Hydraulic Design of Proposed Sewer Main at Delawas Existing STP Campus

The document discusses the hydraulic design of a proposed sewer main connecting to an existing sewage treatment plant (STP) campus. It provides details on invert levels, distances, diameters, slopes, and calculations of invert levels for intermediate chambers of the new sewer main. The capacity adopted for the proposed main sewer is 150 MLD (1.736 cubic meters per second) with a diameter of 1400 mm and slope of 1 in 1371.

Uploaded by

Rajesh Gangwal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views2 pages

Hydraulic Design of Proposed Sewer Main at Delawas Existing STP Campus

The document discusses the hydraulic design of a proposed sewer main connecting to an existing sewage treatment plant (STP) campus. It provides details on invert levels, distances, diameters, slopes, and calculations of invert levels for intermediate chambers of the new sewer main. The capacity adopted for the proposed main sewer is 150 MLD (1.736 cubic meters per second) with a diameter of 1400 mm and slope of 1 in 1371.

Uploaded by

Rajesh Gangwal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Hydraulic design of proposed sewer main at Delawas Existing

STP campus

Invert level of existing chamber inside the campus =


Free fall in the exi. Chamber inside the campus =
Length of sewer between these chambers =
Dia of Existing sewer =
Slope in existing sewer =
Invert level of existing chamber outside the campus =

Distance of the proposed sewer from outside chamber to diversion


chamber =
free fall of sewer at Diversion chamber =
Invert level of Diversion chamber =

Capacity adopted for proposed main sewer for design year 2051 =
Say
Dia of Sewer Proposed =
Velocity assumed in proposed sewer =
Manning's coefficient =
Wetted perimeter for max depth of sewer as 0.8D =
Area of sewer =
Hydraulic mean depth =
Slope in sewer =
1 in
Calculation for invert level of intermediate chambers
Upstream sewer Slope
S.no. IC No. Free fall (MM) Invert level (M)
length (meter) (1 in)
1 IC-1 62 1371 50 358.110
2 IC-2 90 1371 50 357.994
3 IC-3 89 1371 50 357.879
4 IC-4 75 1371 50 357.774
5 IC-5 79 1371 50 357.667
6 IC-6 72 1371 50 357.564
Receiving
6 chamber 86 1371 50 357.452
Delawas Existing

358.205 M
50 MM
80 M
1800 MM
1200
358.257 M

20 M
35 MM
358.205 M

150 MLD
1.736 M3/Sec
1400 MM
1.128 M/Sec
0.015
3.100 M
1.54 Sqm
0.496 M
0.000729
1371

Invert level (M)

358.110
357.994
357.879
357.774
357.667
357.564

357.452