0% found this document useful (0 votes)
259 views1 page

17.master Switch in SLR

A document shows the status of shifting master switches in two railway depots. It lists the total number of self-propelled railcars held by each depot, how many had their master switches shifted in the past month, and how many remain to be switched. The TL/BJU depot has shifted 1 switch out of 21 cars held, leaving 20 remaining to shift. The TL/MFP depot has shifted an unspecified number, leaving 3 cars' switches left to shift out of 14 total.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
259 views1 page

17.master Switch in SLR

A document shows the status of shifting master switches in two railway depots. It lists the total number of self-propelled railcars held by each depot, how many had their master switches shifted in the past month, and how many remain to be switched. The TL/BJU depot has shifted 1 switch out of 21 cars held, leaving 20 remaining to shift. The TL/MFP depot has shifted an unspecified number, leaving 3 cars' switches left to shift out of 14 total.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

17.

status of shifting of master switch in SLR:-

Balance SLR in which


progress during Total SLR in which master
S.No. Name of the depot Total SLR (Holding) master switch yet to be
the month switch already be shifted shifted

1 TL/BJU 21 1 20 Nil
2 TL/MFP 14 ……… 11 3