Monitor Communications 3 Outputs 4 Project Documents Updates TRUE 1 Issue Log TRUE
10 Communications 3 Monitor Communications 3 Outputs 2 Lessons Learned Register TRUE
10 Communications 3 Monitor Communications 3 Outputs 3 Stakeholder Register TRUE
(blank)
(blank) (blank)(blank) (blank)(blank) (blank)(blank) TRUE (blank)(blank) TRUE
11 Risk 1 Plan Risk Management 1 Inputs 1 Project Charter TRUE 0
11 Risk 1 Plan Risk Management 1 Inputs 2 Project Management Plan TRUE 1 All Components TRUE
11 Risk 1 Plan Risk Management 1 Inputs 3 Project Documents TRUE 1 Stakeholder Register TRUE
11 Risk 1 Plan Risk Management 1 Inputs 4 Enterprise Environmental Factors TRUE 0
11 Risk 1 Plan Risk Management 1 Inputs 5 Organizational Process Assets TRUE 0
11 Risk 1 Plan Risk Management 2 Tools/Techs 1 Expert Judgment TRUE 0
11 Risk 1 Plan Risk Management 2 Tools/Techs 2 Data Analysis TRUE 1 Stakeholder Analysis TRUE
11 Risk 1 Plan Risk Management 2 Tools/Techs 3 Meetings TRUE 0
11 Risk 1 Plan Risk Management 3 Outputs 1 Risk Management Plan TRUE 0

Page 11/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

11 Risk 2 Identify Risks 1 Inputs 1 Project Management Plan TRUE 1 Requirements Management Plan TRUE
11 Risk 2 Identify Risks 1 Inputs 2 Schedule Management Plan TRUE
11 Risk 2 Identify Risks 1 Inputs 3 Cost Management Plan TRUE
11 Risk 2 Identify Risks 1 Inputs 4 Quality Management Plan TRUE
11 Risk 2 Identify Risks 1 Inputs 5 Resource Management Plan TRUE
11 Risk 2 Identify Risks 1 Inputs 6 Risk Management Plan TRUE
11 Risk 2 Identify Risks 1 Inputs 7 Scope Baseline TRUE
11 Risk 2 Identify Risks 1 Inputs 8 Schedule Baseline TRUE
11 Risk 2 Identify Risks 1 Inputs 9 Cost Baseline TRUE
11 Risk 2 Identify Risks 1 Inputs 2 Project Documents TRUE 1 Assumption Log TRUE
11 Risk 2 Identify Risks 1 Inputs 2 Cost Estimates TRUE
11 Risk 2 Identify Risks 1 Inputs 3 Duration Estimates TRUE
11 Risk 2 Identify Risks 1 Inputs 4 Issue Log TRUE
11 Risk 2 Identify Risks 1 Inputs 5 Lessons Learned Register TRUE
11 Risk 2 Identify Risks 1 Inputs 6 Requirements Documentation TRUE
11 Risk 2 Identify Risks 1 Inputs 7 Resource Requirements TRUE
11 Risk 2 Identify Risks 1 Inputs 8 Stakeholder Register TRUE
11 Risk 2 Identify Risks 1 Inputs 3 Agreements TRUE 0
11 Risk 2 Identify Risks 1 Inputs 4 Procurement Documentation TRUE 0
11 Risk 2 Identify Risks 1 Inputs 5 Enterprise Environmental Factors TRUE 0
11 Risk 2 Identify Risks 1 Inputs 6 Organizational Process Assets TRUE 0
11 Risk 2 Identify Risks 2 Tools/Techs 1 Expert Judgment TRUE 0
11 Risk 2 Identify Risks 2 Tools/Techs 2 Data Gathering TRUE 1 Brainstorming TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 2 Checklists TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 3 Interviews TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 3 Data Analysis TRUE 1 Root Cause Analysis TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 2 Assumption And Constraint Analysis TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 3 Swot Analysis TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 4 Document Analysis TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 4 Interpersonal And Team Skills TRUE 1 Facilitation TRUE
11 Risk 2 Identify Risks 2 Tools/Techs 5 Prompt List TRUE 0
11 Risk 2 Identify Risks 2 Tools/Techs 6 Meetings TRUE 0
11 Risk 2 Identify Risks 3 Outputs 1 Risk Register TRUE 0
11 Risk 2 Identify Risks 3 Outputs 2 Risk Report TRUE 0
11 Risk 2 Identify Risks 3 Outputs 3 Project Documents Updates TRUE 1 Assumption Log TRUE
11 Risk 2 Identify Risks 3 Outputs 2 Issue Log TRUE
11 Risk 2 Identify Risks 3 Outputs 3 Lessons Learned Register TRUE
11 Risk 3 Perform Qualitative Risk Analysis 1 Inputs 1 Project Management Plan TRUE 1 Risk Management Plan TRUE
11 Risk 3 Perform Qualitative Risk Analysis 1 Inputs 2 Project Documents TRUE 1 Assumption Log TRUE
11 Risk 3 Perform Qualitative Risk Analysis 1 Inputs 2 Risk Register TRUE
11 Risk 3 Perform Qualitative Risk Analysis 1 Inputs 3 Stakeholder Register TRUE
11 Risk 3 Perform Qualitative Risk Analysis 1 Inputs 3 Enterprise Environmental Factors TRUE 0
11 Risk 3 Perform Qualitative Risk Analysis 1 Inputs 4 Organizational Process Assets TRUE 0
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 1 Expert Judgment TRUE 0
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 2 Data Gathering TRUE 1 Interviews TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 3 Data Analysis TRUE 1 Risk Data Quality Assessment TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 2 Risk Probability And Impact Assessment TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 3 Assessment Of Other Risk Parameters TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 4 Interpersonal And Team Skills TRUE 1 Facilitation TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 5 Risk Categorization TRUE 0
