Hydraulic design of proposed sewer main at Delawas Existing
STP campus
Invert level of existing chamber inside the campus =
Free fall in the exi. Chamber inside the campus =
Length of sewer between these chambers =
Dia of Existing sewer =
Slope in existing sewer =
Invert level of existing chamber outside the campus =
Distance of the proposed sewer from outside chamber to diversion
chamber =
free fall of sewer at Diversion chamber =
Invert level of Diversion chamber =
Capacity adopted for proposed main sewer for design year 2051 =
Say
Dia of Sewer Proposed =
Velocity assumed in proposed sewer =
Manning's coefficient =
Wetted perimeter for max depth of sewer as 0.8D =
Area of sewer =
Hydraulic mean depth =
Slope in sewer =
1 in
Calculation for invert level of intermediate chambers
Upstream sewer Slope
S.no. IC No. Free fall (MM) Invert level (M)
length (meter) (1 in)
1 IC-1 62 1371 50 358.110
2 IC-2 90 1371 50 357.994
3 IC-3 89 1371 50 357.879
4 IC-4 75 1371 50 357.774
5 IC-5 79 1371 50 357.667
6 IC-6 72 1371 50 357.564
Receiving
6 chamber 86 1371 50 357.452
Delawas Existing
358.205 M
50 MM
80 M
1800 MM
1200
358.257 M
20 M
35 MM
358.205 M
150 MLD
1.736 M3/Sec
1400 MM
1.128 M/Sec
0.015
3.100 M
1.54 Sqm
0.496 M
0.000729
1371
Invert level (M)
358.110
357.994
357.879
357.774
357.667
357.564
357.452