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 6 Data Representation TRUE 1 Probability And Impact Matrix TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 2 Hierarchical Charts TRUE
11 Risk 3 Perform Qualitative Risk Analysis 2 Tools/Techs 7 Meetings TRUE 0
11 Risk 3 Perform Qualitative Risk Analysis 3 Outputs 1 Project Documents Updates TRUE 1 Issue Log TRUE
11 Risk 3 Perform Qualitative Risk Analysis 3 Outputs 2 Risk Register TRUE
11 Risk 3 Perform Qualitative Risk Analysis 3 Outputs 3 Risk Report TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 1 Project Management Plan TRUE 4 Risk Management Plan TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 5 Scope Baseline TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 6 Schedule Baseline TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 7 Cost Baseline TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 2 Project Documents TRUE 1 Assumption Log TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 2 Basis of Estimates TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 3 Cost Estimates TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 4 Cost Forecasts TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 5 Duration Estimates TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 6 Milestone List TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 7 Resource Requirements TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 8 Risk Register TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 9 Risk Report TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 10 Schedule Forecast TRUE
11 Risk 4 Perform Quantitative Analysis 1 Inputs 3 Enterprise Environmental Factors TRUE 0
11 Risk 4 Perform Quantitative Analysis 1 Inputs 4 Organizational Process Assets TRUE 0
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 1 Expert Judgment TRUE 0
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 2 Data Gathering TRUE 1 Interviews TRUE
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 3 Interpersonal And Team Skills TRUE 1 Facilitation TRUE
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 4 Representation Of Uncertainty TRUE 0
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 5 Data Analysis TRUE 1 Simulation TRUE
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 2 Sensitivity Analysis TRUE
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 3 Decision Tree Analysis TRUE
11 Risk 4 Perform Quantitative Analysis 2 Tools/Techs 4 Infuence Diagrams TRUE
11 Risk 4 Perform Quantitative Analysis 3 Outputs 1 Project Documents Updates TRUE 1 Risk Report TRUE

Page 12/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

11 Risk 5 Plan Risk Responses 1 Inputs 1 Project Management Plan TRUE 2 Resource Management Plan TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 3 Risk Management Plan TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 4 Cost Baseline TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 2 Project Schedule TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 3 Project Team Assignments TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 4 Resource Calendars TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 5 Risk Register TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 6 Risk Report TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 7 Stakeholder Register TRUE
11 Risk 5 Plan Risk Responses 1 Inputs 3 Enterprise Environmental Factors TRUE 0
11 Risk 5 Plan Risk Responses 1 Inputs 4 Organizational Process Assets TRUE 0
11 Risk 5 Plan Risk Responses 2 Tools/Techs 1 Expert Judgment TRUE 0
11 Risk 5 Plan Risk Responses 2 Tools/Techs 2 Data Gathering TRUE 1 Interviews TRUE
11 Risk 5 Plan Risk Responses 2 Tools/Techs 3 Interpersonal And Team Skills TRUE 1 Facilitation TRUE
11 Risk 5 Plan Risk Responses 2 Tools/Techs 4 Strategies For Threats TRUE 0
11 Risk 5 Plan Risk Responses 2 Tools/Techs 5 Strategies For Opportunities TRUE 0
11 Risk 5 Plan Risk Responses 2 Tools/Techs 6 Contingent Response Strategies TRUE 0
11 Risk 5 Plan Risk Responses 2 Tools/Techs 7 Strategies For Overall Project Risk TRUE 0
11 Risk 5 Plan Risk Responses 2 Tools/Techs 8 Data Analysis TRUE 1 Alternative Analysis TRUE
11 Risk 5 Plan Risk Responses 2 Tools/Techs 2 Cost-Benefit Analysis2 TRUE
11 Risk 5 Plan Risk Responses 2 Tools/Techs 9 Decision Making TRUE 1 Multicriteria Decision Analysis TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 1 Change Requests TRUE 0
11 Risk 5 Plan Risk Responses 3 Outputs 2 Project Management Plan Updates TRUE 1 Schedule Management Plan TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 2 Cost Management Plan TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 3 Quality Management Plan TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 4 Resource Management Plan TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 5 Procurement Management Plan TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 6 Scope Baseline TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 7 Schedule Baseline TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 8 Cost Baseline TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 3 Project Documents Updates TRUE 1 Assumption Log TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 2 Cost Forecasts TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 3 Lessons Learned Register TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 4 Project Schedule TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 5 Project Team Assignments TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 6 Risk Register TRUE
11 Risk 5 Plan Risk Responses 3 Outputs 7 Risk Report TRUE
11 Risk 6 Implement Risk Responses 1 Inputs 1 Project Management Plan TRUE 1 Risk Management Plan TRUE
11 Risk 6 Implement Risk Responses 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
11 Risk 6 Implement Risk Responses 1 Inputs 2 Risk Register TRUE
11 Risk 6 Implement Risk Responses 1 Inputs 3 Risk Report TRUE
11 Risk 6 Implement Risk Responses 1 Inputs 3 Organizational Process Assets TRUE 0
11 Risk 6 Implement Risk Responses 2 Tools/Techs 1 Expert Judgment TRUE 0
11 Risk 6 Implement Risk Responses 2 Tools/Techs 2 Interpersonal And Team Skills TRUE 1 Influencing TRUE
11 Risk 6 Implement Risk Responses 2 Tools/Techs 3 Project Management Information Systems TRUE 0
11 Risk 6 Implement Risk Responses 3 Outputs 1 Change Requests TRUE 0
11 Risk 6 Implement Risk Responses 3 Outputs 2 Project Documents Updates TRUE 1 Issue Log TRUE
11 Risk 6 Implement Risk Responses 3 Outputs 2 Lessons Learned Register TRUE
11 Risk 6 Implement Risk Responses 3 Outputs 3 Project Team Assignments TRUE
11 Risk 6 Implement Risk Responses 3 Outputs 4 Risk Register TRUE
11 Risk 6 Implement Risk Responses 3 Outputs 5 Risk Report TRUE
11 Risk 7 Monitor Risks 1 Inputs 1 Project Management Plan TRUE 1 Risk Management Plan TRUE
11 Risk 7 Monitor Risks 1 Inputs 2 Project Documents TRUE 1 Issue Log TRUE
11 Risk 7 Monitor Risks 1 Inputs 2 Lessons Learned Register TRUE
11 Risk 7 Monitor Risks 1 Inputs 3 Risk Register TRUE
11 Risk 7 Monitor Risks 1 Inputs 4 Risk Report TRUE
11 Risk 7 Monitor Risks 1 Inputs 3 Work Performance Data TRUE 0
11 Risk 7 Monitor Risks 1 Inputs 4 Work Performance Reports TRUE 0
11 Risk 7 Monitor Risks 2 Tools/Techs 1 Data Analysis TRUE 1 Technical Performance Analysis TRUE
11 Risk 7 Monitor Risks 2 Tools/Techs 2 Reserve Analysis TRUE
11 Risk 7 Monitor Risks 2 Tools/Techs 2 Audits TRUE 0
11 Risk 7 Monitor Risks 2 Tools/Techs 3 Meetings TRUE 0
11 Risk 7 Monitor Risks 3 Outputs 1 Work Performance Information TRUE 0
11 Risk 7 Monitor Risks 3 Outputs 2 Change Requests TRUE 0
11 Risk 7 Monitor Risks 3 Outputs 3 Project Management Plan Updates TRUE 1 Any Component TRUE
11 Risk 7 Monitor Risks 3 Outputs 4 Project Documents Updates TRUE 1 Assumption Log TRUE
11 Risk 7 Monitor Risks 3 Outputs 2 Issue Log TRUE
11 Risk 7 Monitor Risks 3 Outputs 3 Lessons Learned Register TRUE
11 Risk 7 Monitor Risks 3 Outputs 4 Risk Register TRUE
11 Risk 7 Monitor Risks 3 Outputs 5 Risk Report TRUE
11 Risk 7 Monitor Risks 3 Outputs 5 Organizational Process Assets Updates TRUE 0

Page 13/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

12 Procurement 1 Plan Procurement Management 1 Inputs 1 Project Charter TRUE 0


12 Procurement 1 Plan Procurement Management 1 Inputs 2 Business Documents TRUE 1 Business Case TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 2 Benefits Management Plan TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 3 Project Management Plan TRUE 1 Scope Management Plan TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 2 Quality Management Plan TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 3 Resource Management Plan TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 4 Scope Baseline TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 4 Project Documents TRUE 1 Milestone List TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 2 Project Team Assignments TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 3 Requirements Documentation TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 4 Requirements Traceability Matrix TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 5 Resource Requirements TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 6 Risk Register TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 7 Stakeholder Register TRUE
12 Procurement 1 Plan Procurement Management 1 Inputs 5 Enterprise Environmental Factors TRUE 0
12 Procurement 1 Plan Procurement Management 1 Inputs 6 Organizational Process Assets TRUE 0
12 Procurement 1 Plan Procurement Management 2 Tools/Techs 1 Expert Judgment TRUE 0
12 Procurement 1 Plan Procurement Management 2 Tools/Techs 2 Data Gathering TRUE 1 Market Research TRUE
12 Procurement 1 Plan Procurement Management 2 Tools/Techs 3 Data Analysis TRUE 1 Make-Or-Buy Analysis TRUE
12 Procurement 1 Plan Procurement Management 2 Tools/Techs 4 Source Selection Analysis TRUE 0
12 Procurement 1 Plan Procurement Management 2 Tools/Techs 5 Meetings TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 1 Procurement Management Plan TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 2 Procurement Strategy TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 3 Bid Documents TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 4 Procurement Statement Of Work TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 5 Source Selection Criteria TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 6 Make-Or-Buy Decisions TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 7 Independent Cost Estimates TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 8 Change Requests TRUE 0
12 Procurement 1 Plan Procurement Management 3 Outputs 9 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
12 Procurement 1 Plan Procurement Management 3 Outputs 2 Milestone List TRUE
12 Procurement 1 Plan Procurement Management 3 Outputs 3 Requirements Documentation TRUE
12 Procurement 1 Plan Procurement Management 3 Outputs 4 Requirements Traceability Matrix TRUE
12 Procurement 1 Plan Procurement Management 3 Outputs 5 Risk Register TRUE
12 Procurement 1 Plan Procurement Management 3 Outputs 6 Stakeholder Register TRUE
12 Procurement 1 Plan Procurement Management 3 Outputs 10 Organizational Process Assets Updates TRUE 0
12 Procurement 2 Conduct Procurements 1 Inputs 1 Project Management Plan TRUE 1 Scope Management Plan TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 2 Requirements Management Plan TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 3 Communications Management Plan TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 4 Risk Management Plan TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 5 Procurement Management Plan TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 6 Configuration Management Plan TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 7 Cost Baseline TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 2 Project Documents TRUE 1 Lessons Learned Register TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 2 Project Schedule TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 3 Requirements Documentation TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 4 Risk Register TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 5 Stakeholder Register TRUE
12 Procurement 2 Conduct Procurements 1 Inputs 3 Procurement Documentation TRUE 0
12 Procurement 2 Conduct Procurements 1 Inputs 4 Seller Proposals TRUE 0
12 Procurement 2 Conduct Procurements 1 Inputs 5 Enterprise Environmental Factors TRUE 0
12 Procurement 2 Conduct Procurements 1 Inputs 6 Organizational Process Assets TRUE 0
12 Procurement 2 Conduct Procurements 2 Tools/Techs 1 Expert Judgment TRUE 0
12 Procurement 2 Conduct Procurements 2 Tools/Techs 2 Advertising TRUE 0
12 Procurement 2 Conduct Procurements 2 Tools/Techs 3 Bidder Conferences TRUE 0
12 Procurement 2 Conduct Procurements 2 Tools/Techs 4 Data Analysis TRUE 1 Proposal Evaluation Techniques TRUE
12 Procurement 2 Conduct Procurements 2 Tools/Techs 5 Interpersonal And Team Skills TRUE 1 Negotiation TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 1 Selected Sellers TRUE 0
12 Procurement 2 Conduct Procurements 3 Outputs 2 Agreements TRUE 0
12 Procurement 2 Conduct Procurements 3 Outputs 3 Change Requests TRUE 0
12 Procurement 2 Conduct Procurements 3 Outputs 4 Project Management Plan Updates TRUE 1 Requirements Management Plan TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 2 Quality Management Plan TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 3 Communications Management Plan TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 4 Risk Management Plan TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 5 Procurement Management Plan TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 6 Scope Baseline TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 7 Schedule Baseline TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 8 Cost Baseline TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 5 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 2 Requirements Documentation TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 3 Requirements Traceability Matrix TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 4 Resource Calendars TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 5 Risk Register TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 6 Stakeholder Register TRUE
12 Procurement 2 Conduct Procurements 3 Outputs 6 Organizational Process Assets Updates TRUE 0

Page 14/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

12 Procurement 3 Control Procurements 1 Inputs 1 Project Management Plan TRUE 1 Requirements Management Plan TRUE
12 Procurement 3 Control Procurements 1 Inputs 2 Risk Management Plan TRUE
12 Procurement 3 Control Procurements 1 Inputs 3 Procurement Management Plan TRUE
12 Procurement 3 Control Procurements 1 Inputs 4 Change Management Plan TRUE
12 Procurement 3 Control Procurements 1 Inputs 5 Schedule Baseline TRUE
12 Procurement 3 Control Procurements 1 Inputs 2 Project Documents TRUE 1 Assumption Log TRUE
12 Procurement 3 Control Procurements 1 Inputs 2 Lessons Learned Register TRUE
12 Procurement 3 Control Procurements 1 Inputs 3 Milestone List TRUE
12 Procurement 3 Control Procurements 1 Inputs 4 Quality Reports TRUE
12 Procurement 3 Control Procurements 1 Inputs 5 Requirements Documentation TRUE
12 Procurement 3 Control Procurements 1 Inputs 6 Requirements Traceability Matrix TRUE
12 Procurement 3 Control Procurements 1 Inputs 7 Risk Register TRUE
12 Procurement 3 Control Procurements 1 Inputs 8 Stakeholder Register TRUE
12 Procurement 3 Control Procurements 1 Inputs 3 Agreements TRUE 0
12 Procurement 3 Control Procurements 1 Inputs 4 Procurement Documentation TRUE 0
12 Procurement 3 Control Procurements 1 Inputs 5 Approved Change Requests TRUE 0
12 Procurement 3 Control Procurements 1 Inputs 6 Work Performance Data TRUE 0
12 Procurement 3 Control Procurements 1 Inputs 7 Enterprise Environmental Factors TRUE 0
12 Procurement 3 Control Procurements 1 Inputs 8 Organizational Process Assets TRUE 0
12 Procurement 3 Control Procurements 2 Tools/Techs 1 Expert Judgment TRUE 0
12 Procurement 3 Control Procurements 2 Tools/Techs 2 Claims Administration TRUE 0
12 Procurement 3 Control Procurements 2 Tools/Techs 3 Data Analysis TRUE 1 Performance Reviews TRUE
12 Procurement 3 Control Procurements 2 Tools/Techs 2 Earned Value Analysis TRUE
12 Procurement 3 Control Procurements 2 Tools/Techs 3 Trend Analysis TRUE
12 Procurement 3 Control Procurements 2 Tools/Techs 4 Inspection TRUE 0
12 Procurement 3 Control Procurements 2 Tools/Techs 5 Audits TRUE 0
12 Procurement 3 Control Procurements 3 Outputs 1 Closed Procurements TRUE 0
12 Procurement 3 Control Procurements 3 Outputs 2 Work Performance Information TRUE 0
12 Procurement 3 Control Procurements 3 Outputs 3 Procurement Documentation Updates TRUE 0
12 Procurement 3 Control Procurements 3 Outputs 4 Change Requests TRUE 0
12 Procurement 3 Control Procurements 3 Outputs 5 Project Management Plan Updates TRUE 1 Risk Management Plan TRUE
12 Procurement 3 Control Procurements 3 Outputs 2 Procurement Management Plan TRUE
12 Procurement 3 Control Procurements 3 Outputs 3 Schedule Baseline TRUE
12 Procurement 3 Control Procurements 3 Outputs 4 Cost Baseline TRUE
12 Procurement 3 Control Procurements 3 Outputs 6 Project Documents Updates TRUE 1 Lessons Learned Register TRUE
12 Procurement 3 Control Procurements 3 Outputs 2 Resource Requirements TRUE
12 Procurement 3 Control Procurements 3 Outputs 3 Requirements Traceability Matrix TRUE
12 Procurement 3 Control Procurements 3 Outputs 4 Risk Register TRUE
12 Procurement 3 Control Procurements 3 Outputs 5 Stakeholder Register TRUE
12 Procurement 3 Control Procurements 3 Outputs 7 Organizational Process Assets Updates TRUE 0
13 Stakeholder 1 Identify Stakeholders 1 Inputs 1 Project Charter TRUE 0
13 Stakeholder 1 Identify Stakeholders 1 Inputs 2 Business Documents TRUE 1 Business Case TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 2 Benefits Management Plan TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 3 Project Management Plan TRUE 1 Communications Management Plan TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 2 Stakeholder Engagement Plan TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 4 Project Documents TRUE 1 Change Log TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 2 Issue Log TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 3 Requirements Documentation TRUE
13 Stakeholder 1 Identify Stakeholders 1 Inputs 5 Agreements TRUE 0
13 Stakeholder 1 Identify Stakeholders 1 Inputs 6 Enterprise Environmental Factors TRUE 0
13 Stakeholder 1 Identify Stakeholders 1 Inputs 7 Organizational Process Assets TRUE 0
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 1 Expert Judgment TRUE 0
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 2 Data Gathering TRUE 1 Questionnaires And Surveys TRUE
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 2 Brainstorming TRUE
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 3 Data Analysis TRUE 1 Stakeholder Analysis TRUE
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 2 Document Analysis TRUE
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 4 Data Representation TRUE 1 Stakeholder Mapping/ Representation TRUE
13 Stakeholder 1 Identify Stakeholders 2 Tools/Techs 5 Meetings TRUE 0
13 Stakeholder 1 Identify Stakeholders 3 Outputs 1 Stakeholder Register TRUE 0
13 Stakeholder 1 Identify Stakeholders 3 Outputs 2 Change Requests TRUE 0
13 Stakeholder 1 Identify Stakeholders 3 Outputs 3 Project Management Plan Updates TRUE 1 Requirements Management Plan TRUE
13 Stakeholder 1 Identify Stakeholders 3 Outputs 2 Communications Management Plan TRUE
13 Stakeholder 1 Identify Stakeholders 3 Outputs 3 Risk Management Plan TRUE
13 Stakeholder 1 Identify Stakeholders 3 Outputs 4 Stakeholder Engagement Plan TRUE
13 Stakeholder 1 Identify Stakeholders 3 Outputs 4 Project Documents Updates TRUE 1 Assumption Log TRUE
13 Stakeholder 1 Identify Stakeholders 3 Outputs 2 Issue Log TRUE
13 Stakeholder 1 Identify Stakeholders 3 Outputs 3 Risk Register TRUE

Page 15/16
664 100% 0%
No Process Group No Process1 No Attribute No Value1 CHECK1 No Tools/Techs CHECK2

13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 1 Project Charter TRUE 0


13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 2 Project Management Plan TRUE 1 Resource Management Plan TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 2 Communications Management Plan TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 3 Risk Management Plan TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 3 Project Documents TRUE 1 Assumption Log TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 2 Change Log TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 3 Issue Log TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 4 Project Schedule TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 5 Risk Register TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 6 Stakeholder Register TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 4 Agreements TRUE 0
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 5 Enterprise Environmental Factors TRUE 0
13 Stakeholder 2 Plan Stakeholder Engagement 1 Inputs 6 Organizational Process Assets TRUE 0
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 1 Expert Judgment TRUE 0
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 2 Data Gathering TRUE 1 Benchmarking TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 3 Data Analysis TRUE 1 Assumption And Constraint Analysis TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 2 Root Cause Analysis TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 4 Decision Making TRUE 1 Prioritization/ Ranking TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 5 Data Representation TRUE 1 Mind-Mapping TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 2 Stakeholder Engagement Assessment Matrix TRUE
13 Stakeholder 2 Plan Stakeholder Engagement 2 Tools/Techs 6 Meetings TRUE 0
13 Stakeholder 2 Plan Stakeholder Engagement 3 Outputs 1 Stakeholder Engagement Plan TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 1 Project Management Plan TRUE 1 Communications Management Plan TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 2 Risk Management Plan TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 3 Stakeholder Engagement Plan TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 4 Change Management Plan TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 2 Project Documents TRUE 1 Change Log TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 2 Issue Log TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 3 Lessons Learned Register TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 4 Stakeholder Register TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 3 Enterprise Environmental Factors TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 1 Inputs 4 Organizational Process Assets TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 1 Expert Judgment TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 2 Communication Skills TRUE 1 Feedback TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 3 Interpersonal And Team Skills TRUE 1 Conflict Management TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 2 Cultural Awareness TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 3 Negotiation TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 4 Observation/ Conversation TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 5 Political Awareness TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 4 Ground Rules TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 2 Tools/Techs 5 Meetings TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 1 Change Requests TRUE 0
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 2 Project Management Plan Updates TRUE 1 Communications Management Plan TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 2 Stakeholder Engagement Plan TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 3 Project Documents Updates TRUE 1 Change Log TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 2 Issue Log TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 3 Lessons Learned Register TRUE
13 Stakeholder 3 Manage Stakeholder Engagement 3 Outputs 4 Stakeholder Register TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 1 Project Management Plan TRUE 1 Communications Management Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 2 Risk Management Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 3 Stakeholder Engagement Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 4 Change Management Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 2 Project Documents TRUE 1 Change Log TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 2 Issue Log TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 3 Lessons Learned Register TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 4 Stakeholder Register TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 3 Work Performance Data TRUE 0
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 4 Enterprise Environmental Factors TRUE 0
13 Stakeholder 4 Monitor Stakeholder Engagement 1 Inputs 5 Organizational Process Assets TRUE 0
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 1 Data Analysis TRUE 1 Alternative Analysis TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 2 Root Cause Analysis TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 3 Stakeholder Analysis TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 2 Decision Making TRUE 1 Multicriteria Decision Analysis TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 2 Voting TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 3 Data Representation TRUE 1 Stakeholder Engagement Assessment Matrix TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 4 Communication Skills TRUE 1 Feedback TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 2 Presentations TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 5 Interpersonal And Team Skills TRUE 1 Active Listening TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 2 Cultural Awareness TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 3 Leadership TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 4 Networking TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 5 Political Awareness TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 2 Tools/Techs 6 Meetings TRUE 0
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 1 Work Performance Information TRUE 0
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 2 Change Requests TRUE 0
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 3 Project Management Plan Updates TRUE 1 Resource Management Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 2 Communications Management Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 3 Stakeholder Engagement Plan TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 4 Project Documents Updates TRUE 1 Issue Log TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 2 Lessons Learned Register TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 3 Risk Register TRUE
13 Stakeholder 4 Monitor Stakeholder Engagement 3 Outputs 4 Stakeholder Register TRUE